洪布施 的英文怎麼說

中文拼音 [hóngshī]
洪布施 英文
humbsch
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  1. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了工導流建築物的等級、水工置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段水導流方案的合理性和經濟性,為工決策提供理論依據。
  2. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對洞庭湖區的水組成、水流泥沙演變、河道湖泊水系分佈特點以及河道湖泊疏浚工程局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維水力學計算模型預測疏浚工程實后的水位、流量、流速流場變化,為河道、航道港口整治、河道疏浚清淤等工程決策與實提供了可靠理論依據。
  3. When the water situation of any river or lake approaches the guaranteed water level or the safety flow capacity, or when the water level of any reservoir approaches the level of design flood, or when a great danger occurs to flood control works, the flood control headquarters under the relevant people ' s government at or above the county level may declare an emergency flood season

    當江河、湖泊的水情接近保證水位或者安全流量,水庫水位接近設計水位,或者防工程設發生重大險情時,有關縣級以上人民政府防汛指揮機構可以宣進入緊急防汛期。
  4. The results showed that : the integrated ecological risk was presented symmetrically along brahmaputra, and was mitigated from valley farming area to mountain pastoral area ; the hazards of main risk sources to risk suffer in each sub - region was differently, drought was the common risk source and imperils farming and stock raising severely ; aimed at enhancing the ability of fighting drought, controlling flood and stabilizing sand engineering measures should be taken steps to prevent those hazards ; mountain hazards must be controlled in resident area and along arterial traffic ; manual work should be done to void hail in those area where hails attacked heavily ; there is need to promulgated risk knowledge to herdsmen for strengthening their risk consciousness and improve the ability of preventing risk and self - help after hazards happened in the pasturing area

    扎囊縣綜合生態風險沿雅魯藏江呈現對稱型分佈,並由河谷農業區向高山牧業區逐漸降低;各亞區的主要風險源對風險受體的危害強度差異較大,乾旱是共同的風險源,造成的農牧業生產損失最為嚴重;抗風險措主要有在河谷地帶採取工程措以提高抗旱、防和固沙能力,在半山臺地加強治理居民點及交通沿線的山地災害,在多雹區進行人工消雹;在高寒牧區向牧民傳播風險知識,以加強其風險意識,提高規避風險和災后自救能力。
  5. Abstract : this paper summarizes a series of tests and inve stigations on general layout, const ruction diversion, flood disposal, navigation, river closure, form of gate opening s ection, pattern of energy dissipation and scouring under sluice carried out for f eilaixia proj ect by the scientific research institute of prwrc during the period from 1983 to 1998 and presents their major results

    文摘:綜合闡述了珠江水利委員會科學研究所從1983 ? 1998年間對飛來峽水利樞紐的整體置、工導流、泄、通航、截流、閘孔斷面形式、閘下消能形式、閘下沖刷等所進行的一系列試驗和研究工作,並介紹主要試驗研究成果。
  6. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:高拱壩泄消能的特點是壩高落差大,流量大,功率大,位於河谷狹窄地區,泄消能與防沖問題突出.經科學研究,採用「分散泄,削弱水流沖擊力,加固河床,增強河道抗沖能力」的綜合治理措,較好地解決泄消能置問題.提出了表孔大差動坎加分流齒、雙層多孔、水流撞擊、下設水墊塘聯合消能的典型置方案,經實踐證明,方案可靠,消能效果好
  7. Based on the river regime of tgp dam area and the arrangement of upper and lower access channels, the experimental research on the influence of such unsteady flow on the navigation, the evaluation of navigable conditions under the unsteady flow and the study of corresponding improvement measures are presented in this paper

    本文結合壩區河勢特點及上下游引航道置,試驗研究了大壩泄及船閘充泄水非恆定流對上、下引航道通航影響,同時進行了非恆定流通航條件評價及改善措研究。
  8. Adding to the country s devastation are the loss of homes and property : 1, 128 houses have been swept away by the flood waters while more than 2, 000 houses have collapsed ; 20, 687 hectares of crops have been ruined, 427 km of roads damaged, 67 bridges destroyed, and many schools, gas stations and utility stations, which serve the public needs have been rendered useless

    根據平順省水賑災中心1999年8月5日公的統計數字顯示:死亡及失蹤人數為28人, 1 , 128間房屋被沖走, 2 , 000間房屋毀損, 20 , 687公頃的農作物被毀, 427公里的公路遭損害以及67座橋梁倒塌,同時有許多學校加油站和公共設全毀。
  9. Hongjiadu hydraulic power plant is the only leading water storage reservoir of wujiang cascade hydraulic stations, which is a full - time storage reservoir. 2 * landslide body is distributed at the right side of downstream, which is just located in the region of energy dissipation. erosion gully may cut the bottom of the landslide body. there are roads on the top of the landslide body during the construction period and operating period

    家渡水電站是烏江梯級水電站中唯一具有多年調節性能的「龍頭」水庫, 2 #塌滑體分佈於壩址下游右岸,恰好位於泄消能防沖區內,沖坑將塌滑體下部切腳,而且工期和運行期在其上都置有公路,因此2 #塌滑體失穩將影響整個水電站的正常運行。
分享友人