河道清淤 的英文怎麼說

中文拼音 [dàoqīng]
河道清淤 英文
channel cleanout
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ形容詞1 (純凈) unmixed; clear 2 (寂靜) quiet 3 (清楚) distinct; clarified 4 (一點不留) w...
  • : Ⅰ動詞1 (淤積) become silted up 2 (血液不流通) (of blood) stagnateⅡ名詞(淤積的泥沙) silt Ⅲ...
  • 河道 : river course; streamway; covalency; runway; cut; river channel河道變遷 channel change; migration ...
  • 清淤 : declogging
  1. Based on 2m contour of surveyed bathymetry from 1976 to 1999 and mean - high - tidal line distracted from remote sensing images acquired by landsat - 5 tm from 1976 to 2000 respectively, quantitative analysis about alluvion and erosion as well as the relationship between accretion of modern yellow river delta and the water and sediment discharge of yellow river is made, and the results indicate the mean - high - tidal level is more effective than 2m contour of the bathymetry. it is found that the accretion of modem yellow river delta is becoming less and less, what ' s more, erosion is even more than alluvion in some recent years. diaokou promontory has been eroded seriously since yellow river changed its course in1976

    以一般高潮線反映現代黃三角洲沖演變時,從1976年黃水溝流路入海到2000年,整個黃洞三角洲凈造陸201 . 5km ~ 2 ,積有逐漸變慢的趨勢,甚至出現凈蝕退的年份;刁口嘴大量蝕退,蝕退速率開始快速,后來逐漸變慢;水溝嘴大量積,積速率開始迅速,后來逐漸變慢,甚至出現凈蝕退;水溝嘴南側到支脈溝一段岸線與刁口嘴以西到灣灣溝一段岸線基本穩定。
  2. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對洞庭湖區的洪水組成、水流泥沙演變、湖泊水系分佈特點以及湖泊疏浚工程布局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維水力學計算模型預測疏浚工程實施后的水位、流量、流速流場變化,為、航港口整治、疏浚等工程決策與實施提供了可靠理論依據。
  3. Moreover, the drainage services department has also been conducting ad hoc maintenance dredging in some rivers or nullahs to address the odour problem

    另外,為改善環境,渠務署亦會不時及進行除以改善臭味等問題。
  4. In the canal with sand moving balance and stable bed, may keep the current status ; for the sediment canal which seriously reduced discharge, may properly clean sediment ; for the seriously scoured canal, such as curved canal, should lining the canal

    對于輸沙達到平衡、床比較穩定又達到輸水能力的渠段,可保持現狀;對積比較嚴重又影響輸水能力的局部渠,可進行適當疏浚;對淘刷比較嚴重的彎凹岸進行工程護砌。
  5. It proposes that under the drying climate background, the lakes disappeared mainly because that : firstly clay and sand silted up by the yellow river flooding ; secondly human activities generated great effects

    認為在氣候變乾的大背景下,湖泊消失的原因主要有兩個:一是黃泛濫所造成的小流域的泥沙積;二是疏浚、圍湖造田、過渡利用水資源等人類活動的影響。
  6. There have been great changes of boundary conditions in the lower yellow river in recent years owing to the influence of water and sediment development and human activities

    小浪底水庫投入運用后,黃下游在較長時期內受下泄水影響,演變及排洪能力將會發生較大的變化。
  7. River dredging - important measures for flood control of liaohe river mainstream

    河道清淤疏浚是解決遼幹流防洪的重要工程措施