測壓井 的英文怎麼說

中文拼音 [jǐng]
測壓井 英文
piezometric well
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 壓構詞成分。
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    鉆孔彩色電視孔壁成像系統、直接橫波研究偶極子下聲系和聲波儀、鉆孔多點滲儀及模系統、巖質高邊坡快速攝像微機地質素描成圖、層析成像技術、近壩庫段安全監技術、邊坡監數據處理預報軟體研究、高精度大地量監自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。
  2. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  3. The drill and petroleum extraction tools test - well is made up of the multifunction test - machine system ( hydraulic system ), the calefaction system the circulation system, the testing system and the assistant system

    鉆采工具試驗共由多功能試驗機系統(液系統) 、加熱系統、循環系統、試系統和輔助系統組成。
  4. Abnormal well head pressure of high productivity gas wells in luojiazhai

    羅家寨高產能氣力異常分析
  5. The result is that this gas pool has simple structure, only forms a little nose - like structure at the district of fenghuangshan ; this pool belongs to delta front sub - facies sedimentary model, the underwater distributary channel and mouth bar is the better sedimentary microfacies ; the physical property of the reservoir is poor, the type of pore of the reservoir rock mostly are intergranular pore, intergranular solution hole and little are intercrystalline micropore ; the influential factors of pore structure and physical property are lithofacies, lithologic character and diagenesis ; the off - take potentia of all the testing well are deadly shortness, the wells have the worth of industrial recovery only under the condition of going through sand fracturing, and in the early of binging into production, the oil and sheath pressure drop rapidly, the production of the well drop rapidly

    研究認為該氣藏構造簡單,只在鳳凰山形成了一個小型的鼻狀構造;屬於三角洲前緣亞相沉積模式,水下分流河道和河口壩是有利的沉積微相;儲層物性差,儲層巖石的孔隙類型主要有粒間孔、粒間(內)溶孔及少量晶間微孔;影響蓬萊鎮組氣藏儲層孔隙結構及儲集性的因素有巖相、巖性條件及成巖作用;所有自然產能都極低,必須經加砂裂后才有工業開采價值,且投產初期,油套下降較快,氣產量下降迅速。
  6. The purpose of ip logging is to determine the depth and geometry of the polarizable bodies.

    IP的目的在於確定極體的深度和形狀。
  7. Using loges evaluation system, evaluate the microscopic seal ability of claystone formation in study area. and using standard breakthrough pressure of sample, incorporation with macrofeature as lithologic, sediment phase, thickness, continuity and so on, comprehensive evaluate the seal ability of every seal formation

    利用loges評價系統對研究區蓋層微觀封蓋能力進行了系統評價,並應用取心樣品的突破力標定,結合巖性、沉積相帶、厚度、連續性等宏觀特徵對各套蓋層開展了綜合評價。
  8. 176 drillholes, 9 coreholes, 178 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works along tuen mun road

    176個鉆孔, 9個土芯鉆孔, 178個探,重整48個豎管計及一系列的土壤和巖石樣本的實驗室試驗。
  9. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個鉆孔, 250個探,重整48個豎管計,將所取得的土壤和巖石樣本進行實驗室試驗,以及對屯門公路上現有的公路建築物進行結構狀況勘
  10. With the research object of overbank soft clay near the yiluo river, by means of pack drain to accelerate the consolidation of the soft ground and analysis of fourteen selected representative observation section, in the same time with the help of such testing apparatus as settlement plates, deflection inclinometer, piezometer, telescoping tube, my study not only evaluate the effect of pack drain ' s quickening up the consolidation of soft ground impersonalily and scientifically but also sum up the settlement disciplination of overbank soft clay after more than one years ? observation of settlement and stability continuously

