洪凝 的英文怎麼說
中文拼音 [hóngníng]
洪凝
英文
hongning-
The moment the bells stopped, those banked masses broke and poured over the line like a vast black wave, and for as much as a half-hour it continued to flow, and then it solidified itself.
鐘聲一停止,那群堆千積萬的人就四分五散,好象一片黑色的洪濤巨浪,沖到那個防線里來,繼續奔流了半個鐘頭之久,這才又凝固起來。The studies may indicate that an earthfill dam with a center concrete gravity overflow spillway section is the most economical, in a wide flat valley.
方案表明,在寬闊而平坦的河谷內,一種在中間段設置混凝土重試溢洪道的土壩是最經濟的。The concrete abatise groups frame as an advanced technique is used in flood protection, river regulation and bank protection works
混凝土榪槎群框架結構是防洪、治河、護岸工程中出現的一項新技術,針對其水流特性的基礎性研究還很不足。Based on the background of a city key construction project 棗 hongshan bridge, the loading characteristics of the deck system consisting of mutirow cantilever in composite structure of steel and concrete is studied in the thesis
本文以長沙市洪山大橋為工程背景,對組成橋面板系的多排懸臂鋼-混凝土組合梁的受力特點進行了研究和探討。For floors where abrasion and impact resistance as well as dust - proof are required such as for shed, loading area at port, machinery industry, aitcraft parking apron, garage, parking area, oil storage piant, pathway floor, mine chute, bridge surface, reservior overflow relief channel, energu consumption. loading slope, military industry, weaving mills, cold storage plant, automobile industry, electronic industry express highway, etc
倉庫、碼頭裝卸區、機械工廠、飛機停機坪、車庫、停車場、油料庫、通道地面、工礦溜槽、橋面、水庫溢洪道、交通池、裝卸斜坡、軍工企業、紡織業、冷凍庫房、汽車工業、電子工業、高速公路等適合金屬骨料要求的混凝土地面。Literally thousands of concrete dams are providing water supply shortage, irrigation, flood control, and power generation.
可以毫不誇張地說,有成千上萬座混凝土水壩正在供灌溉,給水、防洪、發電之用。It is verified by the observed data of xianing port area in changsha city that the model is of high accuracy, with the greatest relative error of the peak flow of only 7. 85 %, thus can be used in runoff simulation of harbor rainfall drainage system
經長沙市霞凝港區的實測資料檢驗,證明該模型在港區小流域的雨洪分析中有較高的精度,洪峰流量最大相對誤差僅為7 . 85 % ,可用於港區雨水排水的徑流模擬。The stress condition ; overall stability ; effect of filling gravels into the hole of the block of the precast concrete interlocking blocks in the water flow during the flood period as well as the resistance parameters of the blocks are studied through experimental simulation ; in which a comprehensive analysis is made on the mechanical stability and the anti - erosion properties of the blocks, and then the requirement and the safety degree of the gravel filling are given
摘要通過試驗模擬研究了預制混凝土連鎖塊在洪水期水流中的受力狀況、整體穩定性、孔內填充碎石的作用及連鎖塊阻力參數,綜合分析了連鎖塊結構的力學穩定性和抗沖性,給出了碎石填充的要求及安全度。Artists : enoch cheung, cheung yiu - wah, gary li, alex heung, james hui fung, lock, lo chi - kit, karen louie, kim. peacock, sit hung - por, tang ying - chi, tang ying - mui, tse ming - chong, wong tin - yan, francis yu wai - luen, kei kei yu
參展藝術家張康生、張耀華、李思捷、香建峰、許蜂、羅至傑、雷愛恆、曾劍華、薛洪波、鄧凝姿、鄧凝梅、謝明莊、王天仁、余偉聯、余琦琦" the jade body, like the congealed fat, accumulate inside with nothing left, the quality is thick and temperate and moist with zhengdong jade, the pulse is paid attention to hard and densly, sound is loud and clear "
清代陳勝玉記所載:和闐玉「玉體如凝脂,精光內蘊,質厚溫潤,脈理堅密,聲音洪亮」 。Application of silicon powder concrete for flood discharge middle outlet in the baojixia reservoir project
硅粉混凝土在寶雞峽水庫泄洪中孔的應用Bottom hole layout of flood discharing and sediment flushing and application of silicon powder concrete in baishi reservoir
白石水庫泄洪排沙底孔布置及硅粉混凝土應用The traditional construction technique and the technology are further improved in accordance with the study on the comparison between the ministerial standard ( sdj249 - 88 ) and the standard for the three gorges project ( tgps09 ) in light of the special requirement for both the quality examination and evaluation standards during the construction of the concrete of the surface outlets for flood discharge in the second construction phase of the project ; with which the quality of the construction is guaranteed to meet the quality standard of the three gorges project
摘要在三峽二期工程泄洪表孔混凝土工程施工中,通過對部頒標準( sdj249 - 85 )與三峽標準( tgps09 )的比較研究,針對三峽混凝土單元工程質量檢測與評定標準的特定要求,進一步改進傳統的施工技術和施工工藝,確保泄洪表孔混凝土工程施工質量符合一流的三峽工程質量標準。According to the instance of the arch dam built, take the discount quotiety, the verification flood water level, the frictional quotiety and, the agglomerate force and as stochastic variable quotiety, calculate the reliability index of the abutment with the calculational programme after the average value and variable quotiety is known
對于所取的拱壩實例,以揚壓力折減系數,校核洪水位,摩擦系數、 ,凝聚力、為隨機變量,在已知其均值並設定變異系數的前提下,利用電算程序計算其壩肩巖體的可靠指標。In china hydropower station, slrcp is firstly used in dongjiang. later, this type of penstock is used in jinshuitan, jinjiang, taolinkou, wuqiangxi, lijiaxia, jinghong, and also in the largest hydropower station : three - gorge hydropower station
此後,在緊水灘、錦江、桃林口、五強溪、李家峽、景洪水電站工程中陸續推廣使用,舉世矚目的三峽水電站採用的就是「淺槽式鋼襯鋼筋混凝土壩後背管」 。Through the studies on temperature control, we shorten the total length of axis of the floodgate of releasing floodwater by 5. 5 m, economize more than 10000 m3 concrete, convert more than 3 million yuan
可提前發電約5億kw ,摺合人民幣約1億元。 4 .通過溫控研究,縮短了泄洪閘軸線長度5 . 5m ,節約混凝土方量10000多方,摺合人民幣約300多萬元。Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china
簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例In the past decade, we built a total of some 31 kilometres of concrete channel bed in 16 major river training and flood prevention projects ( see annex 1 for details )
在過去十年,我們在16項主要河道治理及防洪工程中建造共約31公里混凝土河床,詳見于附表一。By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the post - cooling water, the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper
本文通過對原材料及配合比、混凝土出機口溫度控制、運輸過程溫度控制、澆築過程的溫度控制以及混凝土澆筑後的養護和冷卻通水等一系列研究,提出景洪電站高氣溫條件下大壩碾壓混凝土連續施工的綜合措施,並在計算和已有經驗的基礎上給出具體實施方法。By applying " none homogeneous multi - laminate element ", hong - kou rcc gravity dam ' s simulation computing of temperature field and stress field at construction period and operation period for all courses and many factors. e. some kinds of methods are discussed in detail for temperature field back analysis, and artificial neural network method for back analysis of thermal parameters of concrete is suggested
應用「非均質層合單元法」實現了洪口碾壓混凝土重力壩施工期、運行期全過程多因素的溫度場及徐變應力場的模擬計算,進行多方案的比較分析,推薦出優選溫控防裂方案,取得了非常滿意的成果。分享友人