河道站 的英文怎麼說
中文拼音 [hédàozhàn]
河道站
英文
river station- 河 : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 站 : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
- 河道 : river course; streamway; covalency; runway; cut; river channel河道變遷 channel change; migration ...
-
By using the yearly data of water - sand that is gotten by a couple of adjacent hydrologic station in yellow river lower reaches, this paper makes use of kinds of math methods looking for the nonlinear disturbance among all of the factors, and introduces the thinking of analysis, logic, conclusion, inference, and random to nonlinear hydrologic forecasting. it realizes the valid approximation of the water level process in erodible - bed channel
本文選擇黃河下游兩對相鄰水文站多年水沙資料,藉助多種數學方法尋找其中的非線性擾動項,將隨機數學中分析、邏輯、歸納、演繹、隨機的思考問題方式引入到非線性水文預報中,實現沖淤河道相應水位過程的有效擬合。Out on the spacious embankment behind the savoy the strikers were already gathered in their contingents, with a fringe of onlookers.
在薩伏衣飯店後面的廣闊的河岸大道上,罷工工人已經成群結隊地站在那裡了,旁邊站了些看熱鬧的人。On the toei subway oedo line, a convenient route is via fukagawa shiryokan - dori. 15 - minute walk from the no. 3 exit of kiba sta
都營地鐵大江戶線清澄白河站a3出口步行13分鐘經由深川資料館大道便捷。Based on the characteristics of the daily regulation wave of hydropower stations, the water surface lines in the rising and falling stages are calculated by using an one - dimensional steady flow model and an unsteady flow sediment model
摘要根據水電站日調節波的特性,運用一維恆定流和非恆定流泥沙數學模型,分別計算了河道漲落水過程的水面線。The upstream monitoring station, located near the village of tseng lan shue, was graded fair in 2005. interestingly, this stream gets better as it goes down. the watercourse falls steeply in mid - stream, creating strong aeration which aids the rivers self - cleansing abilities
位於井欄樹村附近的上游監測站jr3於2005年錄得普通水質,但河道中下游水質則較佳,原因是井欄樹溪中游地勢高,水瀉急,水中的含氧量增加,而河道凈化能力亦相應提高。Despite having spent hk 1, 700 million on this shenzhen river regulation project, the shenzhen government still thinks the river is too polluted and that the next course of action is to spend a further rmb 950 million to build a pumping station at sha tau kok and a 13 km long pipe to bring water from mirs bay to flush the shenzhen river
雖然這項深圳河調整工程耗資港幣17億,但深圳特區政府認為河道污染情況仍然嚴重,因此計劃進行次階段工程:耗資9 . 5億人民幣在沙頭角與建一座抽水站和13公里長的管道,把大鵬灣海水引進深圳河。The formula of calculating flood peak at downstream stations according to upstream flood peak at hydrometer station was proposed in this research. in the formula river boundary and flood type factors etc. were main factors and the formula can reflect the impacting factors of flood deformation
報告給出了由上游水文站洪峰流量計算下游站洪峰流量的計算公式,公式包含有河道條件和洪峰峰型因子,較全面地反映了影響洪水變形的因素。Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed
文摘:涪江潼南河段防洪整治是一項以防洪為主體的綜合性河岸整治工程,在平面二維數值模擬計算的基礎上再進行河工模型試驗,比較分析各防洪整治方案下潼南河段水流條件的變化,及其對上游防洪、河道、大橋、電站、航運、河勢的影響,提出合理可行的工程方案In addition, for its application in unattended substation, important traffic crosses, hydrological observation and the monitor of frontiers and coastal fronts and so on, remote video monitoring system plays a key role in motoring system
另外,一些特殊的應用如無人值守變電站、交通管理、河道水文監測、邊海防監控等,遠程視頻監控是監控系統不可缺少的最主要的功能。The width of main channel would influence the water level rising rate greatly in flood events. when the discharges in main channel increased to 8000 m ' / s from 3000 m3 / s the water rising amplitude at hydrometer stations in the lower yellow river was correlative well with the exponent ( - 0. 65 ) of main channel width and the exponent ( - 0. 33 ) of river longitudinal slope
