  1. The project is 156 m dam height, 877 m normal impounded level and 760 mw installed capacity. minjiang river benches almost conversely in shajinba reach and makes the right bank a thin and weak ridge, which is a syncline geological structure

    金壩河段形成一個近180的河曲,使右岸形成三面被河曲抱的條形山脊,構造上為一完整金壩向斜,工程區水工建築物都布置在右岸山脊內。
  2. Regarding natural sand of the spot as model sand, using series model, and under the interaction of irregular wave and tidal current, a systematic test on scouring around pile of land - island approach bridge of jiangsu lng receiving station is carried out

    摘要以現場天然為試驗床質,利用系列模型,採用不規則波與潮流相結合的方式,對蘇lng接卸站陸連島橋樁基周的沖刷情況,進行了系統試驗。
  3. The trade pedestrian streets studied in this article are in the central city zone of chongqing, cluding yuzhong zone 、 shapingba zone 、 jiulongpo zone 、 jiangbei zone , esp. chongqing is mountamouse city. it has especial geography station

    本文所研究的商業步行街是指重慶主城區范以內,包括渝中區,坪壩區九龍坡區,南岸區,北區等。
  4. These measures were made following laboratory tests confirmed positive results for je in a batch of mosquitoes collected by fehd on november 1 at tseung kong wai which is 1. 5 km south of sha kong chuen where a five - year - old boy was confirmed to have contracted je on the same day

    一名居於村的五歲男童在十一月一日證實感染日本腦炎,同日,食環署在村以南一點五公里的祥降捕獲一批成蚊進行化驗,化驗結果證實該批成蚊帶有日本腦炎病毒。
  5. However, people studied the riverway mainly by field survey and landform map contrast before. because of the limits of man ' s field view and complexity of field survey route, it is a difficult bottle neck for people to make synthetical analysis on geological structure, yangtze river shoal, floodplain, terrace, and microcosmic suspended load on macroscopical scale

    而以往的河道研究大多數是通過地面調查和地形圖室內對比分析來研究的(少數運用航片) ,由於受人的視域范及調查工作路線的布置的復雜度影響,對區域宏觀尺度下的地質構造、長洲、漫灘、階地及河流微觀領域的懸浮物等作綜合性的研究便成為了瓶頸。
  6. Based on the analyses of the flow and sediment characteristics and evolution trend of the river bed of the fuling reach in the yangtze river before and after the impoundment of the three gorges reservoir, the water level, velocity variation and influenced range in the fuling reach before and fifty years after the operation of the three gorges reservoir with the construction of the fuling dock and four discharge combinations are calculated by using a two - dimensional flow mathematic model

    摘要在分析長涪陵段的水特性和三峽水庫蓄水前後該河段河床演變趨勢的基礎上,運用二維水流數學模型,分析了4種流量組合情況下在三峽水庫運用前和運用50年,涪陵港區碼頭修建前後的水位、流速變化及其影響范
  7. On the basis of a full investigation and study and an integrated analysis of the geological setting and rock - mass mechanical environment of the bank slopes of the hydroelectric project area on the mainstream of the jinsha river and by combining the qualitative analysis with the quantitative evaluation, the authors calculated the instability of the sliding masses according to 1 / 8 and 1 / 11 of the total cubic capacity of the materials falling into the river and the surge wave heights at the falling sites as well as at the xiangjiaba and xiluodu dam sites and in adjacent townships according to the calculation method of the surge wave diagram given by the american society of civil engineers, made the risk evaluation of the bank slope instability with respect to the operation safety at the dam, safety of the cities and townships around the reservoir and safety of the reservoir operation, and put forward precautionary measures for bank slope instability

    摘要筆者通過調查研究和綜合分析金幹流水電工程區岸坡地質背景和巖體力學環境條件,定性分析與定量評價相結合,採用與三峽工程庫區岸坡失穩危險性評價相類比的方法,針對崩滑體失穩按總體積的1 / 8和1 / 11入方量進行了計算和按美國土木工程學會涌浪圖解計演算法計算了入水點及在向家壩壩址、溪洛渡壩址和鄰近城鎮的涌浪高度,並繞大壩施工安全、庫區周邊城鎮安全,水庫運營安全等方面對岸坡失穩的危險性進行了評價預測,提出了岸坡失穩的防治對策。
  8. The repair and maintenance of the dredger deep bay and mai po receive large amounts of sediments from the pearl river estuary. some of this sediment settles onto the mudflats, but a lot is brought into our

    位於珠河口的米埔,每年大量的泥從珠流入后海灣及米埔,部份沉積在泥灘上,大部份則隨著基水閘操作流入基,在水道沉積,令水道變淺。
  9. The water channel was dredged to remove sediment and restore the proper depth of water. deep bay and mai po receive large amounts of sediments from the pearl river estuary. some of this sediment settles onto the mudflats, but a lot is brought into our

    米埔位於珠河口,每年珠河為后海灣及米埔帶來大量的泥,部份沉積在泥灘上,大部份則隨著基水閘操作流入基,在水道沉積,令水道變淺。