混成樁 的英文怎麼說

中文拼音 [húnchéngzhuāng]
混成樁 英文
composite pile
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  1. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋鉆孔壓灌凝土技術自研製以來,已在多項復合地基工程中進行了應用,較好地解決了軟弱地層孔困難的問題,適應地質條件范圍廣,速度較快,工期短、工效高;與復合地基時的泥漿護壁孔工藝、振沖工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優點;另外,壓入鉆桿內的凝土為泵送免振凝土,因此體質量易於保證;與泥漿護壁和干作業孔工藝相比,螺旋鉆孔壓灌凝土的側阻和端阻都有相應的提高,的承載性能較好,復合地基的變形較小。
  2. The research reveals that in the complex foundation, the application of screw drill press concrete stake technology is feasible. it has notable effects in reducing the sedimentation of the complex foundation, ensuring the stake quality of the basic stake, improving the weight bearing capacity, saving costs, and cutting time limit

    研究表明,螺旋鉆孔壓灌凝土技術在復合地基中的應用是可行的,它在減小復合地基的沉降量,保證基質量,提高承載力,節約工程造價,縮短工期等方面均有顯著作用。
  3. Cast - in - place piles with expanded branches or plates based on common concrete bored piles are a new type of piles foundation which have the specialty of high vertically bearing capacity and have been marked both economic and social benefits. especially in the resist draw load, it indicates a broader application scope. however, because of the poor application of cast - in - place piles in the practices, almost all the experiments are based on modeling experiments

    擠擴支盤凝土灌注是近年來工程界有較強生命力的新型,該型是採用仿生學的方法在原有等截面凝土灌注的基礎上研發功的,其顯著的特點就是具有較高的單方凝土承載能力,具有良好的社會與經濟效益。
  4. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔基礎的發展歷程及研究現狀,重點討論了填石壓漿凝土空心、預制預應力凝土空心工藝、填石壓漿凝土的配合比設計原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿凝土空心基礎的質量檢測方法及標準;並在此基礎上,深入分析了側、端承載能力,提出了填石壓漿凝土空心的設計計算理論和方法。最後,論證了空心新工藝的可行性、適應性、經濟性,為大力推廣應用空心新技術提供了可靠的技術資料。
  5. Application of inserted reinforcing bar cage after completion of bored pile with long helix in beijing subway construction

    長螺旋孔壓灌凝土后插鋼筋籠施工工藝在北京地鐵施工中的應用
  6. Based on the screw drill press concrete stake technology, via the practical application of this technology in complex foundation form stake, this thesis goes deeply into the screw drill press concrete stake equipment and technology parameter in complex foundation, the weight bearing of the formed stake, the factors that affect the stake quality, and its practical application in the project and its social and economic benefits

    本次研究是在螺旋鉆孔壓灌凝土技術的基礎上,通過該技術在復合地基中的具體應用,對復合地基中螺旋鉆孔壓灌凝土設備及工藝參數、體的承載性狀、影響質量的因素及該技術在工程中的具體應用和社會經濟效益等問題進行了研究。
  7. Solid astra luoyang fire of anti - corrosion materials engineering limited, founded in 1993, is the collection of china ' s famous anti - corrosion materials research and production and fire at the scene for the construction of an integrated enterprise, in addition to fire anti - corrosion coating production, but also professional cathodic protection system for the production of various sacrificial anode and supporting materials, products including magnesium - based, zinc - based, aluminum sacrificial anodes, with magnesium, magnesium rod, with zinc, titanium / mixed metal oxide anode zone, a titanium, astm265, high silicon anode cast iron, steel or cement testing poles, various reference electrode welding mode and flux, mandatory current cathodic protection act by magnetic saturation potentiostatic yee

    洛陽固雅特種防腐防火材料工程有限公司立於1993年,是國內著名的集防腐防火材料科研生產和現場施工為一體的綜合性企業,除生產防腐防火塗料外,還專業生產陰極保護系統所需的各種犧牲陽極和輔助材料,產品包括鎂基、鋅基、鋁基犧牲陽極、鎂帶、鎂棒、鋅帶、鈦/合金屬氧化物陽極帶、一級鈦、 astm265 ,高硅鑄鐵陽極、鋼制或水泥測試,各類參比電極、焊模和焊劑,強制電流法陰極保護用磁飽和恆電位儀等。
  8. He reiterated that the seven votes of the breakfast group were all in support of the setting up of a select committee and that even if the government set up a commission, the two bodies could investigate simultaneously, as was the case in the chaotic opening of chek lap kok airport and the short - piling scandals