洪水期主槽寬度對水位漲率有較大影響,主槽流量從3000m ~ 3 s增大到8000m ~ 3 s時,下游各水文站斷面水位的抬升幅度與主槽寬度的( - 0 . 65 )次方和河道縱比降的( - 0 . 33 )次方具有較好的相關關系。Considering the joint operation of the three gorges and gezhouba hydropower stations, influences of the daily regulation planning of the hydropower stations on the water surface slope of the downstream reach of the three gorges reservoir are studied
?結合三峽和葛洲壩兩電站聯合運行的實際情況,研究了調節方案對三峽水庫下遊河道水面比降的影響。Via tsuen wan market street, tai ho road, sha tsui road, yuen tun circuit, tai ho road, sai lau kok road, wai tsuen road, tsuen kam interchange, cheung pei shan road, shing mun tunnels, shing mun tunnel road, tai po road, tai wai road, mei tin road, che kung miu road, tai wai station public transport interchange, mei tin road, roundabout, mei tin road,
大河道沙咀道圓墩圍大河道西樓角路惠荃路荃錦交匯處象鼻山路城門隧道城門隧道公路大埔公路大圍道美田路車公廟路大圍站公共運輸交匯處美田路迴旋處美田路Abstract : there are differents ways to maintain normal navigation in navigable channel during channel enclosure for building hydropower plant
文摘:如何使通航河道在水電站截流至船閘正式通航期間維持正常的航運,其做法不一。The san fat stop will be elevated to link directly with the station concourse. pedestrian access will be provided between the station and ho tin stop
新發站將會重建為高架車站,與西鐵相連,另外屯門站會有行人通道與河田站連接。Based on analyzing discharge data in guide, xunhua, tongren hydrologic station and river course character, propagation time of different discharge in different river course is presented, and prediction period of interval flood, main stream flood during construction and operation period are acquired
通過對貴德、循化、同仁水文站流量資料以及河道特性的分析研究,得出不同流量在不同河道上的傳播時間,歸納出區間洪水和幹流洪水在施工期和運行期的預見期。Water quality index data for the last 10 years show that river water quality has sustained a territory - wide improvement, with fewer than 20 % of stations recording " bad " or " very bad " water quality in 1998
過去十年,水質指數資料顯示,香港大部河道水質已持續改善。在一九九八年,只有少於百分之二十的水質資料收集站錄得"惡劣"或"非常惡劣"的水質。A few other watercourses have had their monitoring interrupted at various points in their history. the kt1 monitoring station on the kam tin river was suspended temporarily in 1997 and 1998 while river training work was being carried out in the vicinity, resuming in 1999 once the station again became accessible. the tsang kok stream in the northwest was also affected by the west new territories landfill development, being suspended in 1999 but resuming from 2000
此外,有些時期河溪的監測活動亦曾經中斷過,例如1997年及1998年間,設于錦田河的kt1站位的監測因為附近進行河道改善工程而暫時停止,直至1999年才恢復運作新界西北部的曾角溪亦於1999年受新界西堆填區發展工程影響,水質監測暫停至2000年才重新恢復運作。This information tracks the levels of dissolved oxygen and e. coli at the stations, and is especially useful for those who need to know about water quality at a particular time of year, as for example those taking part in dragonboat races on the shing mun river in sha tin. this information is available at
環保署的網址除登載電子年報外,並載有全港12個主要河溪監測站的每月水質數據,其中包括水中溶解氧含量及大腸桿菌水平,社會上一些人士例如參加沙田城門河舟競渡的健兒需要了解最新河道的水質情況可瀏覽網址。After the flood discharges in 1995, parts of downstream channel is silted up in taiping wai powerstation. it raises the water lever, and decreases the work of generating unit
由於太平灣電廠尾水河道在遭遇大洪水後部分河床淤積,壅高了電站的尾水位,影響機組出力。The construction team also had to widen the section of the river along the station by about 17 metres to compensate for the impacts to water flow caused by the 352 large piles installed in the river to support the station
此外,工程人員同時須沿車站將河道擴闊約十七米,以抵消打入河床支撐車站的三百五十二支大型樁柱對河道流量的影響。分享友人