漏水試驗 的英文怎麼說

中文拼音 [lóushuǐshìyàn]
漏水試驗 英文
water loss test
  • : Ⅰ動詞1 (從孔或縫中滴下、透出或掉出) leak; drip 2 (泄漏) divulge; disclose; leak 3 (遺漏) le...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 漏水 : drip
  • 試驗 : trial; experiment; test
  1. Standard test method for hydrostatic leak testing

    壓泄的標準方法
  2. Energy consume, electric strength, insulation resistance, ground conductivity, leakage current, microwave leakage, power input, normal temperature, humidity treatment, glow wire, horizontal flame, vertical flame, tracking, ball pressure, rainproof, water splash, dustproof, salt fog, endurance, motor load test, cord flexing, cord pulling, pull & torque test, lamp replacement, construction check etc

    能耗、電氣強度、絕緣電阻、接地連續性、泄電流、微波泄、功率、溫升、濕熱、灼熱絲、平燃燒、垂直燃燒、電起痕、球壓、防雨淋、防濺、粉塵、鹽霧、耐久性(壽命)、電機負載、電源線彎折、電源線提拉、拉扭力測、燈頭互換性、安全結構檢查等。
  3. With regard to its field drilling applications in the geologically loose sandy pebble layers, kl vegetable - gum drilling fluid showed itself with excellent rheological behaviours in its abilities of lubrication, lost circulation, suspension and removal of debris, anti - shear shinning, and high coring rates, which satisfactorily meet the demands of geological boring in the dam foundation of huangjin ping hydroelectrical power plant

    通過在黃金坪電站壩基深厚砂卵石覆蓋層鉆探取芯的現場,證明了kl植物膠沖洗液具有優良的流變特性,潤滑、堵、懸浮排除巖屑和抗剪切稀釋能力顯著,可實現高取芯率,能很好的滿足地質鉆探對取芯質量的要求。
  4. Test results indicated : with the hoist of altitude, the increase of ice amount and the rise of pollutant, the average flashover voltage reduced. the character exponent generally depends on the insulator profile, ice amount, ice state and pollution severity etc. by means of a high - speed camera, a data acquisition system and high voltage test facilities, a series of the flashover processes on ice surfaces were record. the experimental results form this study and the subsequent theoretical analyses suggested : the thermal ionization of the air in front of an arc root resulted in arc movement ; the electrostatic force had an auxiliary effect of impelling arc propagation ; the electrical

    通過對攝像機、數據採集系統及高壓裝置記錄覆冰絕緣子表面閃絡電弧的發展過程的結果進行理論分析得出:弧根周圍空氣的熱電離導致了電弧的發展,靜電場力對電弧的發展起到了加速作用,電擊穿僅發生在閃絡最終的跳躍階段;通過測量閃絡過程中的放電電壓、泄電流、閃絡時間、覆冰電導率、電弧長度及電弧半徑等參數,得到了不同階段電弧(電弧起弧階段、電弧發展階段及完全閃絡)的發展速度、臨界電弧長度均隨覆冰電導率的增加而減小。
  5. The phenomena can be observed in the tests low seepage pressures can easily form passageways behind the waterproof layer if there is no drainage layer or the drainage layer is blocked in the single - shell test slab ; the waterproof layer can resist higher seepage pressure if there is no drainage layer or the drainage layer is blocked in the double - shell test slab ; the seepage water can be controlled and drained away in the drainage layer by the water proof layer only if there is unblocked drainage layer behind it in the double - shell test slab

    可見,在單層板中沒有排層或排層不通暢時,較低的壓就能在防膜后形成滲流通路;在雙層板中沒有排層或排層不通暢時,防膜能抵抗一定程度的滲壓;只有在雙層板中的排層暢通時,防膜才能有效地將滲控制在排層中排走。
  6. Based on many references form civil and abroad, the author mainly studies the measurment theory and method for flux, raising height, axial power and rotational velocity. avoiding many complicated and intermediate courses for power wastage analysis, introduces the electric measurement and using efficiency curve of motor in measureing axial power, and satisfies the automatization of the device. the paper also provides a new method, inductive winding, in measuring rotational velocity of electromotor, supplys limitations of other method in measuring rotational velocity of electromotor in water, and meet practical needs in developing diving electric pump for corporation

