泥波 的英文怎麼說
中文拼音 [níbō]
泥波
英文
mud wave-
Based on the study of sediment transport under the actions of tidal currents and wind waves, a mathematical model of suspended load and bed load for yangtze estuary is developed
摘要通過對長江口徑流、潮流和波浪共同作用下的泥沙運動規律的研究,開發並建立了長江口全沙(懸沙和底沙)數學模型。The muddy water has a choppy and irregular surface.
泥水表面波浪滔滔且不規則。The pipe is complete enwrapped by cement after grouting, not loose and rupture when pulling wire
外壁環狀波紋,灌漿后可完全包裹在水泥中,拉線時不會松動或斷裂現象。Lenehan and one from alba longa, one crotthers, and young stephen that had mien of a frere that was at head of the board and costello that men clepen punch costello all long of a mastery of him erewhile gested and of all them, reserved young stephen, he was the most drunken that demanded still of more mead and beside the meek sir leopold
斯蒂芬面龐酷似修士,坐于上座,另有不久前因表現出豪飲之勇而獲得「潘趣23科斯特洛」之雅號的科斯特洛座中除了青年斯蒂芬而外,彼乃最爛醉如泥者,越醉越討蜂蜜酒喝,再有即是謙和的利奧波德爵士。Studies on the electromagnetic wave transmission performance of concrete combined with znow crystal fibril
與硅酸鹽水泥復合材料的電磁波透射特性研究Ningbo hengsheng stationery co., ltd was set up in 1998. located in the beautiful port city - ningbo, the east of china, specializing in stationery toy and office accessories such as glue crayon oil pastel clay water color solid semi finger paint binder clip tape dispenser 3d glue and so on
位於中國的東方具有中國文具之鄉之稱的美麗的寧波港,恆生文具有限公司專業生產和銷售蠟筆油畫棒橡皮泥水彩固體半固體手指畫票夾膠帶座膠水等文具玩具和辦公用品。Of the various portland cements, the following varieties are now generally available from the makers in industrialized countries.
在各種波特蘭水泥中,工業化國家的生產廠目前一般供應下列品種。Aiming at some occurrent interfering problems during acoustic variable density logging in oil region, for example, some short horizontal linear interference has appeared in the acoustic variable density logging drawing, and combining with the logging principles of cement bond composed logging tools, this paper has analyzed the factors of forming interferences during acoustic variable density logging and the influences for well cementing evaluation, and suggested some methods to judge and solve every interference
摘要針對油區聲波變密度測井中出現的干擾問題,例如在聲波變密度測井成果圖上有短橫線干擾,結合水泥膠結組合儀測井原理,分析了聲波變密度測井中形成干擾的因素及其對固井評價的影響,提出對各種干擾的判斷和解決方法。These are the main portland cements, but variations of them are mentioned in the article on concrete additives.
這些就是主要的波特蘭水泥,在「混凝土外加劑」課文中還提到了其他品種的波特蘭水泥。Asbestos - cement corrugated sheet and ridge tile
石棉水泥波瓦及其脊瓦Mud ridge ripple mark
泥脊波痕In this paper, the numerical harbor should include following contents : 1. database of wave field, tidal current field, sediment field in researched area ; 2. database of ship styles. 3. numerical model used to analysis data. 4. plans of outer dike, utilities of sea line, and selections of waterway, which based on the above databases
本文認為,對于港區而言,數值化的內容應包括以下幾個方面: ( l )所研究港區的波浪場、潮流場及泥沙場等自然條件數據庫的建立; ( 2 )船型數據庫的建立; ( 3 )數值分析模式的建立; ( 4 )提出建立在自然條件基礎之上的外堤布置、碼頭岸線利用策略及航道的擬定方案(即優化模式的建立) ; ( 5 )按照經濟最優原理快速準確地提出碼頭裝卸的策略及當前方案。Via lee garden road, foo ming street, percival street, leighton road, wong nai chung road and broadwood road. to
經利園山道、富明街、波斯富街、禮頓道、黃泥涌道及樂活道。Cementitious corrugated panel
水泥波紋板They lived in a mud - brick house with a corrugated metal roof, chickens running freely outside
他們住在屋頂是波狀鐵皮的泥磚屋裡,屋外雞只到處亂跑。Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method
研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沙沉積分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。Asbestos - cement corrugated sheet and ridge
石棉水泥波瓦及其脊瓦Standard specification for corrugated asbestos - cement sheets
石棉水泥波紋板標準規范Asbestos cement corrugated sheeting
石棉水泥波紋板Asbestos - cement corrugated fill for use in cooling towers
冷卻塔用石棉水泥波狀填料分享友人