河流靜水段 的英文怎麼說

中文拼音 [liújìngshuǐduàn]
河流靜水段 英文
quiet reach
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : Ⅰ形容詞1. (安定不動; 平靜) still; calm; motionless 2. (沒有聲響; 清靜) silent; quiet Ⅱ名詞(姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • 河流 : rivers; stream
  1. It was a monstrous big river down there - sometimes a mile and a half wide ; we run nights, and laid up and hid daytimes ; soon as night was most gone we stopped navigating and tied up - nearly always in the dead water under a towhead ; and then cut young cottonwoods and willows, and hid the raft with them

    一到下游那邊,只見一條大得嚇人的大有的地方面有一英里半開闊。我們在夜晚行駛白天,便躲起來。夜快盡了,我們便停止航行,把筏子靠岸總是靠在一處沙洲的地,然後砍下白楊和柳樹的嫩枝,把木筏子給遮蓋起來。
  2. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地利樞紐工程,由於該工程床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲和液化成為壩體安全主要問題,本文對該壩的三種設計方案即平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的態應力位移及壩體在竣工期、蓄期等各個階可能產生的破壞進行了認真研究。
分享友人