  1. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的溫度場和徐變應力場模擬模型理論,編制了高碾壓混凝土壩的三維有限元模擬計算程序,在程序中考慮了各種溫控措施的數值模擬,包括:水管冷卻、冬季保溫、降低的澆築溫度、夏季表面噴水霧、施工汛期頂面過水等。
  2. Application of colloid material in concrete fissure treatment

    膠性材料在混凝土壩裂縫處理中的應用
  3. In the dam foundation restraint area, mgo can be mixed into concrete to prevent dam longitudinal crack. research on autogenous volume change of rcc mixed with mgo, and research on thermal stress compensation of darn foundation prove that rcc mixed with mgo plays a role in dam crack control

    在材料措施方面,深入研究高碾壓混凝土壩基礎約束區採用外摻mgo措施,利用其微膨脹性能補償體降溫過程中產生的溫度應力,以防止大縱向裂縫的發生。
  4. Aiming at the deficiencies in the ctod criterion applied to analysis of critical crack propagation, a new fracture criterion is established

    針對ctod準則在混凝土壩裂縫失穩擴展分析中的不足,提出了一種裂縫失穩擴展新判據。
  5. On method for design of seepage control with impermeability amp; amp; drainage measures in rccds

    碾壓混凝土壩防滲與排水滲控設計方法
  6. According to their building material, dams are described as concrete, earth fill, rock fill, hydraulic fill and so on.

    按照築所用材料,可以把稱為混凝土壩、填、堆石,水力沖填等等。
  7. Specifications for maintenance and repair of concrete dam

    混凝土壩養護修理規程
  8. Guide for design of hydraulic reinforced concrete structures

    碾壓混凝土壩設計導則
  9. Damage to concrete dams and its simulation calculation

    混凝土壩的損傷及損傷模擬計算
  10. Technical specification for concrete dam safety monitoring

    混凝土壩安全監測技術規范
  11. Simulating calculation of thermal damage of concrete dams

    混凝土壩的溫度損傷及損傷模擬計算
  12. Study on thin - layer element and application in fem analysis of rccd dams

    探討碾壓混凝土壩薄層單元有限元分析法
  13. Practice in seepage prevention structures of roller - compacted concrete dams

    碾壓混凝土壩防滲結構型式的工程實踐
  14. 4. research on the crack control measures in the view of material

    ( 4 )本文從材料方面進行了碾壓混凝土壩防裂措施的研究。
  15. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能成套技術研究」 ; 4 .水利部「水工抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能技術、上海寶鋼礦石碼頭鋼筋防腐蝕技術、江陰長江大橋大體積粉煤灰技術、南京長江二橋泵送技術等提供咨詢建議。
  16. According to observations of some existing rcc dams at home and abroad, the rcc dam construction technologies are successful in general, but the problems of seepage still exist

    根據對國內外已建碾壓混凝土壩的運行觀測,總體來說碾壓技術是成功的,但普遍都存在著滲漏問題。
  17. The damming technique is relatively perfect now, but because of the problems in construction management are more and more severe, such as construction scheme and matching machine, which manifest the high construction expenses

    雖然碾壓技術已達到較成熟的地步,但是由於採用不同施工組織方案和機械配套方面存在的施工管理問題越來越突出,這集中反映了碾壓混凝土壩施工費用的巨大浪費。
  18. The scale and height of rolling - concrete are spread increasingly, such as the technique studied recently that the 300 meters high gravity dam and the 200 meters high arch dam, which requires more experience in the damming technique, construction crafts and mechanization

    目前,碾壓混凝土壩的規模和高度正在日益擴大, 300m級的碾壓重力和200m級的碾壓的研究正方興未艾,對碾壓技術、施工工藝和機械化程度的要求也更高。
  19. In order to ascertain stress behavior of steel lined reinforced concrete pipe accurately, according to the fundamental principle of non - linear computation of reinforced concrete elements, the steel lined reinforced concrete penstock on downstream dam surface in a hydropower station is calculated and analyzed, and the distribution of circumferential stress of the steel lined reinforced concrete pipe is obtained, it proves that it is safe and reasonable to use structures of steel lined reinforced concrete penstock in hydroelectric station construction, and can satisfy the requirement of project

    摘要為了能夠準確地把握鋼襯鋼筋管的受力性能,根據鋼筋單元非線性計算的基本原理,對某水電站鋼襯鋼筋混凝土壩後背管進行了計算分析,得出了鋼襯鋼筋管環向應力的分佈情況,分佈情況說明了此水電站採用鋼襯鋼筋混凝土壩後背管的結構形式是安全合理的,可以滿足工程要求。
  20. ( 4 ) the seepage prevention structures and drainage structure is very important for the safety and stabilization of rcc dams, so their effects is discussed in this paper to the seepage field ' s characteristics of rcc dams, moreover, the seepage control schemes of rcc dam is analyzed

    ( 4 )碾壓混凝土壩的防滲與排水結構對于大的安全與穩定極為重要,本文研究了各種防滲與排水技術對大滲流場特性的影響作用,並分析了各種防滲與排水方案的特點。