    本文以伊洛河河灘相軟土為研究對象,利用沉降板、斜管、孔隙水力計、分層沉降標等多種試儀器,選取14個有代表性的觀斷面,進行了一年多的沉降與穩定觀。通過對觀數據的分析,進而對袋裝砂加速河灘相軟土固結效果進行了客觀、科學的評價,同時推算了沉降系數m _ s和固結度參數,並對河灘相軟土的沉降規律進行了分析。
  11. Aiming at the problems in testing strata with low permeability, hydrogen sulfide - bearing wells and high temperature and pressure, a whole set of mature testing technology and doable construction programs are worked out, which turn out to be mature in technology, secure in construction and objective and accurate in testing results examined by practical construction

    摘要針對低滲透地層試、含硫化氫試及高濕高中存在的問題,經過不斷探索和實踐,形成了一整套成熟的試技術和切實可行的施工方案,經實際施工檢驗證明,技術成熟,施工方案安全可靠,試結果客觀準確。
  12. Aim at high pressure high temperature well practice engineering question in field development engineering, especially cnpc southwest oil gas branch gas recovery academy project ' s concretion demand, based upon in existence measuring and testing techniques foundation, the dissertation produce a sort of new optical fiber downhole high pressure high temperature test system, and finish downhole fibre optic pressure sensor ' s design

    本文針對油氣田開發工程中高溫高的實際工程問題,特別是cnpc西南油氣田分公司采氣工程研究院科研項目的具體要求,在分析研究現代試技術基礎上,提出一種新型的光纖式下高溫高試系統,並主要完成了下光纖力傳感器的設計。
  13. Case correlation study shows that for gas wells without shut - in pressure survey, this method can be used to resolve the reservoir parameters

    實例對比表明,對于沒有關的氣,可以用該方法反求氣藏參數。
  14. Many data such as m / g, em and seismic have been arranged, processed and interpreted in shengli oilfield, in which, the interpreted data ( 2 - d ) are 64 lines with 1800km. the techniques such as integration of process and interpretation, joint interpretation of m / g, em and seismic, variable velocity mapping, pressure prediction, constraint inversion without well and special process have been applied. the comprehensive researches on geology and physical exploration have been carried out in the whole block

    該區油氣勘探始於50年代,勝利油田在該區塊先後部署、處理、解釋了重、磁、電、震等多種資料,其中解釋地震資料( 2d ) 64條、 1800多公里,才用了處理解釋一體化、重、磁、電、震聯合解釋、變速成圖、力預、無約束反演、特殊處理等技術,對整個探區進行了地質、物探等綜合研究,發現兩個有利構造帶,落實了13個圈閉構造,提交了兩口探位。
  15. Shut - in pressure survey is the conventional method for determination of gas reservoir parameters

    摘要確定氣藏參數的方法常常是關
  16. Bottomhole pressure survey

  17. Some actual statuses of the relief wells in shijiao section of the beijiang dike are presented and the experiment results are analysed

    摘要簡要介紹北江大堤石角堤段減的實際情況以及試驗檢的內容,分析了本次減試驗所取得的成果。
  18. New breakthroughs are obtained in manufacturing large - scale ultrahigh pressure container, design of ultrahigh hydraulic pressure system, design of multi - media large delay nonlinear control system, detecting state of device tested under simulation environment, modeling of in - well environment of oil field

    並在大型超高容器製造、超高系統的設計、多介質大延時非線性控制系統設計、模擬環境中試驗設備工作狀態的檢、油下環境的建模等方面取得了新的突破。
  19. This paper introduces a method for determining average formation pressure in homogeneous gas wells and gas wells with boundary and formation heterogeneity, checked by actual measured pressure value, this method is proved to be simple and effective

    本文介紹了均質及存在邊界或地層非均質氣平均地層力的確定方法,經實力值檢驗,證實方法是簡易有效的。
  20. Abstract : this paper introduces a method for determining average formation pressure in homogeneous gas wells and gas wells with boundary and formation heterogeneity, checked by actual measured pressure value, this method is proved to be simple and effective

    文摘:本文介紹了均質及存在邊界或地層非均質氣平均地層力的確定方法,經實力值檢驗,證實方法是簡易有效的。
分享友人