沉井施工 的英文怎麼說
中文拼音 [chénjǐngshīgōng]
沉井施工
英文
open caisson construction- 沉 : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
- 井 : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 施工 : be in the process of construction; be under construction; build; construction
-
Construction of pylon pier caisson of haikou shiji bridge
海口世紀大橋主墩沉井施工1 sedimentation anyslys of soil under the action of deadweight ; 2 sedimentation anyslys of structure in using ; 3 endogen force anyslys of structure in using ; 4 soil remolding type anyslys ; 5 homogenous flush works anyslys ; 6 anyslys of the structure sedimentation effects of different flushing amount at the same place ; 7 anyslys of the structure sedimentation effects of different flushing places ; 8 anyslys of the structure sedimentation effects of different horizontal flushing places ; 9 anyslys of the structure sedimentation effects of different vertical flushing places ; getting the different between the endogen force of common structure and that of slant structure. the rule of stricture sedimentation and the effect of different soil remolding type were also gained
對掏土糾偏過程做了以下9個方面的分析: 1 、土體在自重作用下的沉降分析; 2 、建築物在使用階段的沉降分析; 3 、建築物在使用階段的內力分析; 4 、土體受擾動類型分析; 5 、均勻沖水施工過程分析; 6 、同一個地方沖水量大小不同對建築物沉降影響分析; 7 、不同沉井沖水對建築物沉降影響分析; 8 、進深不同的土層沖水對建築物沉降影響分析; 9 、不同埋深土體沖水對建築物沉降影響分析。The methods for treating the sand drifting in the construction of the sunken shaft
關于沉井施工中流沙的處理方法The construction techniques of sinking well and explode in water are introduced. auto climbing form panel technique is applied in the construction of main tower
斜拉橋主橋墩設計為鋼筋混凝土圓端型沉井結構,其中詳細介紹了沉井下沉施工技術,同時介紹了水下松動控制爆破技術。In this paper, the construction techniques of linjiangmen cable - stayed bridge in jilin, such as large sinking well technique of pier, climbing form panel technique of main tower, stay rope formwork traveler technique of girder and construction control, are summarized in details
本文全面總結了吉林臨江門斜拉橋施工技術,詳細敘述了主墩大型沉井施工技術,主塔爬模施工技術,主梁牽索式掛籃施工新技術。斜拉索施工及施工控制等。High pressure rotary jet grouting applied to curtain construction of drop shaft sinking
高壓旋噴注漿法在沉井帷幕施工中的應用Through analyzing the structure of open caisson, and according to sinking stress principle, the paper introduced in the open caisson construction process sinking, correcting error, survey control as well as peculiar circumstance processing technical measure, such as in open caisson construction the inner - mold for sanding, framework supporting and steel binding, and concrete casting ; in open caisson sinking - control the sand in edge foot inner - mold, sand - pumping sinking, and pressure hydraulic monitor breaking and pressure - blowing sinking by air pressure blower etc
摘要根據下沉受力原理,分析了沉井結構,介紹了沉井施工過程中的下沉、糾偏、測量控制以及特殊情況處理的技術措施,如沉井製作中的填沙內模,模板支設和鋼筋綁扎,混凝土澆注;沉井下沉控制中的刃腳內模沙土,抽沙泵抽沙下沉,高壓水槍破壓、空壓機吹壓下沉等。During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation
在三維有限元計算中,對不同工況(沉井充填、錨體澆築、主纜架設、箱梁吊裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。The construction technology for sinking well of pfa layer
粉煤灰層沉井施工技術Experience of sunk well construction in the basis of basement
高層建築地下室基礎沉井施工經驗淺談Saveral methods to build sinking well
沉井施工的幾種方法The technique and application of the cast - in - site bored pile post - grouting construction
薄壁沉井法在挖孔樁基礎施工中的應用Construction technique of sand brick sinking pile in deep water
深水河中磚沉井挖孔樁施工技術Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985
自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁鋼沉井圍堰鉆孔樁基礎,鋼圍堰在橋梁基礎施工中的應用越來越多。The statistics on the measured data in a oil - field shows the submergence depth and discharge coefficient are very low, some key measures for improving discharge coefficient and sucker rod pump performance are presented ; the applications of discharge coefficient to practice are illustrated with examples
通過對某具體油田區塊測試數據分析,指出該區塊油井存在沉沒度、排量系數低的現象,提出了提高抽油泵排量系數、改善工作性能的措施。舉例說明了排量系數計算在生產管理中的應用。The plans selection, formation, construction of sunk wells and its correction for deflection during the subsidence of sunk well were introduced. the experience obtained from the engineering can be useful to the construction of basement of high - rise buildings in down town area
全面介紹了沉井方案的選擇、沉井的製作、施工及沉井下沉過程中的糾偏處理,為鬧市區高層建築物地下室的施工提供了成功經驗。The thesis introduces the biot ' s three - dimension consolidation theory based on absolute linear - elastic theory ; the thesis designs the pit dewatering scheme of hand - dug piles support of shenyang subway ' s shenyang station construction ; the thesis uses finite element program to simulate the influence on around environments caused by pit dewatering, and finds the change laws of earth mass inner stress and the effect parameters on the surface deformation on the basis of reasonable hypothesis and the analysis of ground water exploitation progress. combined with stochastic medium theory, the thesis introduces dewatering subsidence coefficient, sets up the predicting model of the surface deformation caused by dewatering, and develops the computing program ; by application of program on a single well of underwater exploitation, it is proved that the program is feasible, so the prediction of the surface deformation caused by underwater exploitation is realized
本文介紹了基於線彈性本構關系的biot理論;設計了擬建沈陽地鐵沈陽站點人工挖孔樁支護施工的基坑降水方案;利用有限元程序,模擬了基坑降水對周圍環境的影響;在合理假設的基礎上,分析了地下水開采過程中,地層應力的變化規律,找到了影響地面變形的參數;與隨機介質理論相結合,通過引入采水下沉系數建立了地下水開采引起地面變形的預計計算模型,並編制了電算化程序;通過某單井開采實例驗證了該方法的可行性,實現了地下水開采引起地面變形的預計。Aiming at the extension of mineral mines scale and increase of the goods transportation, the contradiction between the construction of foundation facilities in mine area or the city with disaster of highway subsidence caused by underground mining and open pit mining is getting more and more outstanding
摘要針對資源城市礦產開采規模的擴大和交通貨物運輸量的日益增長,使得井工、露天礦區基礎運輸設施建設以及與之緊鄰的城市交通建設和開采引起的公路沉陷災害的矛盾越來越突出。Deep well dewatering of soft soil two - layer structure excavation is a kind of economical and effective dewatering method to ensure waterproof in deep excavation. nevertheless its negative impact on is often unavoidable. deep excavation dewatering often leads to the formation of a depressing cone, which may cause the cracking and even the breaking of surrounding buildings and utilities
在軟土地區二元結構地層,採用深井降低承壓水,是保證深基坑施工作業的一種經濟有效的方法,但也存在著一定的負面影響,因為降水勢必會形成降水漏斗,而引起基坑周邊地面沉降,可能導致周邊建築物和公共設施的開裂或損壞。分享友人