溝施 的英文怎麼說

中文拼音 [gōushī]
溝施 英文
strip dressing
  • : 名詞1 (挖掘的水道或工事) channel; ditch; gutter; trench 2 (淺槽;似溝的窪處) groove; rut; furr...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  1. In order to decrease expenditure and increase total economic efficiency, the key technique consisted of a complete sets of base fertilizer heavily, stabilizing n, increasing p and k, herbicide, coordinating of irrigation, fertilization and dpc regulation in first - flowering time, water - saving by furrow irrigation, simple pruning of cotton plants, chemical accelerating the ripening and so on

    以重基肥,穩氮增磷增鉀,化學除草,初花期水、肥、控同步,灌節水,簡化整枝及化學催熟等項技術組裝配套,達到節支省工,提高整體經濟效益。
  2. I am sure that the more people know about our work, the more they will support us and rally behind our common cause towards building up a clean culture in hong kong

    我們希望透過這些加強通的新措,會令市民更加認識廉署,從而更加支持和認同我們的工作,建立一個更加廉潔的香港。
  3. Facilities include the land of plenty guangdong style restaurants, a beautifully - designed restaurant is renowned for authentic cantonese cuisine ; home western restaurant and japanese restaurant offer a distinctive and global dining experience ; the butterfly ; flower lobby bar in the atrium serving light snacks and beverages ; karaoke rooms are eponymous with fun and laughter ; sauna club for leisure and rejuvenation ; multi - shops, cigar bar, well - equipped recreation facilities and large - sized parking lot will ensure the satisfaction of your demands

    歡樂豪華的ktv ,帝王級享受的翠堤灣桑拿,是您商務休閑會議娛樂最佳之選餐飲設180個餐位的雅谷西餐廳,開放式製作,美味無國界,國際大廚與您互動通,充分享受海陸空自助大餐之樂趣。
  4. In abandon farmland afforestation, can use soil preparation of channel of hold up fosse, level, dig the measure such as segregation belt

    在棄耕地造林,可採用撩壕、水平整地、挖隔離帶等措
  5. Does the use of clinical paths improve the efficiency and quality of care under the case payment system for inguinal herniorrhaphy or transurethral prostatectomy

    在論病例計酬制度下對于接受腹股疝氣修補及經尿道前列腺切除術的病人行臨床路徑可以改善醫療照護的效率及品質
  6. The products are widely applied to lander, branch lander and safety liners of large and medium - sized high furnaces with one - time iron capacity of over 100thousand tons. after rectifying, the iron capacity can be as much as over 300thousand tons

    同時具有抗氧化、耐熱震、烘烤時間短、工方便等優點,廣泛應用於大中型高爐出鐵主、支和安全襯,一次性通鐵量十萬噸以上,經修補后通鐵量可達三十萬噸以上。
  7. Prevention and cure measures of erosion ravine in baiqian country

    拜泉縣侵蝕防治措
  8. Plan, coordinate, and implement production plan on daily basis as well as interface with mst team to coordinate / prioritize the scheduling of batches made, rush orders, inventory management, and become proficient with sap

    計劃、協調、實日常生產任務,與其他部門通有關生產、緊急定單、庫存管理等事宜。
  9. Standard specification for storm drain resilient connectors between reinforced concrete storm sewer structures, pipes, and laterals

    加筋混凝土暴雨排水管道和橫向排水間的排水回彈性連接件的標準規范
  10. Because all the stratal configuration in loess ravine region are similar totally, the numerical model in this paper can be modified to suit for other section

    由於黃土壑區濕軟地基的地層結構較為類似,依據文中的數值模型可修改相應參數後用于其他相似斷面,為地基處理方案的設計和工提供依據。
  11. Through the analyses of characteristics of gully thalweg and soil erosion in upland and gully land, sediment sources in small watershed, sediment yield relationship between upland and gully and ecological functions of vegetation corridor, it is considered that vegetation corridor combined with land preparation measures may block runoff and sediment from upland and reduce the amount of soil erosion in a watershed by 54. 5 % ~ 77. 0 %

