滿應力梁 的英文怎麼說

中文拼音 [mǎnyīngliáng]
滿應力梁 英文
fully stressed beams
  • 滿 : Ⅰ形容詞1 (全部充實; 達到容量的極點) full; filled; packed 2 (滿足) satisfied; contented; conte...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. The behavior of capping beam that joints single rank of piles, which nowadays is widely applied to the construction in china, is complexly influenced by many factors. while conversed continuum beam pattern is primarily adopted in existent design methods to predigest computations, it still lacks of satisfaction as a result that it could n ' t reflect on the variance of piles and the infection of soil

    條形樁基連續承臺在我國現代建築工程中用極為廣泛,其受影響因素極為復雜,現行設計大多採用倒置的連續模式進行簡化計算,其無法考慮基樁的差異性以及地基土體對承臺的影響,計算結果難以令人滿意。
  2. The research shows that : 1 ) the ductility of the hsc bending members constructed is much greater than 5 ; 2 ) increasing the vertical links and distribution steel can increase the deflection under ultimate moment ; 3 ) with appropriate compressive bars, vertical links and distribution steel the increase of moment after yield and the decrease of moment under ultimate moment can be ignored, so the ductility of the hsc bending member is much larger ; 3 ) the width / depth ratio of hsc bending member has no obvious effect on the ultimate compressive strain of concrete ; 4 ) the method used here to calculate the deflection is applicable ; 5 ) the location of crack coincides with the location of vertical links and distribution steel ; 6 ) the bending property of the hsc structure under the blast load can meet the demand of protective engineering

    研究表明:本文研究的、板構件的延性比遠大於5 ;增加箍筋(鉤筋、分佈筋)含量,可以提高壓區混凝土剝落時的撓度;在適當的受壓筋、箍筋(鉤筋、分佈筋)含量下,可以忽略壓區混凝土剝落瞬間的承載下降,從而大大提高構件的延性;受彎構件的寬高比對壓區混凝土極限變的影響不明顯;受彎構件的裂縫間距受箍筋(鉤筋、分佈筋)的布置影響;文中所用的承載和變形計算方法是可行的。化爆試驗表明,高強混凝土構件的動載抗彎性能能夠滿足防護結構的要求。
  3. ( 3 ) it is known that load effect is not consistent with the section resistance incommon section continuous composite beam. a kind of composite beam with itsrational section size is suggested, which is consist of the t shape concrete beam andsteel girder. this kind of composite beam not only has enough carrying capacity, almost has same positive and negative resistance moment, but can decrease theamount of the steel

    ( 3 )分析可知連續組合的跨中、支座截面處荷載作用效及截面抗規律不匹配,本文提出了採用t形混凝土和工字鋼代替一般的混凝土板和工字鋼的組合截面形式,並給出了截面尺寸比例,能使正負截面抵抗矩接近,符合組合特徵,減少了材料用量,滿足承載和剛度等要求。
  4. In this thesis, aim to the beam axis shape be exactitude for design, the internal force of the beam be appeased by design request, the concept of modem cybernetics is applied, at the same time, the effecting parameter has collected. the paper build the ann model in predicting the beam camber an construction and discuss indetail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn. according to them, ann is applied in the construction control of prestressed concrete continuous bridge

    本文以大橋成橋線形滿足設計要求和成橋內控制在設計容許范圍內為目的,運用現代控制理論的思想,引用神經網路基本原理,詳細介紹bp神經網路的研究過程,從而建立預混凝土連續橋施工預拱度的神經網路模型,並詳細討論了模型的神經網路結點信息的提取,在工程實例的基礎上進行了數值計武漢理工大學碩士學位論文算,數值表明,將神經網路用於預混凝土連續橋施工控制,獲得了滿意的結果,在預混凝土連續橋施工控制技術研究方面,具有方便有效、精度高的優點,具有良好的用前景。
  5. The conclusion of reappearing analysis is that crane bridge be used as usual because main weld maximum stress of upper cover plate of main beam lower than yield limit though it higher than permissible stress. inner stress of secondary beam was over ultimate strength, and deforming is ultra big. so it was unfit for produce and secondary beam must be changed

    再現分析得出的主要結論為:橋架的主樑上蓋板主焊縫的最大超過了許用,但小於屈服極限,可以繼續投入使用;副內部的遠遠超過了強度極限,變形特別嚴重,不能滿足生產要求,因此更換新的副;端內部的超過了屈服極限,小於強度極限,在較大的位置焊接補強板;投入使用后,要對整個橋架進行定期檢查。
  6. Under present social economic condition, bridge design should satisfy criterions of design load and increase bearing capacity in order to strengthen service performance. these are contents of bridge structural optimization. diseases in superstructure make the life - span of bridges shortened

