水電設計 的英文怎麼說
中文拼音 [shuǐdiànshèjì]
水電設計
英文
hydroelectric scheme- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 電 : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
- 設 : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 水電 : hydroelectricity; hydropower; water and electricity
- 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
-
This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results
本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。On the demand of application and according to the soluhons menhoned above, a method of displacement waiting auto - sy ' nchronizing is put forward, which is based on match filters. at the end a complete and speeflc set of hardware circuits and software programs which haplements the scheme, is also presented in the ancle. the synchronization system was tested in the pool and in the shallow wate near m port, the result of the test shows that its performance is satisfactory
論文著重介紹實現了跳頻通信系統同步的一般方法,並詳細分析和對比跳頻同步系統的捕獲方案,在此基礎上,提出了一個基於匹配濾波器的位移等待式自同步方案,設計、完成並給出了詳細硬體連線電路圖、軟體程序流程圖和部分程序清單,該自同步方法在實驗室水池實驗取得良好的效果,並在廈門港海域進行了現場實驗測試,具有較低的誤碼率和一定的檢測概率,結果令人滿意。Six foundation works : first, projects to prevent flood, avoiding huai river overflow again ; second, projects of comprehensive traffic, perfecting the highway, railway, waterway and aviating traffic network ; third, ecological environmental protection project to improve peoples living conditions and strengthen environmental ecological construction progressively ; fourth, construction of " digital fuyang ", realizing datamation of product design, automation of production process, and electronization of commercial market ; fifth, sincere project of fuyang, advancing all kinds of sincere institutional improvement of same trade, forming morals based on sincerity, and personal integrity ; sixth, talents market project, developing human resources diversely
六項基礎工程:一是防洪保安工程,切實根除淮河心腹之患;二是綜合交通工程,完善公、鐵、水、空綜合交通網路;三是生態環保工程,改善人居生活條件,加強環境生態建設;四是數字阜陽工程, .逐步實現產品設計數據化、生產過程自動化、營銷商務電子化;五是誠信阜陽工程,推進各類同業誠信制度建設,形成誠信為本、操守為重的社會風尚;六是人才強市工程,多方位開發人力資源。Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers
由於三峽工程水輪機技術上的復雜性和挑戰性,在左岸電站14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:水輪機設計水頭的確定,負傾角葉片水輪機的應用,兩套水力設計,舍棄初期轉輪,蝸殼進行水壓試驗等。Battery, maintenance - free, charger for maintenance - free batteries, disc brush, standard, longlife fan, tank - in - tank system
標準盤刷2個,箱中箱式水箱設計,免維護電瓶和充電器。長壽命抽吸風扇。Electrical - mechanical design code of hydropower plant
水力發電廠機電設計規范Of them, great current capacity high accuracy pump test panel project has carried on tender on the internet, finally passed through the quality synthetic evaluation, and determined to be constructed and exploited by province mechanical and electrical design institute unit. after the project completed, it could expand the new product productivity, and substitute the import product
其中大流量高精度泵測試臺項目進行了網上招標,最後經綜合評價,確定同省機電設計院聯合開發建設,項目建成后,能擴大新產品生產能力,並能替代進口產品,提高企業經濟效益是十分必要的,同時對提高我國泵類製造水平勞動地區,同行業發展也是有現實意義的。Code for designing auxiliary power system of hydro - power station
水力發電廠廠用電設計規程Design specification for intake of hydraulic and hydroelectric engineering
水利水電工程進水口設計規范While the scientific technology developing at a tremendous speed, the level of hydro - generator manufacturing is increasing. now the f - class insulation standard for generator is adopted, and cad for hydraulic design has spread, and advanced theory in hydraulic design is applied, and insulation materials are discovered, and precise processing techniques are under research. in the hydroelectric industry it ' s necessary to increase the generating units " installed capacity to take advantage of an old power plant and to raise the utilization ratio of water power energy
隨著科學技術的飛速發展,水力發電機的生產製造水平日益提高, f級絕緣在電機中的運用;計算機cad輔助水力設計的推廣,先進的水力設計理論的應用,新的電氣絕緣材料的發現,精密的加工工藝的研究,為了提高水能利用率,使老電站煥發青春,機組增容改造已是水電事業發展中一項不容忽視的工作。Ganfa is a diversified industrial corporation that engages in developing, manufacturing and marketing products in power generation, industrial pumps and electrical motors. with rmb 300 million of total assets, we are one of china s major manufacturer of hydraulic power generation equipments. we are located in ganzhou city, jiangxi province, south of china
