混凝土包殼 的英文怎麼說

中文拼音 [húnníngbāo]
混凝土包殼 英文
concrete encasement
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Shaped steel / steel profile concrete beam. its characteristic is to enwrap a layer of concrete outside of the structural steel beam

    採用型鋼大樑,它的特徵是在鋼結構梁外面再裹一層
  2. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,括:一期石圍堰基礎處理與施工技術;大江截流上下游石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋引水管道研究;蝸打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  3. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,括:一期石圍堰基礎處理與施工技術;大江截流上下游石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋引水管道研究;蝸打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  4. Based on the characters of structure of the project, the structural style selection is given and analysis program of the latticed shell of double - layer hyperbolic pyramid cooling tower is programmed by the finite element theory and vb 6. 0 advanced programming language, which includes of 15 programs and directly aims at cooler tower and gives the forcing property by the computing program of the latticed shell of double - layer hyperbolic developed. analysis of static stress and temperature stress is given out by means of three dimens ions members finite element and numerical analysis, optimum design of member sections is given out by full stress, analysis of geometric nonlinear is given out by nonlinear finite element, analysis of earthquake stress is given out by the mode decomposition response - spectrum method, the latticed shell cooling tower compared with the reinforced concrete structure finally

    該軟體括15個程序,其針對性強,直接針對冷卻塔,對該結構進行了受力分析,具體分析括:採用空間桿件有限元和數值分析方法對結構進行了靜力分析與溫度應力分析;採用滿應力法對應用於冷卻塔的桿件截面進行了優化設計;採用非線性有限元分析方法,並利用荷載增量法對該結構進行幾何非線性分析;採用振型分解反應譜法對網的自震特性及地震反應作了一定的研究;並且將具體工程的研究結果與鋼筋結構冷卻塔進行對比。
分享友人