流水方式 的英文怎麼說

中文拼音 [liúshuǐfāngshì]
流水方式 英文
pipelining scheme
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • 流水 : 1 (流動的水) running water; stream2 (舊時指商店的銷貨額) turnover (in business)流水搬運作用...
  • 方式 : way; fashion; pattern
  1. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護對地下場及圍巖穩定性的影響和所應採取的支護措施等面進行了探索、研究。
  2. In the search for site - dependent characters, the different design elements can be identified in the language and ideas of the office ' s landscape architecture : the poetic planning approach ; the reutilization of proven design principles ; the archaeological search for original features of a place ; the concept of the garden as a theme garden ; the concept of the " openly architectonic " ; the concept of " emptiness " ; and the " production line " concept

    在追尋場地特性的過程中,賴納?施密特教授及其事務所的規劃思想和設計語言可以歸納為:詩意的規劃法;已被證實的設計原則的再利用;對場所原有特徵的考古學研究的應用;將花園設計成一個主題花園的概念;直接利用建築結構組織空間的概念; 「空」的概念; 「線」的概念。
  3. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花電站在1995年及1996年導渡汛工程措施設計及工模型試驗,對混凝土面板堆石壩的導渡汛標準、導及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  4. The unexpected discovery of an object of great monetary value : precious stone, valuable adhesive or impressed postage stamps 7 - shilling, mauve, imperforate, hamburg, 1866 : 4 pence, rose, blue paper perforate, great britain, 1866 : 1 franc, stone, official, rouletted, diagonal surcharge, luxembourg, 1878 : antique dynastical ring, unique relic in unusual repositories or by unusual means : from the air dropped by an eagle in flight, by fire amid the carbonised remains of an incendiated edifice, in the sea amid flotsam, jetsam, lagan and derelict, on earth in the gizzard of a comestible fowl

    意外地發現一樣非常值錢的東西:寶石,貴重的帶膠郵票或蓋了戳的郵票七先令,淡紫色,無孔,漢堡,一八六六264四便士,玫瑰色,藍地上有孔,英國,一八五五265一法郎,黃褐色,官印製,刻有騎縫孔的,斜著蓋有加價印記,盧森堡,一八七八266 。古代王朝的戒指,稀世遺寶,在不同尋常的地或以不同尋常的出現:從天而降飛鷹丟下的,借著一場火在焚毀成焦炭的大廈灰燼當中,大海里在漂物失事船隻的丟棄物繫上浮標投下的貨物以及無主物當中,在地面上在食用禽的胗里。
  5. Only the muddy water at wrightwood flowed turbulently.

    在賴特伍德只有泥才以渦動。
  6. Two completely different schemes for cooling water flow are obtained by changing the diesel engine ' s water flow from the oil condenser to the water jacket of the cylinder block

    摘要通過改變柴油機從機油冷卻器入機體套的,得到兩種完全不同的冷卻案。
  7. There are many units in an urban drainage pumping station where the flow usually varies from season. the side - inlet sump is often designed to save the area of the pumping station

    城市排泵站常年運行的量變化一般很大,配泵機組臺數較多,為節省佔地面積,常採用布置較緊湊的側向進
  8. Through analyzing the figure of energy wasting of pump, the quality in pipes is direct proportion of the speed of pump if the speed of pump is reduced. the power of electromotor fell the cube of the speed of pump. so the energy wasting of constant pressure water supply based on variable frequency speed regulating technology is envident less than the traditional mode is used throttle to supply water

    分析泵工況的能耗比較圖,可以看出利用變頻調速實現恆壓供,當轉速降低時,量與轉速成正比,功率以轉速的三次下降,與傳統供中用閥門節相比,在一定程度上可以減少能量損耗,能夠明顯節能。
  9. It includes the establishment of the collaborative system, the research of the work mode of the group and the relevant technology that support group works, the development of the application system etc. by establish collaboration circumstance, ameliorate the manner by which people exchange their information, we can clear up the obstacle which generated because of the distance of the time and the space, and so we can save the time and energy of the workers, and improve the result and the efficiency

    它包括協同工作系統的建立、群體工作研究和支持群體工作的相關技術研究、應用系統的開發等部分。通過建立協同工作的環境,改善人們進行信息交,消除或減少人們在時間和空間上的相互分隔的障礙,從而節省工作人員的時間和精力,提高群體工作質量和效率。海洋石油開發生產調度是一項非常復雜的系統工程,需要綜合處理文氣象、地理環境、海上鉆井平臺現場設備監控等諸多面的信息。
  10. Soil nitrogen pool is the main body of terrestrial carbon pools, so it ' s change will possibly result in relatively great change of atmosphere n2o concentration, and, it ' s change will also affect global climate change. meanwhile, the nitrogen in the soil can also cause the water pollution through soil water infiltration and surface runoff

