泥漿鉆孔樁 的英文怎麼說

中文拼音 [jiāngzhēnkǒngzhuāng]
泥漿鉆孔樁 英文
slurry-drilled pile
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • 漿 : 漿同「糨」
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • 泥漿 : slurry; mud
  1. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋壓灌混凝土成技術自研製以來,已在多項復合地基工程中進行了應用,較好地解決了軟弱地層成困難的問題,適應地質條件范圍廣,成速度較快,工期短、工效高;與復合地基成時的漿護壁成工藝、振沖工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優點;另外,壓入桿內的混凝土為泵送免振混凝土,因此體質量易於保證;與漿護壁和干作業成工藝相比,螺旋壓灌混凝土成的側阻和端阻都有相應的提高,的承載性能較好,復合地基的變形較小。
  2. Today, cast - in - situ piles are more widely used in deep foundation engineering because of their many advantages, such as better adaptability to various ground condition, providing enormous bearing capacity by a single pile and smaller dosage of reinforcing steel bar. but, their own disadvantages, such as sediment under tip, clay slurry around pile, friction and tip resistance disagreement and initial ground stress freeing, limited their bearing capacity, lowered the utilization ratio of material and increased the settlement

    灌注,因其對地層適應性強、能提供較大的單承載力、鋼筋用量少等優點,在目前深基礎工程中得到了極為廣泛的應用。但是,灌注的固有缺陷,諸如底虛土;漿;端阻、側阻發揮不同步;后原地應力釋放等,限制了其承載力的發揮,使得材料利用率不高,沉降較大。
  3. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心、預制預應力混凝土空心的成工藝、填石壓漿混凝土的配合比設計原理及影響強度指標的主要因素;根據漿水力學原理,導得了考慮各種因素的水漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心基礎的質量檢測方法及標準;並在此基礎上,深入分析了側、端承載能力,提出了填石壓漿混凝土空心的設計計算理論和方法。最後,論證了空心新工藝的可行性、適應性、經濟性,為大力推廣應用空心新技術提供了可靠的技術資料。
  4. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組巖層中提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根身內埋設量測元件試的單豎向靜載荷試驗資料,分析了各試驗特別是常規沖灌注嵌巖在昔格達巖中的軸向力、側摩阻和端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖承載力的計算公式的基礎上,探討了在昔格達巖層中的沖灌注嵌巖的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用型以及指導施工提供了依據。
  5. Based on the results of vertical static loading test and stress test for longhole bored pile in loess foundation, by analysing the transferring law of axial force and the action of lateral friction resistance and bottom resistance, the paper discusses the influences of two types of holing technology on bearing capacity behavior

    本文通過黃土地基中旋挖灌注長漿護壁灌注長靜載荷試驗和身應力的測試,分析了黃土地基中兩種成工藝灌注長身軸力的傳遞規律、側阻力及端阻力的發揮性狀,探討了兩種成工藝對灌注長承載力的影響。
  6. It is stated clearly by researching, the cast - in - place pile must be constructed according to strict technological process on condition that pebble geological structure, and more important that the drilling technology and the reasonable property index of mud are chose correctly on the basis of the condition of pebble geological structure

    研究表明,江漢平原地區卵石地基條件下,灌注必須要按嚴格的工藝流程施工,最重要的是根據卵石地基的地質情況,正確選擇工藝和合理的漿性能指標。
  7. Use of non - disperse low solid mud in bored pile drilling

    不分散低固相漿灌注工程中的應用
  8. Abstract : in some project, pebble is used in bearing stratum. for the resean of lower strengthand bad property of construction. the bearing capacity of pebble can ' t achieve the reauirement of up - structure. but the pebble soild has higher permeability coefficient and placeability. the method has remarkable economic results

    文摘:在以礫卵石層為持力層的基設計中,由於其可性差、易坍塌,強度相對較低,但是具有較大的隙率和滲透系數,可灌性較好,採用一定壓力對灌注底礫卵石持力層注入水漿液對其進行加固處理,可以較大地提高其承載力,並能取得較為明顯的經濟效益。
  9. The bored pile by churning drive and bored pile with slurry wall protection are widely adopted in loess foundation in recent years

    摘要旋挖灌注漿護壁灌注是近年來黃土地基中廣泛使用的基形式。