河原站 的英文怎麼說

中文拼音 [yuánzhàn]
河原站 英文
yugawara station
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ形容詞1 (最初的; 原來的) primary; original; former 2 (沒有加工的) unprocessed; raw Ⅱ動詞(原...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. ( 3 ) according to compensation benefit formation cause and scientific, rational, impartial, equitable distribution principle, put forward distribution project of water supply and generation electricity compensation benefit in the main stream of the yellow river

    ( 3 )根據補償效益成因分析及科學、合理、公平、公正的分配則,提出黃幹流梯級水電補償效益中的供水和發電效益的初步分配方案。
  2. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺口水電工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。
  3. With zhengzhou railway station, the largest railway hub station in china, the largest passenger bus transport center in henan province, namely, zhengzhou bus passenger transport station, jingguang bus passenger transport station, ermalu bus passenger transport station and railway long distance bus passenger station, this district has unique transport facility, and hosts the largest telecommunication and post hub in the central plains, with a daily average over 2000, 000 floating population, forming increasing stream of people, stream of materials, and stream of information in the central city zone, containing enormous commercial opportunity

    區內有全國最大的鐵路樞紐鄭州火車南最大的汽車客運中心鄭州汽車客運總,京廣汽車客運總、二馬路汽車客運、火車長途汽車客運等,交通優勢得天獨厚;中地區最大的電信、郵政樞紐也位於本轄區,日平均20多萬流動人口,形成了中心地區不斷增大的人流、物流、信息流,蘊藏著巨大的商機。
  4. The upstream monitoring station, located near the village of tseng lan shue, was graded fair in 2005. interestingly, this stream gets better as it goes down. the watercourse falls steeply in mid - stream, creating strong aeration which aids the rivers self - cleansing abilities

    位於井欄樹村附近的上游監測jr3於2005年錄得普通水質,但道中下游水質則較佳,因是井欄樹溪中游地勢高,水瀉急,水中的含氧量增加,而道凈化能力亦相應提高。
  5. In order to direct the water to the forebav of the pump station from the original canal, a channel long 135 m is designed. it crosses through the terrain top with a depth of more than 50 m. soil of the channel slopes is a strongly - weathered silty and sandy mudstone with many well - developed reticular cracks and takes the structural surfaces almost same as the channel slopes

    東深供水工程金湖泵位於塘廈鎮東面,屬低山、殘丘地貌,地面高程22 60m ;泵前池進水渠橫切山脊,連接東深供水,設計開挖1條長135m的進水渠,坡高50多米,邊坡土質為強風化的粉砂質泥巖,網狀裂隙發育,結構面基本與坡面重合;坡體土質中含有較多的粘土礦物,具有遇水軟化的特性。
  6. Daoguanhe rerservoir is a typical hill type reservoir in wuhan, china. its area for fish culture is commonly 467ha. periphytic algae and periphytic protozoan including species, the content of chl. a and primary productivity et al, were studied from april 2000 to january 2001

    本文從2000年4月至2001年元月按每季度采樣一次,對道觀水庫按上游、中游、下游設置的三個采樣作了周叢藻類、周叢生動物的群落結構和漁產潛力的研究,結果表明: 1
  7. This paper introduces the fundamental conditions of one - level - station control sluice and states the reason of erosion and treatment of this sluice

    摘要文章介紹了馴馬山滁一級節制閘基本情況,分析了沖刷因並提出了施工處理的方法。
  8. This included firstly the construction of a new reception tank and a pumping station at muk wu to strengthen the raw water reception capability. secondly, additional water mains were laid to strengthen the transfer between river indus pumping station with plover cove reservoir

    17億元改善東江供水計劃,第一部份在木湖興建一個新蓄水池及抽水,加強輸入廣東省水設備,第二部份是由梧桐抽水至船灣淡水湖興建輸水管,增加梧桐抽水抽水量。
  9. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水,加高深圳水庫主壩1米,新建的工程則包括于新開口興建東江抽水,提高供水數量。
  10. ( 3 ) after the analysis of the actuality of water resources, the requirement to water resources of every department, the basic situation of every reservoir and hydroelectric station, the optimal dispatching schemes of water resources are purposed, the simulation - optimal model of operation of reservoir system are established and solved by using man - machine dialog arithmetic

    ( 3 )在分析葉爾羌流域水資源現狀、各部門需水資料、各水庫電基本情況等資料之後,提出了葉爾羌流域水資源合理調配的則,在此基礎上建立了葉爾羌流域水庫群調度模擬優化模型,並用人機對話演算法進行了求解。
  11. Five floating roof oil tanks with volume 2 104m3 are designed to be constructed at shuguang pump station possessed by liaohe oil field, which is located at liaohe delta alluvial plain. this engineering filed is featured with complicated topography. the oil tank foundation soil is horizontally - layered, including four layers : medium dense - dense clay, interbedding of find sand and clay, fine sand sandwiching clay and fine sand

