沉陷計算 的英文怎麼說

中文拼音 [chénxiànsuàn]
沉陷計算 英文
settlement calculation
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : Ⅰ名詞1 (陷阱) pitfall; trap2 (缺點) defect; deficiency Ⅱ動詞1 (掉進) get stuck or bogged do...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • 沉陷 : 1. (下陷) sink; cave in 2. (沉降) sinkage; downpunching; depression; subsidence; [建築] settlement
  • 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
  1. Based on the example of south dump slope of anjialing open colliery in pingshuo, the rule of surface subsidence was studied using flac ( superscript 3d )

    摘要為研究露天煤礦排土場邊坡下采動規律,結合平朔安家嶺露天礦南排土場邊坡的實例,採用flac (上標3d )程序進行了數值模擬
  2. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、橋臺、涵洞等的不均勻降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。
  3. Based on the deposital velocity of the magnetic strata unit, the paper has worked out the velocity of the genetic unit of the basin utilizing the vertically evolutive map

    以磁性地層單元內的積速率為基礎,結合靜43 - 67井的垂向積相演化圖,出斷湖盆成因相的積速率。
  4. The article summarized the basic conditions of ningdong coal mining areas, calculated the numerical imitation of ground subsidence, gave the calculation formulas of the deformation volume, summarized the subsidence laws of the coal mining areas, and simply analyzed the causes and features of the ground subsidence

    摘要在概述寧東採煤區基本情況的基礎上,對其地表進行了數值模擬分析,給出了采區各變形量的公式,總結了其規律,簡析了地表的成因與特點,為綜合治理提供依據。
  5. In order to accurately calculate the mining induced subsidence in thick alluvium areas so as to decrease the mining damage and environment disruption, the calculation of surface subsidence caused by water loss of clay was discussed based on probability integral method and used in a real case

    摘要為了更加精確地厚沖積層礦區的煤礦開采問題,減小采動損害與環境破壞,基於煤礦開采沉陷計算的概率積分法,探討了由於黏土體失水引起的地表沉陷計算問題,推導了黏土體失水引起的地表下公式,並應用於煤礦實際地表,加以分析論證。
  6. The convergence and precision of the analytical solution in this case are studied and discussed to fill the space of the research

    本文對淺圓弧型積盆地解析解答的收斂性和精度做了研究和討論,彌補了以往工作中由於特殊函數數值的限製造成的這一方面研究的缺
  7. In this article, the new concepts, the new methods, and the new techniques of sedimentology, petroleum geology, reservoir geology are synthetically applied, and the computer technology are made full uses of, and the identifying, dividing and appraising of the two - formation - type sandstone & conglomerate reservoir fluid units of sha3 lower member and sha4 upper member systemically analyzed in yong " an town oilfield, dongying depression

    本文綜合應用積學和石油地質學、儲層地質學、動靜態油藏描述、新方法和新技術手段,最大限度地應用機技術,系統地分析研究了東營凹永安鎮油田沙三下段、沙四上段兩種成因類型的砂礫巖體的流動單元的識別和劃分及評價。
  8. The several ones that have more lager sensitivity to embankment settlement are found out. then, aimed at the traditional three - layer bp network ' s shortages : easily getting into local minimum value and slow convergence, the modification combined momentum method with self - adaptation study velocity is made, and one improved bp network is put forward. finally, according to the results from above sensitivity analyses, the nonlinear model main parameters of each natural layer in roadbed are approximately rectified using the improved bp network technology founded on its stronger nonlinear mapping capacity and the settlement measurements

    採用非線性有限元程序,對鄧肯-張模型中8個參數與路堤降的關系進行了詳細分析,找到了影響降的主要參數;接著,針對傳統的三層bp網路具有收斂速度慢、易入局部極小點等不足,對其進行了修正,提出了改進的bp神經網路模型;最後,根據上述靈敏度分析結果,基於改進的bp網路模型較強的非線性映射能力和前期降實測資料,對路基中各天然土層的非線性模型主要參數進行了反分析修正; ( 4 )路堤一維法中考慮應力歷史、側向變形的研究。
  9. The strata subsidence character and the subsidence history of tiaohu depression and malang depression was simulated based on the sediment filling pattern, compaction correction pattern and crustal equilibrium pattern by computer

    根據積物充填模型,壓實較正模型和地殼均衡模型,利用機對三塘湖盆地條湖凹和馬朗凹侏羅系地層降特徵及降史進行了定量模擬。
  10. In this paper, according to the infection line method, the maximal values ( sefflement, shear and moment ) of the tunnel are calculated by using the theory of beams on elastic foundation

    本文根據彈性地基梁原理,採用各截面的影響線方法,按最不利情況加載,得到了最大的反應值(、剪力和彎矩) 。
  11. In view of the mechanical prediction for mining - caused subsidence, criteria for the optimization of the mechanical predicting model are given and the calculation and analysis of the movement value of mining subsidence have shown that the suggested method is feasible and the most reasonable

    針對開采的力學預問題,給出預的力學模型優化的判別準則,並進行了開采移動值的分析,表明本文所提出的方法是可行及最合理的。
  12. Analysis of space and layer face effects on mining subsidence numerical calculation

    開采數值的空間效應和層面效應分析
分享友人