灌注壓力 的英文怎麼說
中文拼音 [guànzhùyālì]
灌注壓力
英文
injection pressure- 灌 : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
- 注 : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
- 壓 : 壓構詞成分。
- 力 : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
- 灌注 : pour into; priming; flood灌注機 bottler placer
-
Coronary perfusion pressure monitor
冠狀動脈灌注壓力監護儀Specially in which a bp artificial neural - network was used to recognize the sequential pressure signal of the dosing system and to identify its state
特別是,採用bp人工神經網路對灌注系統壓力波形進行識別,並從中得到灌注系統的故障狀態。Gin is the abbreviation for grouting intensity number. it is showed by the product of the final grouting pressure p ( unit : mpa ) on the grouting section and the grouting volume v ( unit : l / m ) on every one meter of the grouting section, which means the energy consumed on every one meter of grouting section. according to gin method, if during the grouting construction, same energy is consumed on every grouting section, i. e. gin keeps to be a constant, an approximately uniform impervious curtain can be obtained
Gin ( groutingintensitynumber )即灌漿強度值,它用灌漿孔段上最終的灌漿壓力p ( mpa )和單位灌漿段長度漿液灌注量v ( l / m )的乘積表示,其含義為單位灌漿段上消耗的能量, gin法灌漿認為在灌漿施工中,保持各灌漿孔段上消耗一致的能量,即保持gin為常數,便可形成一道大致均勻的防滲帷幕。Lastly, two conditions were simulated and computed by using the fem program : two pieces of joint and one piece of joint which have different depth, different grouting stress, different pressure on the ground surface, etc. and then some results were obtained about the relation of the grouting press, the lifting of the ground surface and the cosumptionof the injection grout
最後,依據所編的程序對不同埋深、不同灌漿壓力、不同壓重等的單條節理裂隙的灌漿情況和兩條節理裂隙的灌漿情況進行了模擬計算,得出了一些結論:灌漿壓力、地表抬動和注漿量之間的關系。Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating
箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。Specification for coupling dimensions for aero - engine refrigerant pressure replenishment connections
飛機發動機製冷劑壓力灌注接頭尺寸規范In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying
本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。The grouting test result shows that this technique of pile foundation construction is effective, it can not only increase the upper and skin friction of the cast - in - place pile, but also improve the bearing capacity of the cast - in - place pile, and gain a larger economic benefit for whole project at the same time
經樁端壓漿實驗結果表明,該技術可以增加鉆孔灌注樁樁端阻力和樁側壁摩阻力,是一項行之有效的樁基施工技術,它可有效提高鉆孔灌注樁的承載能力,同時提高經濟效益。By analyzing the several finished bridge projects, if the hollow pile foundation is adopted, we can economize subaqueous concrete consumption more than 40 per cents ; if the gr outed new technique of pile surroundings and pile toe is adopted, we can increase the load capacity 30 per cents than that of the replacement pile, and economize 20 per cents of the cost. it will show great and obvious economic and social benefits
已建多座橋梁工程採用樁周、樁底壓漿新工藝的比較分析表明,該工藝可使水下混凝土的用量節省40以上,且比傳統的鉆孔灌注樁可提高承載力30以上;節約造價20以上,具有顯著的經濟效益和社會效益。Railway transport equipment. tank wagons for carrying liquified gases under pressure and having bottom filling and emptying devices. maximum service pressure 40 bars. air orifice for gauging, degassing and testing
鐵路運輸設備.底部帶灌注和排放裝置的低壓液化氣罐車.最大壓力40bar .測量排氣和試驗用氣孔Applying high pressure grouting in concrete pile digged by hand
樁端壓力注漿在人工挖孔灌注樁中的應用Application of pile - end pressure grouting in artificial hole - digging grouting pile
樁端壓力注漿在人工挖孔灌注樁中的應用Applied to cast - in - situ pile, the technology of pressure grouting under pile ' s tip can increase pile ' s bearing capacity largely and the utilization ratio of material, and decrease its settlement. furthermore, this technique is better adaptable to various soil stratum and can make magnificent economic efficiency with simple facilities and construction method