贛發集團是以優勢企業為核心,以產品為聯系,以資產為紐帶的企業集團,由緊密層半緊密層公司聯合的大型水電設備泵類產品設計製造安裝的企業集團,現為江西贛州六大支柱產業之一,機電產業頭企業。However, some general requirements for architectural environment planning and design, presented by the criteria for water resources and hydro power design, can ' t satisfy the needs in the south - to - north water transfer project
目前水利水電設計規范標準對建築環境規劃設計只作出了一般性的要求,滿足不了南水北調工程建築環境規劃設計需要。Towards the company is the collection investment management, the actual operation property security, fire training, the entire line maintains cleanliness the maintenance, the botanical garden afforestation maintains, the water and electricity design, the work, the medical service, the transportation management, the work high above the ground service, the clean, the installment and so on is a body fund pool management company
升朝公司是集投資經營、實施管理的物業保安、消防培訓、全線保潔保養、園林綠化養護、水電設計、施工安裝、醫療服務、輸送管理、高空作業維修、清洗、安裝等為一體的綜合投資管理公司。Abstract : it was introduced in the paper on the basis of the famous tide model of s21hd, the sediment calulation for the design proposal of the reservoir of dandong power plant had been given by the newly setup generalized model of overall sediment which relying upon the data of original observation, and the relative wave model test conclusions and the forecast results of sediment by the joint action of wave and current were quoted
文摘:簡要介紹以著名的潮流模型s21hd為基礎,用新建的依賴于原觀資料的全沙沖淤概化模型,對丹東電廠蓄水庫設計方案進行的回淤計算;引述了相應的波浪模型試驗結論和浪、流聯合作用淤積預報結果。2. according to water resources and hydropower engineering specification for design of steel gate, mech - electric design handbook for hydropower station and with the consideration of the related theories on steel structure, this paper studies the design method and calculation theories of the plane gate. on the basis on above, the plain structure design subsystem is developed
2 、依據現行的《水利水電工程鋼閘門設計規范》 、 《水電站機電設計手冊》 ,綜合相關的鋼結構設計原理,研究了平面閘門的結構設計計算方法並研製開發了平面閘門結構設計子系統。Electrical water heaters ; rated capacity up to 1000 litres ; requirements for low - noice level design
電熱水器.額定容量為1000升以內.低噪聲水平設計的要3. according to specification for the navigation lock, water resources and hydropower engineering specification for design of steel gate, tnech - electric design handbook for hydropower station and with the consideration of the related theories on steel structure, this paper studies the design method and calculation theories of the miter gate. on the basis on above, the plain structure design subsystem is developed with intelligent function
3 、依據現行的《水利水電工程鋼閘門設計規范》 、 《船閘設計規范》 、 《水電站機電設計手冊》 ,綜合相關的鋼結構設計原理,研究了人字門的平面結構設計計算方法並研製開發了融入智能因素的人字門平面結構設計子系統。Lastiy the article introduces the basic demands of the connections between machine and man. usually, we apply software in the design of platform between machine and operator, the article introduces the functions of the computer control software, taking the general industry process control software - - kingview6. 0 for example, then introduces the application of computer supervisory control system in longdong hydro plant
最後就人機聯系以及水電廠計算機監控系統的人機聯系的基本要求作了介紹,在人機界面的設計中離不開系統軟體的應用,文中就計算機監控軟體,即通用的工業過程式控制制軟體組態王6 . 0的功能以及在龍洞電廠計算機監控系統中的應用作了介紹。Hydroenergy design code for small hydro power projects
小水電水能設計規程Secondly, it analyses various formats of scs. there are three kinds of scs from the view of how computer functions : casc ( computer assisted supervisory control ), cbsc ( computer based supervisorr control ) and ccsc ( computer conventional supervisory control ) ; there are four kinds from control method xoncentrative control system, function - scattered control system, equipment - distributed control system and completely open and distributed control system. at the same time, the article discusses the suitable control methods combining the control method with practical process
接著討論了當今水電站計算機監控系統的模式:以計算機在控制中的作用劃分,可分為計算機輔助監控系統( casc ) ,以計算機為基礎的監控系統( cbsc ) ,計算機和常規設備並存的監控系統( ccsc ) ;以控制的方式劃分,有集中式監控系統,功能分散式監控系統,分層分散式監控系統,全分佈全開放式監控系統。分享友人