水閘水壩 的英文怎麼說

中文拼音 [shuǐzháshuǐ]
水閘水壩 英文
dam
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : anchor gate
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 水閘 : water gate; water lock; penstock; dam; sluice; pen; sasse; canal-lock
  • 水壩 : dam; pen
  1. The dark flat wilderness beyond the churchyard was intersected with dykes and mounds and gates.

    墓地對面那一大片黑壓壓的荒地就是沼地,沼地上堤縱橫,橫一個土墩,豎一道
  2. A fracture dynamics analysis is given to an accident on a gudgeon link of the miter gate of a dam

    摘要對某人字門拉桿斷裂事故進行斷裂動力學的定性與定量分析。
  3. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,庫產生泥沙異重流的機率較大,能否運動到前排出庫外,還要看異重流潛入點位置、入庫流量、洪峰歷時、入庫含沙量、門運用等因素,需要做好異重流預報監測工作。
  4. Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control

    第三十七條任何單位和個人不得破壞、侵佔、毀損庫大、堤防、、護岸、抽站、排渠系等防洪工程和文、通信設施以及防汛備用的器材、物料等。
  5. " if we hadn ' t opened the discharge gate, the dam might have overflowed and the losses would have been much more serious, " he added

    他還說: 「如果我們不開,那庫區的就會溢出大造成更嚴重的損失。 」
  6. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂電站位於四川省阿藏族羌族自治州汶川縣境內的岷江河段上,電站為低式開發。正常蓄位1268 . 0m ,最大高31m ,庫容297 . 4萬m ~ 3 ,引隧洞長19 . 57km ,裝機360mw 。福堂電站建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  7. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國電事業也迎來了迅猛發展的大好時機,一批高電站正在建設或規劃之中,其泄建築物孔口及頭愈來愈大,常規混凝土或鋼筋混凝土墩結構難以承受如此之大的推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  8. Study on repair technique of sluice and dam destroyed by flood

    毀攔河修復修補技術研究
  9. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運河起自廣東省東莞市橋頭縣,流經司馬、旗嶺、馬灘、塘廈、竹塘、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河和八級抽站。
  10. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子電站攔河及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #段溫控並縫措施研究:為廠房段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱基(肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程體的靜動力安全穩定性及溫控方案提供依據。
  11. Reinnovation of erjiang discharging sluice automatic monitoring system at gezhouba project

    葛洲二江泄自動監測系統更新改造
  12. In the construction period, the shiplocks are managed through the method of being entrusted to three gorges navigation administration of communication ministry by the proprietor of water conservancy project ( i. e. three gorges development company ), by which the project ' s construction smoothness and gezhouba dam ' s and three gorges dam ' s navigation

    三峽利樞紐施工期船管理採取的是由業主(三峽開發總公司)委託交通部所屬長江三峽通航管理局管理的方式,該方式保障了三峽工程施工順利和葛洲、三峽航運暢通,但畢竟是工程施工期的過渡辦法,工程完工後必須建立武漢理工大學工程碩士學位論文新的船管理體制。
  13. Article 44 during the flood reason, the use of reservoirs, sluices, dams and other water engineering structures must be subjected to the command, control and supervision of the relevant flood control headquarters

    第四十四條在汛期,庫、和其他工程設施的運用,必須服從有關的防汛指揮機構的調度指揮和監督。
  14. The article introduces the waterproofing and drainage measures and materials for the dam, the foundation of the permanent lock and some buildings of the three gorges project

    介紹了三峽工程中大、永久船基礎及一些建築物的防排措施和所用材料。
  15. The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2

    結果表明,墩河海大學博士論文的存在抬高了面線的位置,其中在墩頭部尤其明顯;墩型對流量系數和面壓力影響較大, 3a型墩相對於2型墩具有更大的流量系數和更小的面壓力:不同的墩厚寬比t / b對泄流能力也將產生顯著的影響,隨著墩厚寬比的增加,面壓力降低,而當t / b二0 . 2時溢流具有更大的流量系數。
  16. The unavoidable flooding of villages occurred when authorities opened sluice gates at a dam on guangdong ' s hanjiang river because water there was building up to too high a level, it said

    報道稱,由於廣東韓江位過高,當地政府開啟了一座的泄洪,從而不可避免地淹沒了這些村落。
  17. Seepage inspection underwater and repair for upstream gate shaft in wanyao reservoir

    碗窖庫上游門井下滲漏檢查和防滲施工
  18. According to the structure layout of futang power station design, geological parameters and calculation results of seepage, the stability and stress of gate chamber and retaining dam are calculated, the security index and stress of anti - slide can can meet the requirement of criterion

    根據福堂電站工程設計的結構布置情況、地質參數及滲流計算成果,對室和擋穩定、應力進行了計算,其抗滑穩定安全系數及應力標準均滿足規范的要求。
  19. The results will be helpful to reveal the causes of the accident and to provide suggestions of precaution to avoid similar accidents

    分析結果有助於防止人字門拉桿類似事故的發生以及採取相關措施。
  20. In the practice application, the project ? the large dam secure supervising and measuring system of taipu brake, which the penman participated himself, is introduced in detail, which includes the system synopsis, the definition of the pressure, the crack, the horizontal displacement and the vertical displacement, the compare of diversified measuring methods, the choice of the instruments and the configuration of the instruments, the system network topology configuration, the collocation of various metrical dots and instruments " demarcating and testing, the system software and the application software, the communications between the intelligent instruments and the primary interfaces of actual system

    在實踐應用方面,詳細介紹了筆者親自參與實施的工程? ?太浦安全監測系統,包括系統簡介,揚壓力、裂縫、平位移和垂直位移的定義,各種測量方法的比較,儀器的選型以及儀器的結構,系統的網路拓撲結構,各測點的布置以及儀器的標定測試,系統軟體和應用軟體,智能儀器與上位機的通信,實際系統的主要界面。為了論文的完整性,介紹了大安全監測專家系統。
分享友人