漸次的波動 的英文怎麼說

中文拼音 [jiāndedòng]
漸次的波動 英文
gradual fluctuation
  • : 漸副詞(逐步; 漸漸) gradually; by degrees
  • : Ⅰ名詞1 (次序; 等第) order; sequence 2 [書面語] (出外遠行時停留的處所) stopping place on a jou...
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ名詞1 (波浪) wave 2 [物理學] (振動傳播的過程) wave 3 (意外變化) an unexpected turn of even...
  • 漸次 : [書面語] (漸漸) gradually; one after another
  • 波動 : 1 (不穩定) undulate; fluctuate; unsettle; surge; rise and fall 2 [物理學] wave (motion); wave...
  1. The hydrauli c model of gradual dike - break simulates numerically the 2 - d flow of gradual dike - break waves. it shows the variation of flow field on breach, and the complicated flow characteristic of the propagation, diffraction, reflection and deformation of the dike - break waves. the hydraulic model can realistically simulate the burst process of dike, and computational accuracy is satisfied with the engineering demands

    本文建立逐潰堤水力模型首對二維逐潰堤問題進行了數值研究,揭示了逐潰堤過程中潰口處流場變化情況,以及潰堤傳播、繞射、反射及變形復雜運特徵,能較好地模擬實際工程中潰堤失事,模擬比較逼近於真實潰決過程,計算精度可滿足工程要求。
  2. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定來水來沙、邊界條件和海洋力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配過程來看:三角洲與濱海區泥沙沉積變化趨勢是基本一致,各部位泥沙沉積比例變化基本呈狀態,且三角洲與濱海區泥沙沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤因素主要集中在潮汐頂托、口門逐加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積影響進行了定量分析: (一扣根據實測資料首建立了河贖流路泥沙沉積分配回歸計算式,據此可以預估計算河口不同區域泥沙沉淤量; 、 5 )本項研究首論證了河口三角洲岸線態平衡概念,並建立了黃河河口來沙量與造陸面積相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于態平衡狀態重要結論; 『 6 )本項研究首提出了河口泥沙優化調控概念,並對其宏觀優化調控模式進行了初步探討。
  3. Based on the self - consistent nonlinear theory of complex cavity gyrotron with gradual transition, a simulation code of self - consistent nonlinear beam - wave interaction has been made, in which the multiple modes interaction with an electron beam and the mode coupling are taken into account. the interaction between the electron beam and hsn - h521 rf field for third - harmonic gyrotron is simulated. the influences of the thickness and the velocity spread and the velocity ratio of the electron beam and the fluctuation of the magnetic field and the technologic errors of complex cavity on the multi - modes interaction with an electron beam are analyzed

    二、在變復合腔迴旋管多模自洽非線性理論基礎上,編制了高變復合腔迴旋管多模注?互作用自洽非線性模擬軟體,並對8mm段三變結構復合腔迴旋管注? ?互作用進行了大量自洽非線性數值模擬計算與研究,進而分析了電子注厚度、速度零散、速度比值、磁場、腔體尺寸加工誤差等等多種因素對互作用效率影響。
分享友人