沿道路行進 的英文怎麼說

中文拼音 [yándàohángjìn]
沿道路行進 英文
movement on roads
  • 沿 : 沿名詞(水邊) water's edge; bank
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : 進構詞成分。
  • 道路 : road; way; path
  • 行進 : process; march forward; advance
  1. At first, on the basis of analyzing the structure of the freeway monitoring system, the paper puts forward systematic network structure ; secondly, it has analysed the composition and function of the montoring software. because this section of road conditions of freeway is very complicated, and there are a lot of tunnels along the freeway, in addition, the weather of some freeway sections is fogy. the system is divided into three subsystems in the function : the freeway section controlling, the fogy district controlling and the tunnel controlling ; thirdly, the main software of the freeway monitoring system is analysed and designed in the dissertation ; at last, the structure of procedure and user ' s interface are given, and the monitoring software of the freeway is implemented

    本文先從高速公監控系統的體系結構入手,提出了系統的網結構;其次,分析了監控軟體的組成和功能。由於該段高速公況復雜,沿線有多個隧,部分段還為霧區天氣。所以該系統從功能上劃分為三個子系統:段監控、霧區監控和隧監控;然後,對高速公監控系統的部分軟體的分析和設計;最後,實現了高速公監控系統的部分軟體,給出了主要的程序結構和用戶界面。
  2. Far from doing anything of the sort, he used his power to select out of all the various courses open to him the stupidest and most pernicious of all. of all the different things napoleon might have donespending the winter in moscow, going to petersburg, going to nizhni - novgorod, going back a little more to the north or to the south, by the road kutuzov afterwards tookno course one can imagine could have been more ruinous for his army as the sequel proved than the one napoleon actually did adopt ; that is, the course of staying in moscow till october, letting the troops plunder the town, then in hesitation leaving a garrison behind, marching out of moscow, going to meet kutuzov and not giving battle, turning to the right and going as far as maley yaroslavets, again refusing to risk a battle, and finally retreating, not by the road kutuzov had taken, but by mozhaisk and the smolensk route through devastated country

    可供拿破崙選擇的有:在莫科斯過冬,向彼得堡軍,向下諾夫哥羅德軍,向北或者向南庫圖佐夫后來所走的那條撤退,可是,再也想不出比拿破崙做的更愚蠢更有害的事了,那就是,在莫斯科停留到十月底,任由部隊搶劫這個城市,后來,又動搖不定是否留下守備隊,就退出了莫斯科,接近了庫圖佐夫,卻不戰斗,接著轉向右方,走近小雅羅斯拉維茨,又失掉了試突破的機會,不走庫圖佐夫走的那條大,而沿著被破壞了的斯摩棱斯克大向莫扎伊斯克退卻,結果證明,再也想不出比這更愚蠢對軍隊更有害的事情了。
  3. On his way to the sweet shop, he dropped his sixpence and it rolled along the pavement and then disappeared down a drain.

    他在去糖果店的上,把錢掉到地上了,硬幣沿著人滾動,掉陰溝里去了。
  4. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網等方法,對鷓鴣山隧潛在的主要地質災害(塌方、涌水、巖爆和大變形)了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算應力場反演,基本查明了沿軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  5. On the survey of the problems of historic towns and the research of related theories and practice in both inland and overseas , through the analysis of the study and practice of zouma protection and development , the thesi s aims to find out the idea and the ways of protection and development for historic towns in china there are three parts in the thesis the first part of the thesis is the research of the history, the worthiness and existing problems of zouma after briefly introducing the history of zouma , the author analyzes the vicissitude of zouma from three points of view of economy, society and culture the author then comprehensively expatiates the worthiness of towns and architecture , the history and culture and economy of zouma in the third section , combining with the existing problems of zouma confronting with the urbanization process , the author presents the imminency for zouma protection and development the second part of the thesis is the theory research and the strategy research the author analyzes the theories and methods of both inland and overseas , and summarizes their commonness and existing insufficiency, which provides reference for the practical protection work of zouma ; on the base of the above , the author discusses the strategic value of

    本論文基於對當前國內外古鎮保護相關理論與實踐的研究思考以及當今城鎮建設中傳統古鎮所面臨的困境和問題,結合重慶走馬古鎮保護與發展研究課題的實踐工作和成果,以歷史古鎮保護為核心,從物質形態、社會和經濟三個方面對適合於走馬古鎮保護與發展的有關理論和工作方法了研究總結,力圖探求出一條適合於走馬古鎮保護與發展的,以期對當今國內的歷史城鎮保護工作提供參考。論文共分三部分:第一部分為走馬的歷史沿革與變遷、歷史價值及現狀問題研究。首先對走馬鎮的歷史沿革加以簡述,並從經濟地位、社會形態和文化意識三個方面詳盡分析了走馬鎮的歷史發展變遷,探討了走馬鎮的歷史價值及現狀問題形成的歷史根源。
  6. Jog : the carriage jogged along the rough road

    馬車沿著崎嶇不平的顛簸著緩緩
  7. Leaving the hotel in the morning and heading towards independence rock devil s gate, the bus will arrive via the national grass land and pass through the mormon pioneer oregon trail, then back to salt lake city

    早晨沿80號公西,奔馳于紅漠高原,此凄為當年楊伯瀚率領摩門信徒千辛萬苦,流血流汗,入猶他州的交通要極具歷史意義。
  8. Because of deposit the ground form, wide soft soil and large thickness, we should use the methods to set up the standard design., such as to change and fill out a stone, lump block of stone of the strong rammer and split off the thick liquid of note and so on