    位於遼三角洲沖積平的遼油田曙光泵計劃增建5座2 10 ~ 4m ~ 3浮頂式儲油罐,場區地形復雜,油罐地基土層分佈均勻水平,從上之下主要由中密粉土層、粉細砂與粘土互層、粉細砂夾粘土層和細砂層等4層組成。
  12. Detailed diagnoses is made on a heavy - hard rain in the northeast qinghai - xizang plateau using ncep data of 1 x 1 with 6h intervals, more complete and integrated conventional observational data and the data set of automatic meteorological stations in plateau and new generation doppler radar data and satellite images and etc. the following conclusions can be drawn : 1. the distribution of heavy - hard rain, which is characteristics of valley topography in northeast qinghai - xizang plateau is obviously effected by topography. the distribution of yearly mean precipitation and the frequencies of heavy - hard rain in this area are descending from east to west

    本文首先利用ncep時間間隔為6小時的1 1的格點資料、更全面、更為完整的常規探測資料和高地區布設的自動氣象資料、新一代多卜勒天氣雷達資料、衛星雲圖資料等對高東北部地區大到暴雨的天氣、氣候特徵及大尺度環流背景進行分析,形成對高暴雨的整體認識,並為以後的數值模擬提供大尺度環流背景及依據,分析中發現: 1 、高東北部地區大到暴雨的分佈明顯受到地形影響,年降水量和大到暴雨次數自東向西呈階梯性遞減趨勢,分別在高東北部的外流谷地區和四川北部地區存在大值中心。
  13. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的設計製造經驗,擁有多項專利技術,生產的同步發電機永磁機技術工藝先進,製造精良,能滿足與各式水輪機配套的不同技術條件要求。目前公司已製造投產的發電機容量范圍為0 . 120mw ,具備生產單擊容量50mw的能力,發電機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高電壓達13 . 8kv ,公司製造的甘肅永昌東水電34500kw水輪發電機組,海拔為2868 . 5m ,成功解決了高防暈等難題。公司擁有電機試驗絕緣材料試驗室等先進的實驗室設施和測試手段,使產品從材料進產,到成品出產的各項電器性能測試均能滿足設計要求。
  14. For the purpose, yuan government took a series of effective measures to develop agriculture and pasture, industry and commerce, communications etc. in the northwest area and obtained new achievements : forming a new national pattern and multiple economy in the northeast area ; discovering the true source and dredging partial transport of yellow river, which was an important place in the history of yellow river ' s development ; improving unprecedentedly the conditions of local communications by establishing posts and strengthening to run them in the northwest area, which had a great effect on the communication of ming - qing dynasty down to today ; ningxia being named officially in yuan dynasty and ningxia plain becoming beautiful " lush southern - type fields north of the great wall " on the base of the development of yuan dynasty

    為此,採取一系列有效措施,對西北地區的農牧業、工商業、交通等進行比較全面的開發,取得了一些新成果。如西北地區民族新格局及多元經濟的形成;對黃的開發,發現了真正源,開通局部黃漕運,在黃開發史上佔有重要地位;通過在西北地區設立驛和加強對所立驛的管理,使當地交通狀況得到前所未有的改觀,對明清以降直至今天的交通都產生了很大影響;寧夏于元代正式定名,寧夏平變成美麗的「塞上江南」 ,在元代奠定了基礎。
  15. The essential cause inducing weather and unloading is distict difference between epigenetic - surface and deep condition. firstly, the dissertation introduces the background conditions that are the base of damsite granite rockmass weathring and unloading ; secondly, the mechanism of the rockmass weathering and unloading is probed into ; thirdly, different degree weathered zones and load - off zones are compartmentalized. tastly, right rockmass which meet the dambase demand is choosed. above - mentioned is the dissertation " s technical course which is clearly from base research to application research.

    本文以黃拉西瓦水電壩基花崗巖體為研究對象,從風化、卸荷發生的根本因?巖體在地表與深部存在巨大環境差異為契入點,制定了從背景條件?機理研究?風化、卸荷分帶?壩基可利用巖體選取這樣一條從基礎研究到應用研究的較為明晰的技術路線。
  16. On space, from fengman bank in the south and the tributary of second songhua river - wende river valley, to city in the north, total nitrogen in the groundwater is increasing gradually ; and in the east and west, the dividing line is second songhua river which breakthroughs the city, to its east, taking the mangniu river valley with the centre zone, total nitrogen in the groundwater decreasing from the east to the west ; to its west, it decreases gradually from jiuzhan industrial area to gudianzi irrigation area

    在空間上,南部由豐滿大壩及二松支流溫德谷地向北部市區方向,地下水中總氮濃度逐漸升高;東西以貫穿整個城區的第二松花江為分界線,東部以?牛支流的谷平區為中心地帶,地下水中總氮濃度由東向西逐漸降低;西部以九工業區方向向孤店子井灌區所在地,總氮濃度逐漸降低。
  17. The rat only snorted and thrust his hands deep into his pockets, remaining where he was

    鼠只哼了哼鼻子,把手深深插進褲兜,地不動。
分享友人