水電站設備 的英文怎麼說

中文拼音 [shuǐdiànzhànshèbèi]
水電站設備 英文
equipment for hydroelectric station
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • 水電站 : [簡] (水力發電站) hydroelectric (power) station; hydropower station水電站自動化 automation of...
  • 水電 : hydroelectricity; hydropower; water and electricity
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  1. Starting with the application of power plant simulator, and for purpose of solving the practical problems of discommodious ness 、 subjective test result in the test of simulator training, summarizing the experience in the research and apply of the scoring system software of the test of simulator training, a operating skill model is built and a design for universal scoring system for the test of simulator training is brought forward based on the operating knowledge of power plant equipment and simulator and the theory of expert system. and the scoring system is realized by programming

    本文從模擬機的實際應用出發,以解決當前模擬機培訓考核中考核不方便、考核結果有失客觀性等實際問題為目的,總結目前關于模擬機培訓考核成績評定系統軟體的研究和應用的經驗,以和模擬機的各種運行知識為基礎,並結合專家系統的理論,建立一個評價模擬機學員操作平的模型,提出了一種模擬機培訓自動評分系統的計方法,並通過編程實現了這個成績評定系統。
  2. With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly

    四川網的二灘和500kv輸變系統投入運行后,由於二灘的大量力遠距離輸送至負荷中心,迫使負荷中心的火機組在豐期大量停機,使負荷中心失去壓支撐,大大降低了網的壓穩定平;同時,因為四川網中的無功補償裝置全為靜態無功補償容器(或抗器) ,這些只能在系統正常運行狀態下起到無功補償和壓支撐的作用,而在網出現事故時,不但不能起到壓支撐作用,反而會促使壓崩潰事故的發生。
  3. Electromechanical equipment guide for small hydroelectric installations

    導則
  4. The arrangement is applicable to the hydropower station with higher head or flow rate and has the advantages such as saving investment, flexible operation and simple electric installations ; which provides an another way with another alternative for hydropower station to select the hydro - generating facilities

    這種布置方式可適用於頭或流量變化較大的,具有節省投資、運行靈活、簡化等優點,為輪發機組的選擇提供了另一條途徑,增加了一個對比方案。
  5. According to the need of design code for anti - seismic of engineering constructure, the bedrock peak acceleration rate and response spectrum of exceeding probability of 63 %, 10 % and 2 % are given respectively and seismic motion parameters are also calculated, which will provide the evidences for anti - seismic design of this electric power equipment station

    按工程建築物抗震計規范要求,分別給出了50年63 % 、 10 %和2 %超越概率平的基巖峰值加速度及反應譜,計算出地震動參數,為該提供了抗震計依據。
  6. Guide for the procurement of power station equipment - hydraulic turbines, storage pumps and pump - turbines

    采購指南.輪機蓄泵和輪機
  7. Steel structure cross - sea bridge, port equipment, pipeline system, hydropower station equipment, paper making industry and other industries generally have problem of anticorrosion, out company has incomparable technical advantage, which can prevent the corrosion from happening, can proceed the coating operation under the supreme wet condition, can surpass the limit of surface treatment in the industrial protection, can provides long - term anticorrosion solution plan to various steel structures

    鋼結構跨海大橋,港口施、管路系統、水電站設備、造紙工業以及其他工業普遍存在著防腐蝕的問題,我們公司無與倫比的技術優勢,防止腐蝕的發生,可以在極端潮濕的條件下塗刷施工,可以在工業防護過程中超越表面處理的限制,為各種不同的鋼結構提供了長效防腐解決方案。
  8. But it also bring some important questions which affect the safety and economy running of the units, such as frequency regulation, long running with low loads, electric equipment and assistant equipment friction, oil wasting etc. the text apply differential increcent rate of equilateral discharge to analyze deeply the economy of hydro - power plant according to the practice data of the plant, putting forward the resolvation, providing indeed the theoretic feasibility investigation of engineering

    但由此帶來的機組的頻繁調節、長時間帶低負荷運行以及和輔助的磨損和油耗的增加等,都成為影響機組長期安全、經濟運行的不可忽視的重要問題。本文根據安徽陳村廠實際資料,運用等微增率方法對agc投入后廠內運行經濟性作了深入的分析,提出了解決辦法,為在工程上真正實現提供了理論上的可行性研究。
  9. Cracking problem has been approached by waterpower equipment manufacturers of all states, but it is not solved radically. cracking problem has been one of the key technical difficult subjects in dire need of solving

    各國的製造公司均投入人力物力,研究葉片開裂問題,但均未能從根本上解決該問題,葉片開裂已成為急需解決的關鍵技術難題之一。
  10. Csv series hydraulic control butterfly valve heavy hammer type of hydroelectric station which gathers together mechanism, electricity and hydraulics in the system is developed on the basis of foreign valve products

    希斯威系列型重錘式液控蝶閥是在引進國外同類產品的基礎上,經過不斷改進和完善,集機、、液於一體,是目前國內外先進的輪機進口控制
  11. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的計製造經驗,擁有多項專利技術,生產的同步發機永磁機技術工藝先進,製造精良,能滿足與各式輪機配套的不同技術條件要求。目前公司已製造投產的發機容量范圍為0 . 120mw ,具生產單擊容量50mw的能力,發機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高壓達13 . 8kv ,公司製造的甘肅永昌東河34500kw輪發機組,海拔為2868 . 5m ,成功解決了高原防暈等難題。公司擁有機試驗絕緣材料試驗室等先進的實驗室施和測試手段,使產品從原材料進產,到成品出產的各項器性能測試均能滿足計要求。
  12. Facilities for treatment for radioactive contaminated water in nuclear power plants ; methods

    放射性污處理.方法
  13. The arrange size of machine electricity equipments of langya shan hydropower station is very compact, and the craft form is also different from the formerly pump water station

    瑯琊山抽蓄能由於其特殊的地質條件,機布置尺寸較為緊湊,工藝布置形式也不同於以往的
  14. On the base of which, combining the practical project, the technology is applied in product process control of chemical examination station of the chemical water treatment workshop in one domestic large power plant, and the level of the automation and the device management is enhanced greatly

    並在此基礎上結合具體工程項目,將其實際應用於國內某大型發廠的化處理車間的化驗的生產過程式控制制中,大大提高自動化平和管理平。
  15. Recommended practice for the protection of electric equipment in nuclear power generating stations from water hazards

    施推薦規范
  16. Bid invitation on electromechanical equipment for letan hydropower station is an important part of the whole project bid invitation, the whole project has finished 50 bidding items in total, and the total sum of contract reaches rmb 561, 200, 000

    摘要樂灘招標是整個工程項目招標的重要部分,共完成了50個招標項目,合同總金額達56120萬多元。
  17. Practice proved that the option on electromechanical equipment for letan hydropower station was rational

    實踐證明,樂灘的選型是合理的。
  18. Guide for the procurement of power station equipment - turbine auxiliaries - feedwater heaters

    采購指南.渦輪機輔助.給加熱器
  19. Guide for procurement of power station equipment. part 6 - 2 : turbine auxiliaries. feedwater heaters

    的采購指南.第6 - 2部分:渦輪機輔助.供加熱器
  20. The system heighten the automation level of the non - attended substation, which improve the security of equipment and power supply

    由於該系統的應用使無人值守變的自動化平進一步提高,從而使變運行和供的可靠性大大提高。
分享友人