    在現今社會的經濟條件下,橋設計該在滿足現行《橋規》設計荷載標準的前提下,適當提高橋的承載能,增強其使用性能,而不是一味地強調造價最低,這就是橋結構優化的內涵。
  7. Some experts once suspected that the reserve pre - stresses in the lateral beams are not enough. in order to settle this problem, three construction schemes are analyzed comparatively. the results indicate that the pre - stresses in the lateral beam are acceptable and tensioning the reinforcements by two steps is the appropriate method both for the girder and the lateral beam

    針對這一問題,本文採用三種施工方案進行對比計算分析,結果表明橫隔中的預儲備是滿足要求的,而且金馬大橋採用的這種橫隔筋分批張拉的施工順序使該橋邊主及橫隔的受都較為合理。
  8. Now with oil, chemicals, power, shipping, coal, and other industries are developing rapidly, from not satisfied with the status quo of the company has with the relevant scientific research institutes, institutions of higher learning and the joint development of anti - corrosion experts to develop new products and train a large number of high - quality technical and management talent now, the public secretary of technologies and products not only be used for oil, gas pipelines, ships, docks, marine facilities, and other traditional applications industries, and is to increasingly broad new areas extend and expand, such as heat exchangers, heaters, bridges and high - rise buildings, such as the underground foundation

    目前隨著石油、化工、電、船舶、煤炭等各個行業的迅猛發展,本公司從不滿足現狀,先後同有關科研院所、大專院校及防腐專家聯合研製開發新產品,培養了一大批高素質的技術和管理人才,如今,公司的技術和產品不僅被用於油、氣輸送管道,船舶、碼頭、海洋設施等傳統用行業,而且正在向越來越廣泛的新的領域延伸和拓展,如換熱器、電熱水器、橋和高層建築的地下基礎等。
  9. Based on the test data of the crc beams taken from some chemical plants, which were mainly corroded by chloride, a calculation model was derived to calculate the ultimate load bearing capacity of such crc beams. then, bp nn model was built up to predict the ultimate load bearing capacity of crc beams. using such nn model to analyze many groups of test data ( under various corrosion cases ), satisfactory results are achieved

    基於目前較少開展的實際腐蝕環境下鋼筋混凝土構件受性能的試驗研究,通過引入受腐蝕混凝土和銹蝕鋼筋的損傷因子導出了受氯離子腐蝕鋼筋混凝土構件極限承載計算模型;建立了bp神經網路模型對受腐蝕鋼筋混凝土承載進行了預測,通過對多組國外試驗研究結果(不同腐蝕作用情況下)的分析均取得了令人滿意的預測結果,並且隨著試驗資料的積累,預測效果可以得到進一步的改善;因此,本文建立的神經網路模型對受腐蝕鋼筋混凝土構件承載研究是一種十分有效的方法,具有較好的用前景。
  10. The main problem won1d be whether tenslle stregth conld sallsfy the demand of truck - 20 and trailer - 100. after calculating internal forces. it is confirmed that the t - shaped beams with 16. 8m per span can meet the demand, while the ones with 22

    通過內計算,跨徑16 . 8mt能夠滿足新的荷載條件下的各項標準,跨徑22 . 2mt採用更換預鋼筋砼t方式解決。
  11. Considering the characteristics of internal force and structures of simply supported pc bridges, a novel automatically step - up method ( asum ), taking into account the influence of steel arrangement, steel ratio, stress losses of tendons and time - dependent concrete modulus, to analyze creep and shrinkage effects is presented. this method accepts all kinds of expressions of creep and shrinkage, and it is easy to calculate total stress, strain of concrete and steel and deflection of bridge at any time, the expected prediction accuracy will be obtained by further dividing the time - step within duration

    首先,針對預混凝土簡支橋的受特徵和構造特點,提出了徐變效分析的全量形式自動遞進法,可考慮截面上鋼筋位置、配筋率、預鋼筋鬆弛、混凝土彈性模量隨時間變化等影響,且計算式可適用於任何形式的收縮、徐變特性表達式;建立的公式可方便地求解任意時刻混凝土、鋼筋的變和跨中體的豎向變形,計算精度可方便地通過計算時段的細分來控制,直至給出滿意的結果。
  12. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋斜拉橋施工過程各狀態和成橋恆載狀態下,斜拉索索、主線形、主關鍵截面變、索塔塔頂水平偏位等關鍵項目的施工控制結果均滿足設計期望值的要求,滿足橋施工范圍的要求,大橋主線形流暢,斜拉索、主和索塔三大體系的受狀態合理,橋結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的基礎。
  13. ( 2 ) the properties of gfrp reinforced polymer concrete beams and prestressed polymer concrete beams are tested by four point bending experiments, the result show : gfrp rods can be satisfied the stiffness request ; it ' s very necessary and effective to use prestressed beam to minish the defection, enhance the crazed load and reduce the width of the cracks

