沙壩頭 的英文怎麼說

中文拼音 [shātóu]
沙壩頭 英文
bar head
  • : 沙動詞[方言] (搖動以清除雜物) shake
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. This research will try to resolve the distribution and controlling factors of gas layers by the study of division of substrata in bawu gas field. the main reservoir of bawu gas field are the sand layers in the formation of k1sh, k1y, k1d, k2q, sediment delta plane, delta frontier, plait delta developing distributary riverway sand, bayou sand dam, far sand dam and river sand of plait

    八屋氣田主要儲層為早白堊世的河子組( k _ 1sh ) 、營城組( k _ 1y ) 、登婁庫組( k _ 1d )及晚白堊世的泉組( k _ 2q ) ,為三角洲平原、三角洲前緣及辮狀河三角洲沉積體系,發育分流河道砂、河口砂、遠砂、辮狀河道砂等,砂層在平面上連通性差。
  2. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運河起自廣東省東莞市橋縣,流經司馬、旗嶺、馬灘、塘廈、竹塘、嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘和八級抽水站。
  3. On the heavy silt - laden rivers, desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head, but also for the runoff river hydropower station with lower water head

    摘要在多河流上,無論是高大庫的高水電站,還是低水河床式樞紐,電站進水口的取水排歷來是一個倍受關注的問題。
  4. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水庫運用后水變化這一主要矛盾,通過分析研究以往典型時期的水特點和河道演變特點,收集分析河床邊界條件變化資料,小浪底水庫運用后水資料變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽水庫運用後下遊河道河勢變化的規律和特點,探索小浪底水庫運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東、東至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河道整治工程建設的規劃和工程安排提供決策參考和依據。
  5. In order to relatively hold up mud and sand on the spot and control deposition, we should control head channels, branch channels, main channels on slope surface comprehensively

    通過採用溝、支毛溝、干溝及坡面的綜合治理,實現相對就地攔截泥,從而達到控制庫淤積的目的。
  6. Silt will deposit there. velocities around groin head are larger than the scour velocity and scour hole may develop in this area. this would affect the stability of spur dikes

    受丁阻擋,田所在的邊灘區域流速很小,泥在此淤積:而附近流速較大,通常在此區域形成沖刷,影響丁的穩定性。
  7. From the tai mei tuk peninsula, a 1. 25 - mile long dam was to be built across the strait, to connect it with the small island of pak sha tou. this would change the shoreline and create a man - made lake measuring 3. 5 miles long, 1 mile wide and 2, 950 acres in surface area. the seawater would be pumped out before it could be used to store fresh water

    25哩的水,橫越海峽,連接大埔海岸對開半島白洲,改變原來的海岸線,使之成為一個長3哩半、闊1哩、面積達2 , 950英畝的海濱之湖,再將湖內海水抽乾,儲存淡水。
分享友人