河流控制 的英文怎麼說

中文拼音 [liúkòngzhì]
河流控制 英文
control of streams
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • 河流 : rivers; stream
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. The depositional environment of the upper paleozoic in the ordos evoluted from the epicontinental sea to the fluvial - delta. the change of the depositional environment and eustacy controlled the main depositional systems in the research area

    上古生界沉積環境演化過程總的是由陸表淺海逐漸變為陸相的?三角洲,海平面升降和海水進退了區內主要的沉積體系和沉積相類型。
  2. As a result, vulnerable ecological environment is showed with the ecological bearing capacity in middle reaches of hetian river. in the view of the features of landscape pattern in the middle reaches of hetian river, the landscape protection principles of development, harmonization and reality and ecological landscape construction principle including adapting nature, mutualism, adjusting ecosystem and meliorating function, local regulation and whole " harmonization are put forward

    A ,指出區域內生態環境質量在提高,但依舊無法脫離荒漠生態體系,是一種極其脆弱的生態環境。針對和田中游地區景觀生態的具體特點,提出了發展、協調、現實的景觀保護原則以及適應自然、共生互利、調整結構,改善功能、局部與整體協調的景觀生態建設原則,相應地定出廊道建設、綠色植被建設以及綠洲建設的景觀生態建設途徑
  3. According to analysis of sedimentology, we think the most benefit environment to reservoir is under - water branch and river mouth bars microfacies, which often form thick sand bodies of high porosity of permeability

    從沉積相分析認為,有利於儲層發育的沉積環境是水下分道和口砂壩微相,水下分了砂體的走向及分佈區。
  4. During recent decade and more, major and super floods have taken place frequently in the yangtse river and huai river. the natural phenomenon of flooding is inevitable. it is not a surefire plan only to take engineering measures for flood control while climatic variation is far from being known

    近十多年來在我國長江、淮域連續不斷發生的大洪水或特大洪水再次向我們展示了這樣一個道理,洪水是一種自然現象,當環球大的氣候因素及其變化規律遠未被認識時,試圖僅依靠工程措施來洪水並非萬全之策,逐步運用非工程措施,常常能起到「以柔克剛」 、 「以弱勝強」之功效。
  5. By means of kiba formation, k. ibt " and kibt2 segments analysis on the equivalent time stratigraphic framework, subtle traps will be predicted on stratigraphic traps and lithological traps. the results from the research indicated that : ( 1 ) this paper further indicates the control significance of southern boundary fault displacement component, which downthrown side forms syncline or anticline, and points out that 4 anticlines in south are adjustment zone and are the entering lake position of ancient river

    本論文的主要認識和結論如下: ( 1 )進一步認識南緣邊界斷層位移量對下降盤形成次凹或橫向突起的意義,認出南緣的4個突起是調節帶之所在,也是古入湖處。這種格局導致凹陷強烈分割,並以橫向搬運為主。
  6. By analyzing on nature, society and economy conditions as well as distribution characteristics of sand source in the lower lhasa river valley, put forward a series of comprehensive renovation scheme to harness sand sources, mainly including dredging channel, planting farmland shelter - forest network, constructing arbor - bush - herb shelter forest and shifting sand stabilization, this scheme will not only control blown - sand threat, and improve local ecological environment ; at the same time, also lay the strong foundation for enlarging lhasa city space and effectively utilizing local resource, embody a sustainable thought on how to make comprehensive renovation in high cold valley region

    摘要在深入分析本區自然社會經濟條件和風沙源分佈特徵基礎上,提出把拉薩下遊道疏浚與風沙源治理相結合,以道疏浚、農田防護林、喬灌草防風護沙林和沙固定等物理工程、生物和機械措施為主體,進行風沙源綜合整治,一方面可有效風沙災害的威脅,改善谷區生態環境,同時為拉薩市城市空間發展和當地資源的有效利用奠定了基礎,體現了在高寒谷區進行風沙源綜合整治的可持續性思路。
  7. According to the abundance well logging, mud logging and core analysis data, gaotaizi reservoir has been classified into four sand group with the principle of cycle comparison and classified control. based on the detailed study of lithologic character, sedimentary structure, paleontologic fossils, depositional sequence, rock association and logging data, the microfacies of the studied area are divided into such seven types : subaqueous distributary channel microfacies ; river mouth bar microfacies ; subaqueous interdistributary channel microfacies ; subaqueous crevasse channel microfacies ; subaqueous natural barrier microfacies ; distal bar microfacies ; delta front sheet sand microfacies. the characteristic of each sedimentary microfacies are described detailedly

