  1. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給排水管道、設備安裝為2年; 5 、裝修工程為2年。
  2. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及的應力應變分析:被成都勘測設計研究院應用於加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防管涌破壞提供分析軟體; ( 5 )向家壩下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  3. Vertical double - wall steel tanks with liquid - based leak detection system, for the above ground storage of flammable and non - flammable water polluting liquids

    上存儲易燃和不易燃水污染液體的帶液檢測系
  4. Vertical double - wall steel tanks with vacuum - based leak detection system, for the above ground storage of flammable and non - flammable water polluting liquids

    上存儲易燃和不易燃水污染液體的帶真空檢測
  5. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場下室修與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  6. Adopt raduce shock structure low noise, washingand dewatering pass stable. need not base, adope import seal washer. good to sealing up. it had feeding equipment. modelling beautiful, strong and durable

    設備採用力學防震結構,噪音低,洗滌高脫過渡平穩,無需打。採用進口密封圈,無,有加料裝置,造型美觀。洗滌織物潔凈度高,去污徹底,不損衣物。
  7. The detection of hidden dangers in jinjiang reservoir dam with ground penetrating radar shows that the major hidden dangers of the dam are the karst caves in the dam basement rocks and the soil caves which were formed in the residual sola and talus sola by percolating channels such as faults and fissures

    摘要在金江水庫壩體隱患探測中,使用質雷達發現壩體的主要隱患來自壩體巖的溶洞和因斷裂、裂隙等通道在殘坡積土層中所成的土洞。
  8. On the basis of anatomizing the condition of hydrogeology with zhongliang water resources and power engineering, combined with the data analysis of flux with surface water, aquatic chemistry, and experiment of tracing, the condition of karst leakage in the region of reservoir is educed. the concept of reservoir leakage with these information is put forward, the leakage quantity of karst water in the region of reservoir with the method of water equilibrium is applied

    在仔細分析中梁水利水電工程庫區水文質條件的礎上,結合表水測流資料、水化學分析資料及示蹤連通試驗資料,得出水庫區巖溶條件,並在此礎上提出水庫概念模型,採用水均衡法計算出庫區的巖溶水量。
  9. Hang - jia - hu water - net plain is the primary grain production base of zhejiang province. with a high population and intensive land utilization, agricultural non - point source pollution is extremely serious in this region. animal wastes, household cleaning products, farmland runoff and leakage mainly contribute to the anpsp

    杭嘉湖水網平原區是浙江省主要的商品糧,土利用強度大,人口稠密,農業面源污染嚴重,其中畜禽糞尿、生活污染、農田徑流和是該區三大主要的農業面源污染源。
  10. The system differentiates between background losses at joints and fittings and larger scale bursts, and enables operators to quickly localize leaks, deploy maintenance teams, track maintenance status, and access essential zone criteria and data by remote

    該系統可以區分在管道連接處的和更大規模的爆裂之間的損失,使得操作員迅速定位點,組成維修隊,跟蹤維修情況,以及遠程訪問本的域標準和數據。
  11. The solution is based on abb ' s award - winning system 800xa automation platform and includes the wlms and power generation information management ( pgim ) software, the expansion of an existing abb scada system with 800xa and ac800m controllers, magmaster electromagnetic flow meters, and ctu800 - cpe remote terminal units

    該系統可以區分在管道連接處的和更大規模的爆裂之間的損失,使得操作員迅速定位點,組成維修隊,跟蹤維修情況,以及遠程訪問本的域標準和數據。
  12. On the basis of analyzing the features of commonly - occurred leak problem in exterior walls in coast area, seepage force of rainwater in exterior walls and comparison test results of permeability in exterior walls, the article proposes a basic principle of seepage prevention of exterior wall and introduces its use in newly - built residence and treatment for tough leak problem in exterior walls

    在分析沿海區建築外墻常見的特徵、外墻雨水透的動力以及外墻抗性能對比試驗結果的礎上,提出了外墻防本原理,介紹了其在新建住宅外墻防工程和外墻疑難問題治理工程中的應用。
  13. The key to calculate the moistening deformation is to work out the distribution of the water content. aiming to the collapsible accidents owing of leakage, this text establishs two - dimensional immersing model of collapsible loess and predicts the change of water content in loess subsoil. furthermore the text selects the stress path method to calculate the moistening deformation subjected to leakage, substituting compressing moduls for tangent moduls after taking cavity ratio and water content into account, putting forward the method to calculate the moistening deformation

    增濕變形的關鍵是研究含水量的變化,本文針對黃土由於水所引起的濕陷事故,建立了二維濕陷性黃土積水入模型,實現了對黃土含水量變化的預測,進一步選擇了分層總和法計算黃土增濕變形,考慮了含水量、孔隙比對模量的影響,以弦線模量取代壓縮模量,提出了計算增濕變形的計算方法,計算了由於水而引起的黃土增濕變形量。
  14. ( 4 ) on the basis of analysed result and the status quo of huxi bank, computing the slope safety and seepage of bank by fem. the result shows that the tarus quo of huxi bank could not satisfy theslope safety on designed flood lever. after the reinforcement of seepage, the method can not only reduced leakage, debace the soggy but also ameliorate stress fields. lt also can reduce horizontal displacement and certical displacemeng which have disadvantages to bank

    進行堤體防加固后,不但可以減少,降低堤身浸潤線,還可以有限度提高抗滑穩定安全系數,改善堤身及的應力場,使在高水位作用下產生的不利於堤體安全的水平位移和豎向位移減小。對在後繼采動中可能造成的防材料的破壞進行了校核,結果表明材料是安全的。