灌注壓 的英文怎麼說
中文拼音 [guànzhùyā]
灌注壓
英文
ppa pulmonary artery pressure-
The developing about the ventricle of leading to flow and perfusion in automatism controlling to pressure svstem
腦室引流和灌注的自動控壓系統的研製Maintain normal cerebral perfusion pressure by avoiding hypotension and cerebral retraction
維持正常腦灌注壓。Coronary perfusion pressure monitor
冠狀動脈灌注壓力監護儀Accident case of under water board cast - in - situ pile as well as the analysis of static pressure settlement method
水下鉆孔灌注樁事故實例及靜壓法處理方法分析Specially in which a bp artificial neural - network was used to recognize the sequential pressure signal of the dosing system and to identify its state
特別是,採用bp人工神經網路對灌注系統壓力波形進行識別,並從中得到灌注系統的故障狀態。Correlation between radionuclide pulmonary perfusion imaging and lung biopsy in severe pulmonary hypertension caused by congenital heart defects in young children
小兒先心病重度肺高壓的核素肺灌注顯像與肺活檢對比研究Based on the analysis of problems of previous bridge bearings after installation, for installation of the bearings of lhasa river bridge, the construction method of grouting epoxy resin mortar into anchor bolt holes of a bearing with the aid of potential energy of base plates of the bearing is used
摘要結合分析以往橋梁支座施工后留下的隱患,拉薩河特大橋支座採用錨栓孔灌注環氧樹脂砂漿,底板位能壓漿的安裝方法。Gin is the abbreviation for grouting intensity number. it is showed by the product of the final grouting pressure p ( unit : mpa ) on the grouting section and the grouting volume v ( unit : l / m ) on every one meter of the grouting section, which means the energy consumed on every one meter of grouting section. according to gin method, if during the grouting construction, same energy is consumed on every grouting section, i. e. gin keeps to be a constant, an approximately uniform impervious curtain can be obtained
Gin ( groutingintensitynumber )即灌漿強度值,它用灌漿孔段上最終的灌漿壓力p ( mpa )和單位灌漿段長度漿液灌注量v ( l / m )的乘積表示,其含義為單位灌漿段上消耗的能量, gin法灌漿認為在灌漿施工中,保持各灌漿孔段上消耗一致的能量,即保持gin為常數,便可形成一道大致均勻的防滲帷幕。Lastly, two conditions were simulated and computed by using the fem program : two pieces of joint and one piece of joint which have different depth, different grouting stress, different pressure on the ground surface, etc. and then some results were obtained about the relation of the grouting press, the lifting of the ground surface and the cosumptionof the injection grout
最後,依據所編的程序對不同埋深、不同灌漿壓力、不同壓重等的單條節理裂隙的灌漿情況和兩條節理裂隙的灌漿情況進行了模擬計算,得出了一些結論:灌漿壓力、地表抬動和注漿量之間的關系。Three separately managed and marketed companies that manufacture coil processing equipment, ashphalt shingle and paving machinery, and metalforming machines for shaping hollow cylindrical blanks. site incorporates links to detailed information about each company and its products
-生產聚氨酯設備,產品包括聚氨酯鞋底成型機聚氨酯連幫成型機聚氨酯高壓發泡機聚氨酯低壓發泡機聚氨酯彈性體灌注機聚氨酯精密灌膠機聚氨酯澆注機聚氨酯發泡機組及聚氨酯生產線等。( 2 ) using both upper and lower limbs of a fresh adult cadaver, inject red gelatin into femoral, forward and backward injecting the blue gelatin with high pressure into femoral vein with formalin preventing rot
( 2 )採用新鮮成人屍體上、下肢標本,于股動脈灌注紅色乳膠,足背靜脈網順、逆行及股靜脈加壓灌注藍色乳膠,福爾馬林溶液防腐。Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating
箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。Specification for coupling dimensions for aero - engine refrigerant pressure replenishment connections
飛機發動機製冷劑壓力灌注接頭尺寸規范In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying
本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。The grouting test result shows that this technique of pile foundation construction is effective, it can not only increase the upper and skin friction of the cast - in - place pile, but also improve the bearing capacity of the cast - in - place pile, and gain a larger economic benefit for whole project at the same time
經樁端壓漿實驗結果表明,該技術可以增加鉆孔灌注樁樁端阻力和樁側壁摩阻力,是一項行之有效的樁基施工技術,它可有效提高鉆孔灌注樁的承載能力,同時提高經濟效益。By analyzing the several finished bridge projects, if the hollow pile foundation is adopted, we can economize subaqueous concrete consumption more than 40 per cents ; if the gr outed new technique of pile surroundings and pile toe is adopted, we can increase the load capacity 30 per cents than that of the replacement pile, and economize 20 per cents of the cost. it will show great and obvious economic and social benefits
已建多座橋梁工程採用樁周、樁底壓漿新工藝的比較分析表明,該工藝可使水下混凝土的用量節省40以上,且比傳統的鉆孔灌注樁可提高承載力30以上;節約造價20以上,具有顯著的經濟效益和社會效益。Railway transport equipment. tank wagons for carrying liquified gases under pressure and having bottom filling and emptying devices. maximum service pressure 40 bars. air orifice for gauging, degassing and testing
鐵路運輸設備.底部帶灌注和排放裝置的低壓液化氣罐車.最大壓力40bar .測量排氣和試驗用氣孔Technical improvement of chronic infusion of drugs intothe guinea pig cocmea by an osmotic pump
豚鼠耳蝸微滲透壓泵慢性灌注技術的改進Applying high pressure grouting in concrete pile digged by hand
樁端壓力注漿在人工挖孔灌注樁中的應用The cerebral vasospasm is the main complication caused by subarachnoid hemorrhage, and may induce the elevation of the intracranial pressure, decrease of the cerebral blood flow and even death
摘要蛛網膜下腔出血的主要並發癥是腦血管痙攣,腦血管痙攣可引起顱內壓升高、腦血流降低和腦灌注壓降低,甚至死亡。分享友人