溫度縫 的英文怎麼說

中文拼音 [wēnféng]
溫度縫 英文
temperature joint
  • : Ⅰ形容詞(不冷不熱) warm; lukewarm; hot; gentle; mild Ⅱ名詞1 (溫度) temperature 2 (瘟) acute ...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : 縫名詞1. (接合處) seam 2. (縫隙) crack; crevice; fissure; slit
  • 溫度 : [物理學] temperature
  1. Control of gravity abutment temperature crevice

    重力式橋臺控制
  2. Comparing with the same category overseas jointless bridges, the new type bridge has more reasonable structure, more simple and convenient construction, and better use effect etc. the main work in this paper is described as follows : ( 1 ) this paper introduces phylogeny and reseach survey of the joints bridge inland and abroad, and a new jointless bridge structure ? new type semi - integral abutment bridge is based on these, which characteristic of own structure and setting of primary component are expatiated. ( 2 ) this paper analyses influence of temperature effect, creep, shrinkage and circumambient soil of run - on slab on the new type structure, and analyses the forcing performance of beam, abutment and run - on slab of the new type semi - integral abutment bridge, and constrast to the same category joints bridges

    本文主要做了以下工作: ( 1 )介紹了無橋梁在國內外的發展歷史、研究概況,並在此基礎上提出了一種新的無橋梁結構形式-新型半整體式無橋梁,闡述了它特有的結構形式以及主要構件的設置; ( 2 )分析了效應、徐變和收縮以及搭板周圍土體對這種新型結構的影響,對新型半整體式無橋主梁、橋臺以及搭板進行了受力性能分析,並和同類無橋梁進行了對比分析。
  3. How to deal with temperature crevices of a building

    談建築物的治理
  4. The analysis and protecting of appearing temperature crack in the process of large volume ferroconcrete project

    大體積鋼筋混凝土施工中的分析與防治
  5. Some other defects in castings are well - defined cracks and hot tears that develop during solidification, under combination of stress concentration from uneven contraction and the metal ' s low strength at near - melting temperatures

    鑄件內部的其它一些缺點是,凝固過程中,在不均勻收縮造成的應力集中和接近熔點下金屬的低強的綜合作用下,出現的清晰裂和熱撕裂。
  6. The welding technology of francis turbine runners is optimized from the view of subsection welding and local heating by numerical simulation. the result shows that welding residual tensile stress appears in the weld and its area nearby, and peak stress appears in the dangerous area of blades after practising quondam welding technology ; welding residual tensile peak stress in the dangerous area of blades can be decreased by welding both ends earlier and then welding middle section later during subsection welding, and decreasing effect on welding residual stress of the subsection welding is related to the weld length of blade outlets and welding direction of each subsection ; decreasing effect on residual stress of the local heating is direct proportional to heating time, heating temperature, heating area, and inversely proportional to cooling area, and welding residual tensile peak stress in the dangerous area is decreasing trend earlier, and then increasing trend later with heated location increased

    本文利用數值模擬手段對轉輪的焊接工藝從分段焊和局部加熱兩個方面進行了優化,結果表明:採用普通工藝焊接時,葉片焊后殘余拉應力出現在焊及其附近區域,並且在葉片出水邊的熔合線附近(危險區域)出現了峰值;在採用優化的分段焊時,先焊兩端后焊中間的方法可以降低葉片危險區域的焊接殘余拉應力峰值,降低效果與葉片出水邊焊段長、焊各段的焊接方向有關;局部加熱法降低轉輪危險區域殘余應力的效果主要與加熱時間、加熱以及加熱面積成正比,與冷卻面積成反比,並且危險區域的殘余應力隨加熱區域的增大呈先降低后升高的趨勢。
  7. Abstract : from the point of theoretical analysis, this dissertation provides the coupling calculation on the hot gas temperature field and ablation in the cavity between stress release boot and insulation of solid motors. through the calculation, some law of the ablation of the stress release boot is found

    文摘:從理論分析的角出發,通過對人工脫粘層和絕熱層所構成的槽燃氣場與燒蝕的耦合計算,得出了人工脫粘層的燒蝕規律。
  8. Traffic load and temperature load are two main factors accounting for its formation and propagation

    交通荷載和荷載是導致反射裂形成和擴展的主要因素。
  9. According to the m1l - std - 883c standard of thermal cycle loading, the delamination propagation rates at the interface between chip and underfill were studied experimentally by using c - mode scanning acoustic microscope ( c - sam ) for two types of flip chip packages with different states of solder joint

    採用mil - std - 883c標準,通過循環實驗,使用高頻超聲顯微鏡( c - sam )無損檢測技術,測量了在不同焊點狀態下, b型和d型兩種實際倒裝焊封裝晶元與底充膠界面分層裂傳播速率。
  10. This thesis investigated and researched on non - loaded crack, especially those caused by thermal - shrink, and analyzed the thermal - shrink stress of beam, slab and continuous - wall, found that according data of civil and overseas offered thermal - shrink calculating formula without considering effect of factors, such as the cement quantity, using of aruhuesiru, aggregate size and quantity of sand, which made the result data smaller. in addition, there are not enough construct measure in code