    作者在參閱大量國內外有關文獻,著重探討了泵流量、揚程、軸功率、轉速的測原理和測方法,提出了採用電測法並結合電機效率特性曲線測量泵軸功率,從而避免了損耗分析法中大量復雜的中間過程,滿足了裝置的自動化測量要求;採用磁感應線圈法測量電機轉速,彌補了其它轉速測量方法對下電機測的局限性,適應了萊恩公司開發潛電泵的實際需要。
  7. In the simulation of close water test, varied profiles of velocity of flow are obtained at different leakage location along the detected pipe, the variety values of the water level in the check well are acquired with time, consequently the location of the leakage can be judged

    在閉時,通過模擬沿管道長度方向上不同滲點的流速的變化,以及得出窨井出口處的位隨時間的變化值,來判斷管段中最有可能出現滲點的位置。
  8. By physical and chemical testing and comprehensive analysis, it is suggest that deposited sands and rubber relics lead to local clogging of the pipe, so vortex around the clog lead to erosion abrasion

    通過理化和綜合分析后認為,海中沉積的泥砂和管內橡膠殘片集結成一體,對傳熱管形成局部阻塞,流在阻塞物周圍產生渦流,發生沖蝕磨損,造成鈦管泄失效。
  9. The sample with low emitter efficiency has completed as the method of above. this lead to the greatly decrease of the reverse recovery time and the low reverse leakage and forward voltage, especially the excellent temperature character of the leakage. the test date shows that the samples reach the first class of international level

    本論文作者通過模擬測證了課題研究的理論設想,並設計製作了具有低陽極發射效率結構的高壓功率frd ,利用局域鉑摻雜和電子輻照相結合的壽命控制方式,實現器件反向恢復時間的極大減小,並且反向電流、軟度因子、正向壓降等關鍵參數也較理想,且具有極佳的電溫度特性,達到器件綜合性能的優良折衷,達到國際先進平。
  10. On the basis of anatomizing the condition of hydrogeology with zhongliang water resources and power engineering, combined with the data analysis of flux with surface water, aquatic chemistry, and experiment of tracing, the condition of karst leakage in the region of reservoir is educed. the concept of reservoir leakage with these information is put forward, the leakage quantity of karst water in the region of reservoir with the method of water equilibrium is applied

    在仔細分析中梁電工程庫區文地質條件的基礎上,結合地表測流資料、化學分析資料及示蹤連通資料,得出庫區巖溶滲條件,並在此基礎上提出庫滲概念模型,採用均衡法計算出庫區的巖溶量。
  11. Standard test method for water penetration and leakage through masonry

    磚石建築的滲入和滲的標準方法
  12. Rubber condoms - part 5 : testing for holes - water leak test

    橡膠避孕套.第5部分:孔的.
  13. Standard test methods for tensile strength characteristics of oil spill response boom

    油治理域攔油柵的抗拉強度特性的標準方法
  14. Standard test method for analytical procedure for analyzing the effects of partial penetration of control well and determining the horizontal and vertical hydraulic conductivity in a nonleaky confined aquifer

    控制井部分滲透效應分析和無泄封閉蓄層的平和垂直液力傳導性測定標準方法
  15. To avoid the pollution of groundwater resource and adjacent environment caused by drainage pipe leakage, current criterion in our country stipulates that there must be a pressurization test before drainage pipes are used

    為防止污管道滲而導致污外滲污染地下資源和周邊的環境,我國現行的規范規定,無壓管道在竣工交付使用之前必須進行管道的嚴密性
  16. Tests relating to pavements. surface drainage properties on pervious pavements. part 4 : measurement of surface flow on draining flooring with a constant loading permeater

    路面.滲路面的表層淺特性.第4部分:連續荷載滲器表面排量的測定
  17. Testing for holes - water leak test

    針孔漏水試驗方法
  18. Plastic piping systems - systems for hot and cold water - test method for leaktightness under vacuum

    塑料管道系統.熱和冷系統.真空滲方法
  19. We have further knowledge in the leakage rule according to the numerical simulation on close water test and close gas test of pipes with free - surface, which will provide useful reference for close water test and close gas test of pipes with free - surface in the future

    本文利通過對無壓管道閉氣和閉的數值模擬,對閉氣和閉時的滲規律有了進一步的認識,為今後無壓管道的閉和閉氣提供一定的參考。
  20. Plastics piping systems - end - load - bearing and non - end - load - bearing assemblies and joints for thermoplastics pressure piping - test method for long - term leaktightness under internal water pressure

    塑料管道系統.熱塑性壓力管道用端部承載及非端部承載組件和接頭.內部壓下長期防泄方法
分享友人