滿重荷載 的英文怎麼說

中文拼音 [mǎnzhòngzǎi]
滿重荷載 英文
full weight load
  • 滿 : Ⅰ形容詞1 (全部充實; 達到容量的極點) full; filled; packed 2 (滿足) satisfied; contented; conte...
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 荷名詞(蓮) lotus
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. The rule of loads and settlement is concluded from numbers of settlement observation points ’ data. and in actual construction, this rule could be used to prevent immediate settlement under the accelerated load, and also, the serious result of the soil destruction could be avoided. at last, a proper method of settlement computing is derived from the identified rules, which can be used to guide the practical construction work, of course, meeting the compulsory standards of the settlement control well

    採用逆作法施工,現實地解決了樁、土與筏板接觸面的變形協調關系;通過對樁、土受過程的實際測試,得出了樁、土分擔比例和變化過程,從而為樁、土的計算提供實際依據;從設置的大量沉降觀測點中所得到的沉降資料,得出、沉降變化規律,從而指導在實際施工中,防止加過快而導致速沉,避免由此帶來的土體破壞的嚴後果;通過沉降規律分析,得出了適用於軟土地區的樁基沉降計算方法,用於指導實際施工,以滿足沉降控制的強制性標準。
  3. Its hysteretic curve is plumper, its ductility coefficient and energy dissipation capacity have been improved remarkably. the inclined staff of the steel bar truss has a restraining faction to the development of the crack, and the phenomena is that there has more crak and larger distributing area on the shear wall, which is an important token of the improved seismic capacity. concealed steel bar truss has the faction of increasing the height of plastic hinge area, which is another important token of

    研究結果表明:內藏鋼桁架高剪力墻與普通高剪力墻相比:屈服和極限均比顯著提高;屈服剛度明顯提高;其滯回環相對飽滿,延性系數及耗能能力顯著提高;內藏鋼桁架高剪力墻,其鋼桁架斜桿對裂縫發展有控製作用,現象是墻體上的裂縫較多、分佈域較廣,這是抗震耗能能力增強的要表徵;內藏鋼桁架高剪力墻有增大底部塑性耗能區域的作用,這是抗震耗能能力增強的另一要表徵;內藏鋼桁架還有顯著提高抵抗剪力墻基地剪切滑移能力的作用。
  4. Prospect photoelectric company insists on the management theory of creating future with sicene and technology, and the r d idea of cooperating, sharing, thinking and innovating all the time. we tye our best to satisfy customers all the technical demands, improve production technology content continuous, research and develop the production of advanced field. so our company has gained good public praise and our prouduction sells to all over the world. the prospect dtzziii type controller has provide accurate weighing for bailong sightseeing elevator in zhangjiajie, which is known as the first highest elevator in the world. and this type controller also has provided accurate explosion - proof weighing for shenzhou no. 5 airship launcher

    前景光電公司始終堅持「用科技創造未來」的經營理念和「協作共享思考創新」的研發理念,以滿足客戶一切技術要求,不斷提高產品的科技含量,持續研發儲蓄領域產品的市場觀,在電梯行業中取得了較好的口碑,產品行銷全國各地。本公司的電子式控制系統成功地為張家界百電梯世界第一梯和「神州五號」發射塔梯提供了精確的防爆稱
  5. The bridges are pivotal stronghold of the whole road. it becomes more and more popluar that some existing bridges betray multifarious structure damage and the limitations below the anticipative functions inevitably by reason of structure aging or vehicle load increasing or adverse environment or maintenance deficiency. lt results in not only the local bottleneck of the line and hidden trouble to the passing vehicle if the defective bridges are not duly maintained and reinforced. as a result, the bridge evaluation is specially important to the maintenance and strengthening. futhermore, we can not demolish and rebuild only but adop corresponding measures according ad temporal condition when the bridges are deemed to have defectiveness. so it accords with the situation of a country that the reinforcement and other upgrade measures aim at the bridge attention

    由於結構自然老化、車輛增加、不利環境影響以及養護維修欠缺,一部分橋梁不可避免地要暴露出各種結構損傷和既有橋梁不滿足規定功能要求的問題越來越普遍。如果這些技術狀況不佳的橋梁得不到及時的維修和加固,不僅會造成整條線路的局部瓶頸,而且還會對通行的車輛造成極大的隱患。因此,橋梁評估作為橋梁維修和加固的依據就顯得尤為要;此外出現了技術狀況不佳的橋梁應根據實際情況採取相應的措施,而不能僅僅採取拆除建的方法,因此加固和其他升級方法是目前比較符合中國國情的橋梁改造措施。
  6. ( 5 ) another is the long - term predict utilizing the biggest index number lyapunov in the chaotic time series and the whole space method during the steady period of the road foundation load, after the overload of the road foundation finished. meanwhile, contrasts with some mature settlement predict methods, estimating some important section in the engineering synthetically, making sure an ideal outcome of the predict warp, then unload the overload of road foundation and make it satisfy the design request

    ( 5 )路基超完成後,在路基穩定期間內,利用混沌時間序列中的最大lyapunov指數和全域法進行長期預測,同時與一些比較成熟的變形預測方法進行對比,對工程中一些點斷面進行綜合評判,確定一個較理想的預測結果,從而對路基超進行卸,使其滿足工程設計要求。
  7. This article guarded against explosions the heater to skid the block comprehensive support the structure to carry on the analysis ; found the question which this support structural design exists and has made the corresponding improvement design ; caused to synthesize the support the structure while to satisfy the intensity and rigidity reduced the whole weight ; tends to the optimized design in the material use ; through to synthesizes the support the finite element model to exert the different force of inertia ; obtains under the different load to synthesize the support stress variation rule, thus determine bearing capacity of comprehensive support

    摘要本文對防爆加熱器撬塊綜合支架的結構進行了分析,找到該支架結構設計上存在的問題並作了相應的改進設計,使得綜合支架的結構在滿足強度和剛度的同時減輕了整體的量,在材料的利用上趨于優化的設計;通過對綜合支架的有限元模型施加不同的慣性力,得出不同下綜合支架應力變化規律,從而確定出綜合支架所能承受的最大慣性力。
  8. For architectural requirements, residnces have many walls. as a result it is comparatively resonable that sub - high rise residences are frame - wall structures or shear wall structures we a1l know that shear wall structures have large sectional area and the capability of bearing vertical loads is respectively high. nevertheless, under seismic forces they have large inertia forces and small lateral displacemente

    由於傳統現澆鋼筋砼剪力墻結構的墻體截面積大,故承受豎向的能力比較容易滿足,但墻體的自、剛度大,在地震作用下慣性力大、側向位移很小,所以一般認為剪力墻結構延性差,屬于脆性結構。
分享友人