    摘要深圳市港灣大沿線屬前海灣沿岸海漫灘沉積地貌,軟土層分佈范圍廣、厚度大、性狀極差,闡述該採用的換填塊石、劈裂注漿、插板排水堆載預壓、強夯塊石墩等地基處理方法,了標準設計。
  9. Cross the intersection from hachiko exit of jr or subway, walk straight on dogenzaka. take right at dogenzakaue kobanmae

    在jr和各地鐵以及私營鐵澀谷站下車,沿玄坂向圓山町方面
  10. This paper has three layers : the first, summarize investment and finance system of our country, mainly state the basic theory of this system, review the evolution, reform and development of our country ' s investment and finance system ; the second, during the process of reviewing the evolution, reform and development of investment and finance system of power industry, summarize and abstract the main matter of investment and finance system of power industry ; the third, aim - at the main matter of the system, give the thought and countermeasure on improvement and perfection of the system based on the simply analysis the reasons, from the macroscopic & microcosmic aspects

    本文結構共分為三個層次:一是我國投融資體制概述,主要陳述投融資基本理論,回顧我國投融資體制的沿革及發展;二是在詳細回顧電力業投融資體制沿革的過程中,總結和提煉電力業投融資體制存在的主要問題。三是針對當前電力業投融資體制存在的問題,在簡要分析其原因的基礎上,從宏觀和微觀兩個方面,提出了改和完善的思和對策,即宏觀上深化電力體制改革、深化電價改革、調整投資結構,微觀上健全項目風險約束機制、廣開企業融資渠和重視企業的資本運營。
  11. Carrying heavy loads, they toiled along the road

    他們身背重負,沿艱難
  12. Royal dragon hotel, yunnan is the modernized commerce hotel which constructs according to four star classes standards investment, invites the hong kong peaceful park hotel management group to carry on the management, is situated at kunming town center branch and gold and greens lu heyan the waterway in common boundary, hands over with the famous historical scenic spot, golden horse blue chicken work place echoes, is the kunming politics, the economical, the cultural center and the lively commercial land sector, is apart from the airport only to need 15 minutes, the transportation extremely facilitates

    雲南威飯店是按四星級標準投資興建的現代化商務酒店,聘請香港泰得國際飯店管理集團管理,地處昆明市中心主幹金碧沿的交界處上,與著名的歷史景點金馬碧雞坊交相呼應,是昆明政治經濟文化的中心和繁華的商業地段,距機場僅需15分鐘,交通十分便利。
  13. According the overal plan of nanbei lake scenic spot, the goverment will first expand the green planting work along the nanbei lake road, the path sanwan to qingchaoding. as the landscape design and construction will be open potential investirs and the goverment prefer bt form

    根據景區總體規劃及景觀建設需要,分輕重緩急,擬先期對南北湖大、三灣至鷹巢頂沿線兩側地形改造及景觀綠化,其中涉及景觀建設有投資方建設,政府按合同約定價格及方式予以回購。
  14. Exit onto i - 55 stevenson expressway and follow the signs to lake shore drive north. exit at grand avenue illinois street. turn right at the end of the ramp and follow illinois as it turns into the circular drive for navy pier

    上到i - 55史蒂文森,隨標志前達到北湖岸車,在主大街或伊利諾街駛出,彎結束后右轉,沿伊利諾街前入海軍碼頭環
  15. Afterwards, the teachings remained hidden for 1, 000 years until an indian yogi - scholar went in search of shambhala and was initiated into the teachings by a holy man he met along the way

    然後,教導保持隱蔽狀態1000年直到一位印度瑜珈修者-研究者入尋找香巴拉而且靠他沿遇到的一位聖人發起入教導。
  16. The railway tunnels along canton road and underneath the former marine police headquarters will be constructed by the bored tunnelling method to minimize impacts on the adjacent environment. other than the excavation works that need to be carried out within the works site near the canton road government offices for the new station and introducing the tunnel boring machine, the works that need to be carried out at the street level along canton road will be small in scale so as to minimize the impact on the environment in the neighbourhood

    在廣東沿和前水警總部地底的鐵,會以鉆挖隧方式建造,除了在廣東政府合署現址附近的工地內挖開地面以便興建新車站及引鉆挖機外,需要在廣東的工程規模會很少,以便盡量減少對毗鄰環境的影響。
  17. Widening and realignment of a 3. 6 km section of tung chung road between lung tseng tau and pak kung au from a single - lane road for two - way traffic to a single two - lane road for two - way traffic with a footpath having a minimum width of 1. 6 m, and construction of a 2. 6 km long single two - lane road between pak kung au and cheung sha, including elevated highway structures of a total length of 750 m, with a footpath of a minimum width of 1. 6 m ; provision of 21 passing bays bus - bays along the road and a roundabout at cheung sha ; and

    在井頭至伯公坳一段長3 . 6公里的東涌擴闊工程,把這段單線雙程改為雙線不分隔,以供雙程車,並為這段重新定線,另沿設置最少闊1 . 6米的,和在伯公坳與長沙之間築建一條長2 . 6公里的雙線不分隔,包括總長度為750米的高架構築物,另沿設置最少闊1 . 6米的
  18. The slip road leads you to a junction with an ordinary road or to another dual carriageway

    駕駛人沿著連接駛,可到達一般口,或入另一條分隔車
  19. The five carriages were rolling through a flat country along an interminable straight road bordered by fine trees

    五輛馬車駛在平原上,沿著一條筆直的望不到頭的
  20. Section of tung chung road between lung tseng tau and pak kung au from a single - lane road for two - way traffic to a single two - lane road for two - way traffic with a footpath having a minimum width of 1. 6 m ; construction of a

    長的東涌擴闊工程,由單線雙程改為雙線不分隔沿辟設最少1 . 6米闊的,並為這段重新定線
分享友人