    摘要在分析黃土高原地區的沿線、沿線上下間地和谷地土壤侵蝕特徵、小流域泥沙來源、坡侵蝕產沙關系的基礎上,結合廊道的生態功能和以往的研究結果,認為在沿線的上部建立草灌與整地工程措相結合的植物廊道,來攔蓄阻截間地的來水來沙,可使流域的土壤侵蝕量減少54 . 5 % ~ 77 . 0 % 。
  12. Other military remains, such as the battery, torpedo station, caponiers and the ammunition store, have all been restored as part of a historical trail where visitors can picture the role played by lei yue mun fort in the coastal defence system

    其他舊有的軍事設,如炮臺、魚雷發射裝置、堡及彈藥庫等,亦已一一修復,並開辟為一條古跡徑,讓參觀者親身體會它們在鯉魚門炮臺防衛系統中的作用。
  13. Then the lord said to isaiah, " go out, you and your son shear - jashub, to meet ahaz at the end of the aqueduct of the upper pool, on the road to the washerman ' s field

    3耶和華對以賽亞說,你和你的兒子亞雅述出去,到上池的水頭,在漂布地的大路上,去迎接亞哈斯。
  14. Lastly, taking as reference the practice of developing mis and software development process control and iso quality system, the thesis proposes the whole steps and means of process control of the system

    卜海運學院o口:論義最後作者結合船舶管理信息化應用軟體廠發實踐,提出了船舶安全與技術管理系統應用軟體開發項目整個過程式控制制的措與方法。
  15. Oversees the coordination of building space allocation and layout, communication services and facilities expansion

    預見建築的分配和布局、通服務設和設備擴建。
  16. An ultimatum might be issued to increase the urgency of compliance, and if the enemy fails to comply within the time limit, the possibility of resorting to force by the us would be highly increased. nevertheless, in symmetrical crises like the north korea nuclear one, the us options would be severely constrained with the policy dilemma of crisis management mentioned above. therefore, the crisis managers of the us would like to follow the carrot and stick approach to manage the crisis, namely, they would do whatever is needed to protect or advance their most important interests

    然而,在對稱性危機中,美國的危機管理者則不得不承認危機管理困境的存在,傾向于採取「軟硬兼」的危機管理模式,即:危機管理者以防止戰爭作為最高優先目標,在防止戰爭的前提下追求已方利益;能夠遵守危機管理原則,綜合或交替運用壓與妥協的危機管理策略;注重保持與對手之間通渠道的暢通,正確把握對手的意圖、決心和能力;避免危及對手核心價值體系,圍繞利益展開「理性的討價還價」 ;通過利益交換或議題聯接,共同尋求和平解決危機的途徑,防止己方不願見到的危機升級。
  17. Article 31 when construction projects of a permanent nature are being erected on either side of a highway, the distance from the edge of the building facing the highway to the outer rim of the roadside ditch of the highway should be no less than 20m for state highways, 15m for provincial highways, 10m for county roads, and 5m for township roads

    第三十一條在公路兩側修建永久性工程設,其建築物邊緣與公路邊外緣的間距為;國道不少於二十米,省道不少於十五米,縣道不少於十米,鄉道不少於五米。
  18. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了工導流建築物的等級、水工布置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖水利樞紐工程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為工決策提供理論依據。
  19. Before maize interplanting, 40 % of n, all of p and k and even small amount of organic manure are used by furrow application as basal, or dressed in seedling stage after wheat harvest if operation is difficult to be put into interplanting space

    套種玉米前,溝施40 %氮、全部磷、鉀甚至少量有機肥作為基肥,或者當入套種帶作業困難時在小麥收獲后苗期追肥。
  20. Trenchless construction and testing of drains and sewers

    排水管和污水管的非挖溝施工和試驗
分享友人