混凝土預制場 的英文怎麼說
中文拼音 [húnníngtǔyùzhìchǎng]
混凝土預制場
英文
manufacturing yard of concrete block- 混 : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
- 凝 : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
- 預 : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
- 制 : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
- 場 : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
- 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
-
Expanded polystyrene case - bay fillers for concrete floors with prefabricated binders and dividing floor
預制梁和現場澆注混凝土樓板斂縫用膨脹聚苯乙烯Present methods generally based on the statistics of earthquake damage, expert experiences, theory analysis and experimental researches have obvious advantages, disadvantages and certain scopes of application ; ( 2 ) different prediction methods should be adopted against different building conditions, sites, intensity and experiences etc to predict earthquake damage of buildings for prospective accuracy, dependability and availability ; ( 3 ) earthquake damage matrix, which is the foundation of earthquake damage prediction, of 7 kinds of building in the urban areas of zhangzhou city under intensity 6 to 9 has been set up. the damage conditions of different buildings under different intensity are as followings : all kinds of structures are basically intact under intensity 6 ; the reinforced concrete structures are basically intact under intensity 7, but other kinds of structures are destroyed slightly ; the reinforced concrete structures are still basically intact while other kinds of structures are destroyed intermediately under intensity 8 ; the reinforced concrete structures are destroyed slightly, single - story factories and open houses are destroyed intermediately and other kinds of structures are destroyed seriously under intensity 9 ; ( 4 ) the results of earthquake damage predicting of buildings embody the damage when earthquake happens in the future. thus, further identifications and reinforcements should be considered to buildings that will be destroyed intermediately or more under the earthquake with 10 % exceeding probability in future 50 years ; ( 5 ) the direct economic losses caused by damage of buildings resting with the area, structural type, intensity and damage of all kinds of buildings are the main part of the losses of the city in an earthquake ; ( 6 ) the direct economic losses increased progressively toward high intensity by 2 or 3 times
基於上述研究,得出的主要結論有:建築物震害預測是一個模糊的、系統的、復雜的問題,現有的方法很多一般都是以震害統計規律、專家經驗、理論分析和試驗研究為依據,有其自身的優缺點和一定的適用范圍;應針對不同的建築物條件、場地條件、地震強度和已有經驗等,採用不同的預測方法進行建築物震害預測,以使預測結果達到預期的精確性、可靠性和可操作性;建立了漳州市區7類建築物在6度9度地震作用下的震害矩陣,成為指導抗震防災的重要依據,各類結構的震害情況表現為: 6度地震作用下各類建築物基本完好; 7度地震作用下除鋼筋混凝土結構基本完好外其餘以建築輕微破壞為主; 8度地震作用下鋼筋混凝土結構仍以基本完好為主而其餘建築以中等破壞為主; 9度地震作用下鋼筋混凝土結構以輕微破壞為主,單層工業廠房和空曠房屋以中等破壞為主,其餘建築以嚴重破壞為主;建築物的震害預測結果體現了未來地震來臨時的震害程度,在編制漳州市區抗震防災規劃時,對于遭遇50年超越概率10的地震影響發生中等以上破壞的建築物應考慮進行抗震鑒定和加固;由建築物的破壞所造成的直接經濟損失是城市地震經濟損失的主要部分,重慶大學碩士學位論文中文摘要其主要與建築物總面積、結構類型、地震烈度和各類建築物的震害程度有關;不同烈度造成的直接經濟損失按2一3倍向高烈度方向遞增,漳州市區直接經濟損失由6度至9度的比例關系為1 : 2 . 8 : 8 . 6 : 22 . 8 ;遭遇基本地震設防烈度( 7度)時,漳州市區直接經濟損失約4 . 5億元,無家可歸人員約40000人,且以磚木結構和多層磚混結構的震害損失最大;地震造成的人員傷亡主要與建築物倒塌及嚴重破壞的程度和總面積以及震時的建築物室內人數密切相關,地震時無家可歸人員主要與住宅倒塌、嚴重破壞及中等破壞的程度和總面積以及城市人均居住面積密切相關。Precast concrete casting yard
預制混凝土澆灌場Workmanship on building sites - code of practice for concrete work - sitework with in situ and precast concrete
建築工地操作工藝.混凝土作業實用規程.現場作業和預制混凝土In the paper, through the example of the waiting hall of xt an international airport, several main questions meet in the design have been discussed, analyzed and solved, which include in negative friction force around pile in collapsible loess, the calculating method of bearing capacity of pile. the crack control methods of analysis and design in the super - length reinforced structure have been tested in the project, and reached the effect to be hoped
本文通過西安咸陽國際機場新航站樓工程設計的具體實例,分析、論述了建築結構在設計中遇到並解決的幾個主要問題:如自重濕陷性黃土場地樁基負摩阻力問題;淺層土雖經強夯但下層土仍有可能產生負摩阻力時樁的承載力計算方法;對鋼筋混凝土結構的裂縫控制實現超長設計的分析和設計對策,經過工程驗證,達到了預期的效果。Subassemblage and prestressed concrete frames are assembled by precast prestressed beams and columns with tendons in the joints of the frames. these beams and columns are hoisted in site and the tendons are passed through the moire pipes. so prestressing force are brought to the joints of the frame. these tendons also can assume the moments at the end of the beams in ordinary condition
預壓裝配式預應力混凝土框架是採用工廠化生產的預制柱和預制預應力梁,運至現場直接吊裝,樑柱就位后,將后張預應力筋穿過樑柱預留孔道,對節點實施預應力張拉預壓。Subassemblage and prestressed concrete frames are assembled by precast prestressed beams and columns, which are made in the factories, with tendons in the joints of the frames. so the joints and frame are monolithic and continuous, consequently, this kind of frame systems possess higher reliability and solve the problems in the process of assembling, exploring a new way for industrial production of prestressed structures
預壓裝配式預應力混凝土框架是採用工廠化生產的預制柱和預制預應力梁運至現場安裝,並對節點實施二次預應力張拉,構成整體受力節點和連續受力框架,克服了裝配式節點受力可靠性差的缺陷,開辟了預應力結構工業化生產的新途徑。This paper has studied and set up a supervision and control system based on the backing item of jinzhou yangtze river bridge with main span of 500m, by analyzing the development of construction control of cable - stayed bridges in china and abroad, foreword calculation of 250 work cases of plane bar fem, adoption of advanced equipment and devices, quick analysis of gathered data research of karemen filtering method, least square and gray model gm ( 1, 1 ) into the identification of the real state and precuts and effective manage mechanism
本文以荊州長江公路大橋主跨500米的混凝土斜拉橋施工為應用背景,通過分析目前國內外大跨度混凝土斜拉橋施工控制現狀,結合該橋施工實踐,運用平面桿系有限元計算理論對大橋250個工藝進行正裝計算,採用先進測試設備和儀器,利用計算機快速分析處理技術對現場監測系統收集的數據進行誤差分析,系用卡爾曼濾波法、最小二乘法和灰色理論gm ( 1 , 1 )進行結構真實狀態的識別和後期預測,通過科學高效的監控管理機制的運行和監控實踐,探索並建立了一套適合於大跨度混凝土斜拉橋的施工監測監控體系。分享友人