    他重申,早餐派7票都支持立專責委員會,並認為即使政府另設委員會,也可同步進行,就如過去機場亂事故、短事件一樣。
  9. In the mean time, i discusses the technology of drill - grouting pile foundation, especially in the technology of drilling works, steel works and concrete works, etc. at last, i put forward the methods in dealing with the common accidents

    同時,本文詳細探討了巖溶地區鉆孔灌注施工技術,特別是對其孔工藝、鋼筋工程、凝土工程等進行了重點分析,並提出了針對其常見質量事故的處理方法。
  10. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展工程的實驗室承載力監測方法與設備、如何使土方開挖機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波層析像技術監測鋼砼內部質量的方法與程序,並得出了聲波層析像技術是砼的動態質量檢測的有效手段,這對指導施有積極、現實意義;提出了綜合運用朗肯土壓力理論、基坑空間和時間效應影響理論來分析逆作法施工過程中基坑邊坡土體應力及應變的變化情況,指出粘土地區也應考慮時間效應,並且進一步分析了基坑邊坡土體的塑性區形和發展,找出邊坡最不利的區域,以確定地下室土體的挖掘的方式和順序,指出憑主觀臆斷與經驗來施工是不可取的;在分析、經較逆作法與大開挖順作法的地下室結構體系受力情況及施工順序的不同,提出了節點處理技術;分析了逆作法施工期間的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對土體邊坡穩定產生影響的觀點,並分析了在環境振動影響下,土體的應力狀態及土休失穩破壞概率,並且還運用彈性力學知識和數學分析的方法定量地分析了地下凝土墻受力狀態,指出了被監測墻體的最大應力、應變位置。
  11. Results of calculation show that dissipation of excess pore water pressure due to squeezing effect of concrete - cored sand - gravel piles is faster than that of the ordinary cfg piles

    算例表明,后的凝土芯砂石,其擠土效應產生的超孔隙水壓力的消散,遠快于常用的水泥粉煤灰碎石( cfg) 。
  12. The main causes of breakage were concrete tube pile instability of foundation pit or failure of its bracing, soil squeeze due to pile driving, incorrect excavation and incorrect heap of soil

    摘要造凝土管傾斜與斷裂的主要原因為基坑邊坡失穩或支護結構破壞、沉擠土效應以及挖土與堆土不當等。
  13. The cement - soil mixing pile with concrete core is a new soil improvement method, it means that, a concrete core is plugged into cement - soil mixing pile. concrete core pile and the cement - soil mixing pile undertake together vertical load. it appropriately combines the advantages of the precast concrete pile with the cement - soil mixing pile

    水泥土組合是在水泥土攪拌之後,水泥土初凝之前,用壓機械將預制凝土芯壓入水泥土體內,待水泥土凝固后,芯與水泥土共同工作,承受上部荷載的一種新型。
  14. Through the analysis of the status of huangbizhuang reservoir and other problems, such as its destruction caused by water seeping, and with the reference to the internal successful application, the project adopted the measure of constructing concrete cut - off wall on body and foundation of the auxiliary dam between stake no. 0 + 840 and stake no. 5 + 740

    通過分析黃壁莊水庫現狀及存在的滲透破壞等問題,類比國內功的工程實例,本工程副壩在號0 + 840至5 + 700採用在壩體和壩基建凝土防滲墻處理措施。
  15. The design and construction of the reinforced concrete sheet - pile and the impact from the constuction on the ancient sea embankment and the historic buildings therein are described in detail herein combined with the successful case of the application of reinforced concrete sheet - pile to the erosion control for the ancient sea embankment of qiantang river

    摘要結合鋼筋凝土板在錢塘江明清海塘防沖工程中功應用的實例,詳細介紹了鋼筋凝土板的設計、施工及施工對海塘與海塘上古建築的影響。
  16. For reducing the water content of pore, the feasibility of drinking and cementing, and the key influence factors of drinking capability of fa - lime - sulfate system concrete pile molded in dry state are analyzed

    為了降低地下孔隙水含量,研究了粉煤灰-石灰-硫酸鹽凝土採用乾料形態型后吸水硬化的可行性與關鍵影響因素。
分享友人