    ( 2 )通過對gfrp筋增強樹脂混凝土普通和預進行四點彎曲實驗,表明:利用玻璃鋼筋作為增強筋在強度方面是可以滿足要求的;對玻璃鋼筋施加預來減小撓度,提高混凝土的開裂強度,以及縮小裂紋寬度是非常必要也是很有效的。
  14. The contents include as follows : the influencing factors of the displacement ductility factor of the unbonded partially prestressed concrete frame structures, such as stirrup reinforcement characteristic value, nominal shear span ratio, axial compression ratio, the appearing order of plastic hinges and partial prestressing ralio ( ppr ) are discussed. the formula of displacement ductility factor of the unbonded partially prestressed concrete frame structures is suggested by regression analysis. with regard to the aseismic design and the request of ductility and energy dissipation, the restriction of the flat - beam / column sectional size and aseismic reinforced design are discussed

    本文主要包括以下內容:討論了配箍特徵值、名義剪跨比、軸壓比、塑性鉸出現順序、預度等因素對無粘結部分預混凝土框架位移延性系數的影響,回歸了考慮影響因素的位移延性系數計算公式;對無粘結部分預混凝土扁框架結構,闡述了抗震設計對扁、柱截面尺寸的要求與限制;對滿足延性和耗能要求的無粘結部分預混凝土扁控制截面抗震配筋進行了探討;通過對無粘結部分預混凝土扁端的受分析,改進了以往扁端扭矩設計值計算公式。
  15. Abstract : this paper studies the sensitivities in the structural optimization of the sheet cover, including the stress sensitivity and the displacement sensitivity as well as the eigenvector sensitivity. the sensitivities are solved by the finite element method. a beam element and a plate element are used for the structural analysis of the sheet cover. some equations about the sensitivities are given out and are applied to the structural optimization of the sheet cover. the results prove to be satisfactory

    文摘:分析了在薄壁覆蓋件結構優化中敏度和位移敏度的計算方法,利用有限元法進行結構分析和敏度計算,推導出敏度的計算公式,並用於薄壁覆蓋件的結構優化設計,得到了滿意的結果.薄壁覆蓋件的有限元分析採用了板單元和單元,用實例的計算結果表明,敏度、位移敏度等的計算方法準確、可靠
  16. Taking beam with rectangular section as an example, the corresponding analytical solution of beam subjected to cosine distribution pressure is given through constructing the stress function satisfying all boundary conditions and biharmonic equation, which is a base of beam subjected to arbitrary distribution pressure

    摘要以矩形截面簡支為例,通過構造一個滿足所有邊界條件和雙調和方程的函數,給出了受餘弦分佈作用情況下相的解析解,這為求解受任意分佈壓作用下解的問題打下了基礎。
  17. A delaminated beam is divided into three areas and the displacement field of each area is a cubic function of the thickness coordinate. the continuity conditions of displacements and transverse shear stresses on the bonded interfaces, the delamination continuity on the debonded interfaces and the continuity conditions of displacements at the edges of debonded interfaces are assured

    脫層被分為3個區,各區位移場為厚度坐標的三次函數,能滿足層間位移和剪的連續條件、脫層界面的脫層條件和脫層邊界點的位移連續條件。
  18. Combined with that the influence of the prestressed tendon layout on mechanics characteristic of three - span prestressed concrete deck arch bridge is taken into account in these methods, and demand of internal force and displacement in design is satisfied by using upward and downward eccentric layout of prestressed tendon

    這些設計法針對該類橋型的特點,利用在拱頂中分別布置一定數量的上下偏心的預筋來優化結構的內滿足各部分的位移限制要求。
  19. In this paper, the method combined with curvature mode shape, finite element method ( fem ), artificial neural networks ( ann ) and genetic algorithms ( ga ) is applied. the optimization of a taper trunk beam of variable cross section under impact load can be obtained on the base of considering the objectives of minimum gross mass and the condition of constrain of dynamic stress

    本文採用了曲率模態、有限元、神經網路和遺傳演算法相互結合的方法,對承受沖擊載荷作用的變截面懸臂箱型,在動滿足材料許用的約束下,以質量最小為目標函數,做了優化設計方面的研究。
  20. To the prestressed concrete continues beam, considerable experiments have been finished and nice achievements have been acquired at chongqing jianzhu university ( renamed chongqing university since the year 2000 ) in these years

    對預連續,近年來重慶建築大學一做了大量的足尺構件的試驗研究,並取得了令人滿意的研究結果。
分享友人