    作為陸地氮庫的主體,土壤氮庫的微小變化,可能導致大氣n _ 2o濃度發生較大的變化,以至影響全球氣候變化;同時土壤中的氮素也可以通過下滲和地表徑體,導致體污染。
  11. Through developing a 2 - dimensions heat transfer model of buried pipe - in - pipe heat exchanger and simulating the process by computer, the author figures out inter - relations of factors which influence characteristics of buried pipe - in - pipe heat exchanger, such as pipe diameter, pipe length, ratio of pipe diameters, flow rate, inlet water temperature, patterns of water inlet and outlet, and material features made of pipe, and proposes some optimizing indexes of buried pipe - in - pipe heat exchanger. the author studies the " heat - - short circuit " phenomenon as well and gives < wp = 5 > some important results

    本文通過建立地下套管埋管換熱器傳熱過程的二維傳熱模型,並藉助計算機對分析結果進行解析,弄清了影響埋管換熱器性能的管徑、管長、管徑比、通過量、進溫度、進出以及管材等參數的作用,並提出了相應的優化指標,對研究界懸而未決的「熱短路」問題也進行了細致分析,得出了有關結論。
  12. When the sprocket or pulley shaft installed in the effort, chain / conveyor belt transmission mode can be intermittently transmission pipeline - automated machinery

    當鏈輪或皮帶輪安裝在出力軸上時,鏈/皮帶傳動的輸送可間歇地傳動的自動化機器。
  13. In low developed non - karat mountain area, the main water supply patten is fetching water from a river, water - fetching building is built mostly on the bank or at the bottom of the river, it seemed to be fetching water from underground, but the quantity of the water depends on the runoff of the river, so it has close relationship with surfacewater actually

    摘要人類利用開發程度較低的非巖溶山區一般以近河取為主要供,取建築物多位於河岸或河底,從供上看屬于取用地下,但取量的大小依賴于河量,因此實質上和地表關系更加密切。
  14. Many registration experimental results can illustrate the performance of this method. we also study on the feature and deformations of remote sensing images. aiming at infinite length images with local distortions, we suggest a sequential stream - like registration method

    在研究遙感圖像特點和失配的基礎上,針對具有局部幾何畸變和無限長特點的遙感圖像,提出了一種持續地的配準法。
  15. On account of working characteristics of preceding separation such as many devices, long processing line and pipelining etc., auto - in - order control of msw processing line was realized with micro - programmable controller at human machine concurrent mode

    為實現垃圾前分選處理工廠化和盡可能的自動化,針對前分選的設備較多,工藝路線很長,的工作特點,以人機協同,採用可編程控制制器實現對整個生產線的自動按序控制。
  16. The system - controlled iir filter and fft were realized using fpga in this paper, and modified pipeline structure is adopted to greatly raise the running speed in the system - controlled iir filter. in the same time, it is used that the algorithm of n - point complex to compute 2n - point real data block in the radix - 2 fft. it is different to the normal method in the adoption of pipeline single dual ram for each stage

    論文用fpga實現了系統的受控iir濾波器和fft部分,受控濾波器採用改進的線結構,運行速度得到了大幅度的提高,同時運用n點復數dft演算法來計算2n點實數數據,在fpga中實現了基2的1024點復數fft ,同一般的實現不同,採用了的每級單個雙口ram的法,節省了ram的容量,經驗證,該設計符合濾波器系統的要求。
  17. ( 5 ) drinking water systems of high - rise buildings treatment techniques and treatment processes of drinking water are summarized. piping designs, water supplies, system calculations and selection of water pipe of drinking water systems are discussed. some suggestions on management of drinking water based on current situation of drinking water are put forward

    ( 5 )高層建築直飲系統對直飲的處理技術和處理工藝程進行總結,從直飲系統的管網布置、供、系統計算和供管材選擇等面對高層建築直飲系統進行總結和探討,根據目前國內直飲現狀提出了相應的管理建議。
  18. In regions where there is a brighter prospect for nonagricultural employment and where nonagricultural job opportunities are more abundant, fewer rural laborers land nonagricultural jobs outside their resident regions. the empirical analysis into the second aspect chiefly evaluates the contribution made by rural labor transfer to the gdp of both in agricultural sectors and nonagricultural sectors and farmers " income

    在目前的社會經濟背景下,農村勞動力採取跨省實現非農就業多數情況下是一種不得已的選擇,在那些非農產業發展較好、城市化平較高和市場化程度較高的省份,農村勞動力轉移規模較大,但跨省轉移比例和強度並不高。
  19. In sum, in the case of laminar flow, the outside helical flow would have a little influence on mf of purity water

    總之,在層條件下,對于純凈的微濾,外旋對微濾通量的影響並不顯著。
  20. The tdr measurements of ecw with high spatial and temporal resolution combine with porous ceramic cup solution samplers to follow no3 - n transport in soil is a new, valuable method for analyzing transport of nonconservative ions in soil

    土壤中人孔隙的存在可使硝態氮在灌后的很短時間內隨分以優勢到達下層土壤。
分享友人