河道流量測量 的英文怎麼說
中文拼音 [hédàoliúliángcèliáng]
河道流量測量
英文
stream flow gaging- 河 : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 流 : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 測 : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
- 河道 : river course; streamway; covalency; runway; cut; river channel河道變遷 channel change; migration ...
- 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
- 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
-
Hydrometric determinations - cableway systems for stream gauging
水文測定.河流測量用索道系統In consideration of the crises of both the industrial water and the domestic water in the estuarial areas of the yangtze river caused by the decrease of the channel runoff and the intrusion of the sea water during the dry season in dry year, the concept, method and planning framework of the water resources allocation for the areas mentioned above along the main stem of the river are put forward herein based on the preliminary prediction of the future water demands by taking the water resources allocation therein during the dry seasons as the actual case in combination with the status quo of the water environment and water resources utilization concerned
摘要針對枯水年枯水季,因河道徑流量較少,鹽水入侵的頻率和強度顯著提高而引起的長江河口沿岸地區生產生活用水安全,文中結合長江口地區水資源利用和水環境現狀,以大通以下長江幹流地區在枯水季水量分配為實例,在初步預測未來河口地區水資源需求的基礎上,提出長江口地區水資源配置的思路、方法及方案框架。The result is that this gas pool has simple structure, only forms a little nose - like structure at the district of fenghuangshan ; this pool belongs to delta front sub - facies sedimentary model, the underwater distributary channel and mouth bar is the better sedimentary microfacies ; the physical property of the reservoir is poor, the type of pore of the reservoir rock mostly are intergranular pore, intergranular solution hole and little are intercrystalline micropore ; the influential factors of pore structure and physical property are lithofacies, lithologic character and diagenesis ; the off - take potentia of all the testing well are deadly shortness, the wells have the worth of industrial recovery only under the condition of going through sand fracturing, and in the early of binging into production, the oil and sheath pressure drop rapidly, the production of the well drop rapidly
研究認為該氣藏構造簡單,只在鳳凰山形成了一個小型的鼻狀構造;屬於三角洲前緣亞相沉積模式,水下分流河道和河口壩是有利的沉積微相;儲層物性差,儲層巖石的孔隙類型主要有粒間孔、粒間(內)溶孔及少量晶間微孔;影響蓬萊鎮組氣藏儲層孔隙結構及儲集性的因素有巖相、巖性條件及成巖作用;所有測試井自然產能都極低,必須經加砂壓裂后才有工業開采價值,且投產初期,油套壓下降較快,氣井產量下降迅速。By using the three - dimension acoustic doppler velocimeter to measure velocities of flow in an ecological river before and after arrangement of cropping loops, the velocity distribution, turbulence intensity and reynolds stress before and after arrangement of cropping loops are compared
摘要採用三維超聲波多普勒測速儀對河道生態修復中種植圈布設前後的工況量測,比較了布設種植圈前後的流速分佈、紊動強度和雷諾應力的變化。According to the abundance well logging, mud logging and core analysis data, gaotaizi reservoir has been classified into four sand group with the principle of cycle comparison and classified control. based on the detailed study of lithologic character, sedimentary structure, paleontologic fossils, depositional sequence, rock association and logging data, the microfacies of the studied area are divided into such seven types : subaqueous distributary channel microfacies ; river mouth bar microfacies ; subaqueous interdistributary channel microfacies ; subaqueous crevasse channel microfacies ; subaqueous natural barrier microfacies ; distal bar microfacies ; delta front sheet sand microfacies. the characteristic of each sedimentary microfacies are described detailedly
通過研究大量測井、錄井資料和巖芯資料,依據「旋迴對比,分級控制」的原則,把研究區高臺子油層劃分為g 、 g 、 g 、 g四個砂層組。通過對研究區巖性、沉積構造、古生物、沉積序列、巖石組合及測井曲線特徵進行研究的基礎上,認為研究區高臺子油層屬於三角洲前緣亞相沉積,並將研究區沉積微相劃分為:水下分流河道、河口壩、水下分流河道間、水下決口扇、水下天然堤、遠砂壩、席狀砂等七種微相類型。Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method
研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沙沉積分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。The equation for estimating land surface temperature of huaihe river basin has been set up by using the data of split window channels of trmm and gms - 5 satellite and the ground observation data of hubex
利用trmm衛星和gms - 5衛星的兩個紅外分裂窗通道的亮溫資料,結合淮河流域能量與水分試驗hubex加密觀測期間獲得的地面溫度的觀測資料,建立了反演淮河流域地面溫度的參數化方程。Hydrometric determinations - cableway systems for stream gauging iso 4375 : 2000 ; german version en iso 4375 : 2004
