泄水面積 的英文怎麼說
中文拼音 [xièshuǐmiànjī]
泄水面積
英文
drainage area- 泄 : Ⅰ動詞1 (液體、氣體排出) let out; discharge; release 2 (泄露) let out (a secret); leak (new...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 面 : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
- 積 : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
- 面積 : [數學] area
-
An active measure for ground subsidence control is to move the exploited horizon upward to shallow area and make it close to the recharge and discharge area of groundwater
控制地面沉降的一個積極措施是將開采層位上移至淺層,使其接近地下水的補給區和排泄區。It is found that the degree of mineralization and metamorphic coefficient and conversion potential of formation water, the fault is zone of sluicing of atmospheric infiltration water flowing from basin west margin to east ( centripetal flow ) and sedimentary compaction water flowing from qija gulong depression to west ( centrifugal flow )
通過地層水礦化度和變質系數等參數的分佈規律及一系列折算水位剖面圖的分析發現,該斷裂對水是不封閉的,並且是盆地西緣大氣滲入水向東流動(向心流)及齊家古龍坳陷沉積壓實水向西流動(離心流)的共同泄水帶。( 5 ) by analyzing the terrace in the lacustrine sediment of the ancient barrier lake, diexi, minjiang river, forming of the terrace is not only because of the intermittent arising of the tectonic movement, but also because of descend of the eroding normal covering resulting from destroying of the barrier lake
( 5 )通過對岷江疊溪古堰塞湖湖相沉積中的河流階地分析可知,階地的形成不僅僅是由於新構造運動的間歇性抬升作用,由於堰塞湖的潰決引起洪水下泄,導致河流侵蝕基準面的下降也可以形成階地。In the rotor design, it makes a detailed calculation for all the geometry feature parameters including geometry dimensions, contact line length, blowhole area and flow cross - section area and the thermodynamic feature parameters such as cooling capacity, shaft power and so on
在轉子設計方面,對全部幾何特性參數,包括幾何尺寸、接觸線長度、泄漏三角形面積和面積利用系數等以及包括製冷量、軸功率等冷水機組熱力特性參數進行了詳細計算。The premises of the simulation are that the runoff from upreach is 7. 8 108m3 / a and the means of economization on water is in effect. when studied it was thought firstly the water for the lake area and the living plant of the oasis, then for forest - sod irrigation and farmland irrigation
模擬計算是以上游下泄水量7 . 8 10 ~ 8m ~ 3 a為前提條件,在實行節水措施,完善供水系統的情況下,首先滿足維持和恢復一定規模湖泊面積,保證綠洲植被正常生長所需水量,然後考慮林草灌溉用水和農田灌溉用水量。The influence of the area contraction ratio of rotary flow generator on the hydraulic characteristics of level rotary flow has been investigated by the hydraulic model test of an internal energy dissipation tunnel
摘要通過模型試驗,研究了起旋器出口面積收縮率對水平旋流泄洪洞水力特性的影響。分享友人