河床加固 的英文怎麼說

中文拼音 [chuángjiā]
河床加固 英文
bed stabilization
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : i 名1 (供人睡覺的傢具) bed; couch 2 (像床的器具、地面) something shaped like a bed Ⅱ量詞(用...
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • 河床 : riverbed; bed; poised river; [英方] waterstead; cauce
  1. In the suspended sediment transport model, the method of shear stress is adopted to determine the source function in the suspended sediment diffusion equation. through a series numerical experiments and statistical analyses of observed field data, a local coefficient, which can reflect the bottom material and consolidation, is introduced into the classic critical erosion velocity of the sediment

    懸沙輸運模型利用切應力方法來確定對流擴散方程中的泥沙源函數,其中的臨界起動速度利用經典的泥沙起動流速公式前面增一個局地系數得到,這個系數能反映底質結構及結程度,通過系列數值試驗和實測資料的統計分析確定。
  2. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:高拱壩泄洪消能的特點是壩高落差大,流量大,功率大,位於谷狹窄地區,泄洪消能與防沖問題突出.經科學研究,採用「分散泄洪,削弱水流沖擊力,,增強道抗沖能力」的綜合治理措施,較好地解決泄洪消能布置問題.提出了表孔大差動坎分流齒、雙層多孔、水流撞擊、下設水墊塘聯合消能的典型布置方案,經實踐證明,方案可靠,消能效果好
分享友人