水文測驗.河流測量用索道系統In this paper, river water quality prediction is integrated with water pollution control measures. two parameters, water environmental capacity and pollution index are selected for pollution control measures. the objective is achieved after the development of simulation model using one - dimensional advection dispersion equation. the model algorithm and computer program is an improvement over the existing water quality models, since the model solution involves four point implicit upwind schemes for water quality prediction and pollution control measures at each grid point. model simulation results the assessment of water environmental capacity that yield the acceptable and realistic pollutants concentration in order to maintain water quality objectives. the pollution and overall pollution index of the river is suggested for integrating number of contaminants variables into one index. study provides the mathematical and scientific procedure for water quality management. the new approach is helpful for the water pollution control and to study the impacts of waste effluents on the river system for strategic planning purposes
本文將水質預測及水污染控制措施有機地結合,選取水環境容量和污染指數作為水污染控制的參數.這樣,一維對流-擴散水質方程的求解除就是實現本研究目的的關鍵.本研究採用的模型在現有的水質模型基礎上有所改進,因為其採用四點隱格式對水質進行預測,推求可接納污染物的環境容量值及為保證水質而限定的污染物濃度值,從而制定相應的水污染控制措施.為整體考慮各種污染物的情況,建議採用河流的污染指數進而推求綜合污染指數.總之,本研究為水質保護提供了科學的計算方法,該法對水污染控制及污水對河道水質的影響是實用有效的Abstract : in this paper, river water quality prediction is integrated with water pollution control measures. two parameters, water environmental capacity and pollution index are selected for pollution control measures. the objective is achieved after the development of simulation model using one - dimensional advection dispersion equation. the model algorithm and computer program is an improvement over the existing water quality models, since the model solution involves four point implicit upwind schemes for water quality prediction and pollution control measures at each grid point. model simulation results the assessment of water environmental capacity that yield the acceptable and realistic pollutants concentration in order to maintain water quality objectives. the pollution and overall pollution index of the river is suggested for integrating number of contaminants variables into one index. study provides the mathematical and scientific procedure for water quality management. the new approach is helpful for the water pollution control and to study the impacts of waste effluents on the river system for strategic planning purposes
文摘:本文將水質預測及水污染控制措施有機地結合,選取水環境容量和污染指數作為水污染控制的參數.這樣,一維對流-擴散水質方程的求解除就是實現本研究目的的關鍵.本研究採用的模型在現有的水質模型基礎上有所改進,因為其採用四點隱格式對水質進行預測,推求可接納污染物的環境容量值及為保證水質而限定的污染物濃度值,從而制定相應的水污染控制措施.為整體考慮各種污染物的情況,建議採用河流的污染指數進而推求綜合污染指數.總之,本研究為水質保護提供了科學的計算方法,該法對水污染控制及污水對河道水質的影響是實用有效的Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering
摘要針對洞庭湖區的洪水組成、水流泥沙演變、河道湖泊水系分佈特點以及河道湖泊疏浚工程布局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維水力學計算模型預測疏浚工程實施后的水位、流量、流速流場變化,為河道、航道港口整治、河道疏浚清淤等工程決策與實施提供了可靠理論依據。In order to solve the turaoff facing yellow river now, we need supervise the flux by the long - distance measurement
為了更好地解決黃河下遊河道斷流的問題,有必要對引黃涵閘過流量進行遠程監測。On the basis of the field data of water temperature, a new formula for estimating water temperature of river by using meteorological factors is put forward by using the method of least squares
摘要結合某流域水溫原型觀測資料,通過分析水溫與氣溫、太陽輻射、濕度和風速之間的相關關系,採用最小二乘法建立了水溫與氣溫、濕度和風速三者之間的多變量函數方程式,提出了一種利用氣象因子估算天然河道水溫的新公式。To strengthen basins, non - point source pollution control, put the control into practice, build monitoring system online for pollution source, construct pollution treatment project, carry out research on oxygenation and direct - cleaning in lake or river, set up three gorges reservoir water pollution control laws and region regulations, deal with properly the ex - development between resource exploitation and environment prevention, and walk on the sustainable development road are important measures
針對已發生和潛在的水環境污染問題,提出了加強流域非點源污染的管理、實施總量控制、建立污染源在線監測系統、立項建設污染治理工程、開展河湖水域接觸氧化直接凈化技術的科研和實踐、制定《三峽庫區水污染防治法》地方法規、正確處理資源開發與環境保護協調發展的關系、走可持續發展道路等多項防治對策與建議。In addition to, we summed the results of fields outcrop and fluvial engineering, established the geological thesaurus. ration the different type of fluvial channels shape parameters. then matched the logging interpretation model of shaliness. porosity unit, permeate ratio and hydrocarbon saturation originality, because using the measure of multianalysis and network. the precision is higher than the result of onventionality, so laid the fundation of knowing the characterof reservoir
此外,總結了國內外野外露頭及河流工程的研究成果,建立了研究區的地質知識庫,初步量化了不同類型河道的形態參數。還建立了不同類型河道的泥質含量、孔隙度、滲透率、原始含油飽和度的測井解釋模型,由於引入了多元擬合及人工智慧神經網路等手段,其計算精度高於常規解釋結果,為精細分析儲層內部性質奠定了基礎。Optimization model of networks " roughness is established. in this model, objective function is the average scedasticity of relative error for water level and discharge. with the recorded water level and tidal data, the value of roughness is optimized
建立了以流量和水位相對均方差作為目標函數的河網糙率優化模型,並利用實測的河道水位及潮流資料,對河道的糙率取值進行了優化,所建立的糙率優化模型更加合理,計算的效率及精度大大提高了。分享友人