漏水的水帶 的英文怎麼說

中文拼音 [lóushuǐdeshuǐdài]
漏水的水帶 英文
leaky hose
  • : Ⅰ動詞1 (從孔或縫中滴下、透出或掉出) leak; drip 2 (泄漏) divulge; disclose; leak 3 (遺漏) le...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 4次方是 The fourth power of 2 is direction
  • 漏水 : drip
  1. Tell you, in fact, with the spring boxing gloves, oh, yes although boxing gloves, good to practice, the same can be used to attempt to play the ball game ejection oh

    告訴你,其實就是彈簧拳擊手套,呵呵,別看是拳擊手套,好好練練,一樣可以用來玩滴彈射球游戲哦!
  2. The new applications of survey are described in the fields of indicating underground advance, seeking out lossed ore deposit, discovering neotype deposit for detecting the gold deposit ; determining productive aquifer for looking for groundwater ; discovering fracturation zone controlling crop out of hot spring for developing the hot spring, and locating the position of ancient rock slide for prospecting the earth slide

    摘要綜述了應用輕便測量技術在地礦及地下尋找等方面一些新應用,例如:在金礦勘探中指導坑道掘進,找到了被遺礦體,發現了新礦化類型;在地下尋找中,確定了富層位;在溫泉開發中,探明了控制溫泉出露斷裂;在滑坡研究中,確定了古滑坡具體位置。
  3. In the joint of lg pex - a pipe, male xocket is pressed to a convex on the inserting part and the fastening ring will contract to fasten up the heating pipe by the fastening of outer nut, and there is also a convex on the ring to offer close coupling by mechanical re - press effect to prevent water from leaking in case of heat expansion

    在lg地熱管中連接部位不僅閥門管套插入部分凸起部位被機械作用壓密,而且隨著外部螺母被擰緊,使緊固環收縮,從而緊熱炕暖氣管,另外由於存在凸起部位,可通過機械作用進行再次壓密,因此可防止由於熱膨脹而引起
  4. A small leakage through an earth fill or hydraulic fill dam or its foundation removes some fine material in suspension.

    貫穿填土壩、力沖填壩或壩基一個細小孔隙以懸浮方式走一些細小土粒。
  5. Vertical double - wall steel tanks with liquid - based leak detection system, for the above ground storage of flammable and non - flammable water polluting liquids

    地上存儲易燃和不易燃污染液體液基滲檢測系
  6. Vertical double - wall steel tanks with vacuum - based leak detection system, for the above ground storage of flammable and non - flammable water polluting liquids

    地上存儲易燃和不易燃污染液體真空基滲檢測
  7. Measuring method on height of water flowing fractured zone using loses of drilling fluid

    裂縫高度鉆孔沖洗液失量觀測方法
  8. Water leakage from the reservoirs mainly follows the passage, which is formed by connection of the fracture structure outward extending with the strongly weathered zone

    外滲主要沿通往庫外斷裂構造與強風化連通形成通道滲
  9. Geberit floor drainers with traps for every application we have the right solution. for example floor drains with inlet funnel to be connected to other traps and metal grating

    對各類需求我們都能提供合理解決方案,如與其它存彎和金屬格柵直接連接。
  10. The numerical simulation and experimental research made on the characteristics of the clearance cavitations in kaplan turbine are described herein ; in which the analysis mainly is concentrated on the characteristics of leakage - vortex caused by the flow of the clearance between blade tip and blade chamber, that occurs at the front - pressure side of the blade, and the intensity of the secondary - flow - vortex ; furthermore, the relationship in between the leakage - vortex, secondary flow vortex, cavitations and erosion are analyzed as well

    摘要對軸流轉槳式輪機輪緣間隙流動及空化特性進行數值模擬和試驗研究,重點分析輪緣間隙流動在正面頭部泄流動所引起、二次流動漩渦強度和空化特性,以及泄旋轉、二次流動漩渦與空蝕和磨損之間關系。
  11. The millimeter has the largest frequency band and the highest velocity of communication, but it has the highest cost and technical defaults : multi - path effect, reflect and scatter caused by cloud, smoke, water - dropping, the buildings, the grounds and its shape, the interference caus ed by the thunder, the complexity of device, difficult maintenance, and so on. now the band of the leakage coaxial line is up to 3ghz, leakage coaxial line has some advantages : good adaptability to cloud, smoke, water - dropping, the buildings, the grounds and its shapes, good steady field, it has some technical defaults : lower resolution for location and measuring velocity, the more complex of its sending - receiving relay devices, weak anti - interference, the strict demand for the hole size in the line, the cleaner work environment and the higher cost

    毫米波具有最大寬和最高通信速率,但也有最高成本要求和較難克服技術問題,即傳播多徑效應,降、雲霧、地形、地貌、建築物等反射散射,打雷時嚴重干擾,設備復雜,維護困難等等;泄同軸電纜寬目前已做到3ghz ,具有對地形地貌建築物適應性強,場強穩定,但它定位測速精度低,它收發中繼設備較復雜,抗干擾能力低,電纜上開槽有著嚴格尺寸要求,工作環境要求清潔,成本較高;傳統無線感應技術具有結構簡單,成本低廉,維護方便,定位精度較高優點,但是,它沒有抗干擾能力。
  12. Over time landfills can be removed, especially those in hot climates, so as to stop leachate contamination of potential groundwater sources and to stop landfill gasses being released to atmosphere where methane is 23 times more harmful than carbon dioxide

    以後垃圾掩埋法將被淘汰(特別是在熱氣候中)以防止可能地下源滲液污染與沼氣釋放到大氣中,如果沼氣含量擴大23倍,則比二氧化碳危害更大。
  13. It rains a lot here ; so, this kind of multi - layered roof can prevent the rain from leaking into the house in the rainy season

    紹興屋頂瓦片有很多層,這可能跟氣候有關,江南一很多,厚屋頂可以防止雨進房子里去。
  14. Urinal traps floor drainers with traps

  15. Up to now, the drainage and waterproof system design of most railway tunnels in china did n ' t consider the action of external water load, based on the principle of unlimited drainage, so a great number of railway tunnels have the problem of leakage water, some of which are very serious

    到目前為止,我國大部分鐵路隧道防排設計主要按「無限制排」 、尚未考慮外荷載作用,按這樣原則設計隧道防排存在許多缺陷,有「十隧九說法,來了很多嚴重問題。
  16. In theory, any leakage or seepage in the sewerage system is important as it could allow droplets carrying contaminated sewage to be ejected into the lightwell

    理論上說,污排放系統任何滲均是嚴重,因為它會使病毒滴噴出天井。
分享友人