The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection
本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。The littoral zone of a sea is the part of the sea between high and low tide marks.
海的沿岸地帶是高潮的測標和低潮的測標之間的海域。Resurvey the column axis and elevation line, and mark out the column form line, 1 : 2 cement mortar will be used to leveling at the column bottom. “ 井 ” shape rack will be set around each column, and mark elevation control line on it
將柱軸線、標高線復測投點,彈出柱支模線,將柱腳支模處用1 : 2水泥砂漿找平,每根柱周圍搭設井字架,在井字架上抄測標高控制線。Standard test method for cathodic disbonding of exterior pipeline coatings at elevated temperatures using interior heating
用內部加熱測定高溫下外部管道鍍層的陰極斷接的標準試驗方法3. after studying deeply the multi - antenna sar mtdi based on displaced phase center antenna ( dpca ), a new double - antenna method is proposed which remedies the shortcomings of conventional ways. the method need n ' t meet the constraint condition that conventional ways must meet and can suppress ground clutter effectively and detect moving target
針對常規dpca方法的缺點創新性的提出了一種新的雙天線動目標檢測方法,建立了該方法的檢測模型並對該方法進行了有效的驗證,該方法不合成孔什雷達動口標檢測和成像研必滿足常規方法所必須滿足的限制條件就能夠進行動目標檢測,提高了dpca的實用價值。Gauge hatch series, which are pedal type and set on the tank roof for measuring the oil lever & temperature and also for sampling of the oil in the tank
量油孔為腳踏式,安裝于油罐頂部,用於測量罐內油品的標高和溫度及取樣等。The detection limit was 0. 5 ng / ml and the calibration curve was in the range of 0 - 100 ng / ml. the within - run coefficient variations for standard samples were less than 10 %. one distinguished feature of this approach was its nearly homogeneous reaction and solution phase detection, which made the detection rapid and reproducible
5ng ml ,標準曲線范圍為0 - 100ng ml ,檢測標準樣品的批內cv小於10 ,採用這種液相反應及液相熒光測定的方法,提高了分析速度。This paper discusses that two chinese ways of expressing passive meaning - the ideational passives without marked words and the passives with marked words exemplify the principle of quantitative iconicity, and the former express the conventional high - predicted information in simple forms, while the latter express the unconventional low - predicted information in complex forms
摘要漢語被動含義的表達式無詞項標記的意念被動句和有詞項標記的常規被動句體現了數量象似原則,前者以簡單的形式表達了規約化的、預測性高的信息,後者以復雜的形式表達了非規約化的、預測性低的信息。Plane curve of setting out top - class highway with the method of polar coodinate
極坐標法測設高等級公路的平曲線When the simulation calculation procedure is applied to the rib - hoisting process of nannidu arch bridge, simplification model suited to the case is established, the pre - rising elevation on the rib - hoisting course is predicted, and real - time control is discussed
將模擬計算程序應用於南里渡特大橋拱肋吊裝過程,建立了適合現場計算的簡化模型,預測了拱肋吊裝階段的預抬標高,並對吊裝過程進行實時控制。Standard test methods for measurement of gloss of high - gloss surfaces by abridged goniophotometry
用簡化濾色測角光度計測定高上光表面光澤度的標準試驗方法In view of the defects in gb, a novel method was proposed after many experiments to accurately measure the content of pyrites sulfur derived from coal
摘要針對國標法難以準確測定含量高達40 %左右的煤系硫鐵礦中硫化鐵硫的不足,通過多次試驗提出一個可以準確測定高含量煤系硫鐵礦中硫化鐵硫的方法。Standard test method for measuring the quasi - static release moments of alpine ski bindings
測量高山滑雪板綁帶的準靜態脫扣力矩的標準試驗方法Height location accuracy is calculated, and useful conclusions are given in the end
最後,計算了目標高度測量精度並歸納了其特點,給出了有益的結論。Standard test method for determining susceptibility to stress - corrosion cracking of 2xxx and 7xxx aluminum alloy products
測定高強度鋁合金製品應力腐蝕斷裂敏感性的標準試驗方法Standard test method for determination of thermal shock resistance for advanced ceramics by water quenching
用水淬火法測定高級陶瓷製品耐熱沖擊性的標準試驗方法At the finishing of this paper, the effective identification of designing factors is done and the setting elevation and the cable tension force in next stage are forecasted according to the situation of finished beams. through the forecasting, the constructing state is in coincidence with the designing state. during the bridge construction process, the value of designing parameters are made close to the construction state by means of data collections, optimal controls and detailed analysis of different reasons that caused errors
最後,根據施工的實際狀態對設計參數進行了有效的識別,並利用灰色理論與預測控制相結合的方法,根據已澆梁段的實際狀況對下一施工梁段的立模標高和斜拉索張拉索力進行預測,使施工過程中的受力狀態與已確定的合理施工狀態達到一致。Its main steps are as follows : ( 1 ) to determine the tensor of hydraulic conductivity of the rock mass near the ground ; ( 2 ) to back - analyzing of stress field ; ( 3 ) to predict the fissure aperture at different levels ; ( 4 ) to suppose the structure of fissure network not to vary with depth and to calculate the tensor of hydraulic conductivity of the wall rock
其主要思想是,首先確定近地表巖體的滲透張量;根據地應力實測資料進行地應力場的量級反演;選擇適當的裂隙開度-應力模型,預測不同深度的裂隙開度;在裂隙網路結構不隨深度變化這一假定的基礎上,計算隧道標高的圍巖滲透性。A model with some parameters is used to forecasting the beam camber in the construction. based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed and so on working condition, the model parameters are identified by ann, and the beam camber of different sections are given
建立施工預拱度的數學模型,根據施工時的預應力張拉后等工況橋面實測標高與設計值的差異,用bp神經網路識別預拱度模型的參數,確定有關各截面的預拱值。Based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed long span bridge, the model parameters are identified by the genetic algorithm, and the pre - stress loss values of different sections are given
建立附加損失的數學模型,根據施工時的預應力張拉后橋面實測標高與設計值的差異,用遺傳演算法識別損失模型的參數,確定有關各截面的損失值。分享友人