    通過研究大量測井、錄井資料和巖芯資料,依據「旋迴對比,分級」的原則,把研究區高臺子油層劃分為g 、 g 、 g 、 g四個砂層組。通過對研究區巖性、沉積構造、古生物、沉積序列、巖石組合及測井曲線特徵進行研究的基礎上,認為研究區高臺子油層屬於三角洲前緣亞相沉積,並將研究區沉積微相劃分為:水下分道、口壩、水下分道間、水下決口扇、水下天然堤、遠砂壩、席狀砂等七種微相類型。
  8. Northeast faults control the spread of the anhui riverway, and eastwest faults resulted in the widening of the river and the occurrence of nodes, then the stream raised and the riverway turn into goose pattern braided river. northwest faults and northsouth faults influence the evolvement of partial riverway, for example, the northwest lujiang - zhongming fault influence the evolvement of tongning shoals, and the northsouth faults passing through zongyang - digang make the riverway ' s direction from north - east to north - south

    北東向斷裂構造了皖江型的展布;東西向斷裂構造影響道的拓寬,形成磯頭,磯頭挑進一步使道形成穩定的鵝頭型;北西、南北向斷裂影響局部道的發育演變,如北西向廬江-鐘鳴斷裂影響銅陵沙洲的發育演變,南北向斷裂影響樅陽、銅陵、獲港道使其延伸方向由北東轉向南北向。
  9. In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered

    在海域大清北支及中下遊道洪水數值模擬的實際工作中,應用了一維網模型進行洪水的模擬計算,並根據實際情況加入了蓄滯洪區調度、泄洪閘調度以及近年來北方道入滲的特點等條件,計算效果良好。
  10. The biological environmental changes and social control by the folk in the fen river basins during ming and qing dynasties

    明清時期汾域生態環境演變與民間
  11. Controlled by summersville dam, the gauley is filled when the sum - mersville reservoir is lowered for storing winter melt and spring rains providing about 20 days of whitewater rafting

    受夏日蓄水池水壩,當蓄水池為了儲存融雪和春雨而放水時,高利裡水量滿載,提供了20天左右的白水漂
  12. Guan tao group oil layers are the major exploited formations of chengdao oil field, its reservoir sand is fluvial deposition, and the reservoir is controlled by structure and lithology. making it clear that petroleum geologic characteristics and sand - distribution of upper guantao group is the key factor for the successful exploitation of upper guantao group

    館上段是埕島油田的主要開發層系,為一套相沉積地層,油藏受巖性和構造雙重因素,因此搞清館上段沉積地質特徵、儲集砂巖的空間分佈規律是成功開發館上段油藏的關鍵。
  13. 26 rivers are controlled by dams

    壩把河流控制住了。
  14. Stream and river control works may have a serious local influence on accelerating channel erosion.

    河流控制工程對加速道沖刷有嚴重影響。
  15. Article 55 any violator of the provisions of article 19 of this law who fails to follow the planned realigning and leading line to realign river courses and build up construct ion projects for leading the river direction or protecting embankments shall, if the flood control work is affected, be ordered to stop the illegal act, restore to the original state or take other remedies and may be concurrently fined not less than rmb 10, 000 yuan and not more than rmb 100, 000 yuan

    第五十五條違反本法第十九條規定,未按照規劃治導線整治道和修建引導向、保護堤岸等工程,影響防洪的,責令停止違法行為,恢復原狀或者採取其他補救措施,可以處一萬元以上十萬元以下的罰款。
  16. In case where violation of requirements in the consent document for planning affects flood control but remedies can be taken, the violator shall be ordered to take remedies within a time limit and may be concurrently fined not less than rmb 10, 000 yuan and not more than rmb 100, 000 yuan

    第五十五條違反本法第十九條規定,未按照規劃治導線整治道和修建引導向、保護堤岸等工程,影響防洪的,責令停止違法行為,恢復原狀或者採取其他補救措施,可以處一萬元以上十萬元以下的罰款。
  17. As the river flow is increasingly controlled, the silt load will be less important.

    隨著對日趨完善,則泥沙荷載就不那麼重要了。
  18. It is necessary to know the conditions of river water quality in time in order to control and prevent the water pollutions in rivers

    摘要及時準確地了解水質狀況能更好地對水體污染進行和治理。
  19. Based on the research project of my tutor the application of a new unified power flow controller in extra high voltage transmission lines operated in two phases, the existing principle of upfc and methods of the transmission lines operated in two phases, put the new upfc into hai - jin - jia 330kv extra high voltage transmission lines based on perfecting the framework of main net located in west of river in gansu which can improve the quality of electric power and ensure power transmission or transfer between the main net of gansu and the area of west of river

    本文綜合分析了海-金-嘉330kv超高壓輸電線路在正常運行和故障情況下的諸多問題,在upfc的現有成果和非全相運行現有方案的基礎上,結合導師的研究課題? ?新型統一潮器在超高壓輸電線路非全相運行中的應用。提出在完善甘肅西主網架結構的基礎上,將新型的upfc應用於海-金-嘉330kv超高壓輸電線路,可以較好的解決電壓質量問題,確保甘肅主網與西地區電網的功率傳輸、轉換。
  20. Analysis of the abutment seepage on wanjiazhai multipurpose project

    龍口水利樞紐壩基承壓水問題分析與滲
分享友人