樁端壓力灌漿技術用於灌注樁,能大幅度提高承載力,減小沉降,提高材料的利用率,並且設備簡單,施工工藝不復雜,經濟效益顯著,對各種地層有較好適應性。To ensure the charging pump working reliably, the following measures should be adopted : ( 1 ) adopting modified circular casing to reduce the radial force of the impeller and decrease the seal clearance ; ( 2 ) using radical ribs on impeller and helical sealing on shaft to realize minor pressure differential ; ( 3 ) using back pressure stuffing box to ensure sealing under small packing force ; ( 4 ) adopting self - lubricant flexible graphite stuffing for absorption of solids entering in the graphite in case of leaking
為確保灌注泵可靠工作,提出改進措施: ( 1 )採用改型環形泵體降低葉輪的徑向力,減小軸封間隙,抑制泄漏; ( 2 )採用背葉片降低葉片根部壓頭,獲得微壓,使軸封兩端承受較小壓差; ( 3 )採用螺旋密封降低軸封兩端壓差,在保持微壓的同時避免出現負壓,密封效果更好; ( 4 )採用反壓式填料密封結構,在很小的壓緊力下,即可保證密封; ( 5 )採用具有潤滑功效的柔性石墨填料,即使發生軸封泄漏,進入石墨內部的固相顆粒也將隨著石墨的消耗而被鉆井液吸收。In this paper, the rationality of construction plan of deep excavation and the efficiency of measures in the course of stake dug and water douched back during construction are all proved. also the problems which should be paid attention to during the period of design and construction are brought forward, which provide profitable experience for the future in similar engineering construction
論文論證了美荔園深基坑施工方案的合理性,施工中所採用的分批挖樁、壓力回灌等措施是有效的,並提出了設計和施工中需要注意的問題,為今後類似工程的建設提供了有益的經驗。This pressure must be under control, and we control it by means of the mud which we circulate down the drill pipe
這種壓力必須加以控制,而且我們控制壓力的方法是把泥漿灌注到鉆管中去。Someone think it must use permeating theory to design, the others think it must use permeating theory to design. the building ministry made out the working standard of the later pressure grouting of pour pile, but it stand at the industry standard, is n ' t enough perfect and comprehensive. in this paper, the author put forward the design principle by analyzing the reasons that affect the bear load ability of the drilling hole pour pile and the principle that improve the bear load ability of single pile by later pressure grouting, put forward th e working technology and requirement of check before acceptance by analyzing and summarizing several models such as the chinese railway 11 office residential high building
本文通過分析影響鉆孔灌注樁承載力的因素以及鉆孔灌注樁后壓漿提高單樁承載力的機理提出了設計計算的原則;通過中鐵十一局高層住宅樓鉆孔灌注樁低壓力后壓漿工程對6根樁的壓漿對比試驗及鉆探揭露確定了低壓力后壓漿所適用設計理論和方法;確定了低壓力后壓漿的壓漿壓力、壓漿量等參數;經過實驗及經驗總結確定了壓漿材料的選取原則及方法,列出了低壓力后壓漿在不同土層適用的壓漿材料。Effect of different infusion volume on hemodynamics of portal hypertension canines after hemorrhagic shock
不同靜脈灌注量對門靜脈高壓失血性休克犬血流動力學的影響Abstract : based on the in - situ pressure - grouting experiments and the full - scale pile tests of xinxiang and ligou and yangzhou bridges, the process and effect of jet pressure - grouting are presented in this paper. the mechanism of increasing the performance of bored piles by grouting is also analyzed. an engineering experience of applying the new technique is presented in the paper
文摘:根據新鄉、鞏縣及揚州等地鉆孔灌注樁樁底壓力灌漿現場試驗和樁的靜載試驗,介紹了樁底壓力灌漿的工藝及壓力灌漿的效果,並對壓力灌漿提高鉆孔灌注樁承載力的機理進行了分析,對其推廣應用作了介紹。The drilling hole pour pile technique has been wide - ranging used in the high buildings " foundation and base of the wide span construction and base of bearing weighty load construction, but the geology conditions that surrounding the pile are differ in thousands of ways, extraordinary, the soil there is small opening and it can be compressed and the bottom of the pile ' s hole there is much more dregs, so many confuse reasons ca n ' t be computed weaken the pile ' s ability of bear load
鉆孔灌注樁施工技術在高層建築、大跨度、大承載力的基礎工程中得到了廣泛的應用,但是,地層土壤存在孔隙、土壤具有可壓縮性、孔底存在沉渣等許多不可明確計算的因素,使樁的承載力存在不同程度的削弱,實際承載力與設計值有較大出入。分享友人