    本文對非荷載裂,特別是?收縮裂進行了調查研究,並對兩端或四周約束的梁、板和底部約束的地下連續墻進行了收縮應力分析,發現國內外有關文獻給出的收縮計算公式沒有考慮泵送商品混凝土的水泥用量、外加劑使用、骨料粒徑和砂用量等因素的影響,計算出的混凝土收縮量往往偏小;另外, 《規范》中針對?收縮裂的構造措施不足。
  11. Abstract : the temperature cracks of mansonry structure in the body of attique were observed and analyzed, a simple, reasonable and highly effective method of crack control is given

    文摘:對磚混結構頂層墻體普遍存在的進行觀測、分析,探討其開裂原因,並提出了簡單、合理、有效的處理方法。
  12. In the dam foundation restraint area, mgo can be mixed into concrete to prevent dam longitudinal crack. research on autogenous volume change of rcc mixed with mgo, and research on thermal stress compensation of darn foundation prove that rcc mixed with mgo plays a role in dam crack control

    在材料措施方面,深入研究高碾壓混凝土壩基礎約束區採用外摻mgo措施,利用其微膨脹性能補償壩體降過程中產生的應力,以防止大壩縱向裂的發生。
  13. The temperature cracks are calculated by use of a crack band model, and the stress and cracking of the concrete wall are computed by using the half - analytical iteration method

    採用裂帶模型計算,用半解析迭代法進行了混凝土墻的應力和開裂計算。
  14. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進;在二期混凝土施工區域,為免除人工鑿毛勞動強,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強和鋼筋連接速,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土控綜合技術的應用,有效降低了壩體混凝土的產生;混凝土表面處理及裂處理技術的應用,提高了建築物的整體性和耐久性。
  15. Through the research work of this article, it is shown that cfd technology can efficeintly instruct the design of indoor air distribution and evaluate indoor air quality and ventilating effect ; the distribution of heat sources have great impact on indoor air distribution ; under variable air volume condition, the indoor temperature and velocity fields are quite even and the thermo - environment is relatively good when using diffusers with coanda effect such as square diffuser and slot diffuser to supply air

    經過本文研究發現,利用cfd技術可以有效地對空調室內氣流組織設計進行指導,全面對室內空氣品質和通風效果進行評價。熱源分佈對于空調室內的氣流組織具有極其重大的影響。在變風量條件下,利用具有良好貼附效應的送風口如方型散流器和條風口送風,空調室內的場和速場較均勻,室內的熱環境良好。
  16. There is an old saying in our field - " no dam is not crackable ". the crack is mainly because of the bad dilation after " alkali - aggregate reaction ", the temperature traverse inside and outside the concrete with the happening of heat evolution and the shrink of volume due to the cooling of concrete

    水電行業有句「無壩不裂」的俗話,產生裂的原因主要有「堿集料反應」造成的破壞性膨脹,水泥水化過程中放出的熱量出現的混凝土內外和水泥石硬化後由於後期降發生的體積收縮等造成。
  17. The proper interpass temperature is required to prevent cold and hot cracking as well as the proper selection of welding filler material, to produce the proper creep resistance and toughness

    需要適當的程間和正確選擇填充金屬材料來防止冷熱裂,產生適當的蠕變阻力和韌性。
  18. By analysis the test data, the law of temperature variation in day and temperature variation in month was got ; moreover, the probability statistics mode of day temperature difference with its statistic parameter was got too. at the same time, the year temperature difference data of walls and roofs were obtained. through the field tests, the law of thermal cracks, displacement and stress in cshbb was summarized

    對杭州市某一小砌塊試點建築進行了為期近一年的現場跟蹤監測研究,給出了小砌塊建築的日變化規律和月變化規律,並由此得到了小砌塊建築的日差概率統計分佈模式及相應的統計參數和小砌塊建築不同方位的墻體和屋面的年差數據;通過現場跟蹤監測,也得到了小砌塊建築的裂發展規律及位移和應力的變化規律。
  19. Thermosetting powder coating of low - temperature curing type is a newly - developed powder coating which is used on the things that are not suitable for high - temperture baking. this type of powder coating opens up wider application by lowering curing temperature to 108 - 130. it can be used for surface coatings on such things as flaw detectors, auto water tanks, springs, electrical appliances with coils, instruments, equipment with tin welding seams. it can also be used on the products made of aluminum and magnesium materials, glass, plastics and wood etc

    固化型粉末塗料是針對那些不宜高烘烤的產品,而最新研製的新品種,它不僅具備一般粉末塗料的特徵,而且可以把固化降低到108 - 130 ,從而拓寬了粉末塗料的應用領域;適用於擦傷機械、汽車水箱、發動機、彈簧、線圈電器、儀器儀表、錫焊條接設備、鉛鎂材質、玻璃、塑料、木材等製品的表面塗裝。
  20. According to differences of construction process, boundary condition, temperature and stress of two schemes extending 3m deep short seam on upstream face in the middle of rcc overflow section and no short seam are calculated, what " s more, in this paper the equivalent line drawing of stable temperature field and unstable temperature field during construction and operation period and the duration curve drawing of typical points " s temperature and stress are plotted, and the results of peak and minimum on temperature in every month and maximum on tensile stress are attained

    根據施工過程和邊界條件,對溢流壩段中間上游面增設3m深短和不設短兩個方案進行了和應力計算,並繪制出穩定場等值線圖及施工期、運行期非穩定場等值線圖,典型點和應力歷時曲線圖,逐月最高、最低和最大拉應力及相應位置等成果。
分享友人