焊縫線 的英文怎麼說

中文拼音 [hànféngxiàn]
焊縫線 英文
weld line
  • : 動詞(用熔化的金屬修補金屬器物或使金屬工件連接起來) weld; solder
  • : 縫名詞1. (接合處) seam 2. (縫隙) crack; crevice; fissure; slit
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 縫線 : closing thread
  1. Long rails in jointless track are usually made on welded rail site or in railway welded rail factory

    摘要無路長鋼軌道常由鐵路軌廠或現場軌基地接。
  2. Idea of differential plane is introduced in the calculation of orientation of normal line, and optimal orientation for electron gun is obtained. this work is helpful for guaranteeing welding quality

    在法姿態的計算中,引入微分平面的設計思想,獲得了接過程中的最佳姿態,保證了質量。
  3. Radiographic inspection of welds for pwr fuel rods

    壓水堆燃料棒x射照相檢驗方法
  4. The welding technology of francis turbine runners is optimized from the view of subsection welding and local heating by numerical simulation. the result shows that welding residual tensile stress appears in the weld and its area nearby, and peak stress appears in the dangerous area of blades after practising quondam welding technology ; welding residual tensile peak stress in the dangerous area of blades can be decreased by welding both ends earlier and then welding middle section later during subsection welding, and decreasing effect on welding residual stress of the subsection welding is related to the weld length of blade outlets and welding direction of each subsection ; decreasing effect on residual stress of the local heating is direct proportional to heating time, heating temperature, heating area, and inversely proportional to cooling area, and welding residual tensile peak stress in the dangerous area is decreasing trend earlier, and then increasing trend later with heated location increased

    本文利用數值模擬手段對轉輪的接工藝從分段和局部加熱兩個方面進行了優化,結果表明:採用普通工藝接時,葉片后殘余拉應力出現在及其附近區域,並且在葉片出水邊的熔合附近(危險區域)出現了峰值;在採用優化的分段時,先兩端后中間的方法可以降低葉片危險區域的接殘余拉應力峰值,降低效果與葉片出水邊段長度、各段的接方向有關;局部加熱法降低轉輪危險區域殘余應力的效果主要與加熱時間、加熱溫度以及加熱面積成正比,與冷卻面積成反比,並且危險區域的殘余應力隨加熱區域的增大呈先降低后升高的趨勢。
  5. Method of x - ray radioscopy for butt - weld

    對接x射實時成像檢測法
  6. Based on the 3d geometry vision, using java3d, for each of worktable and sine welding seam part of sheet, the ve modeling experiments achieve the construct of macrostructure, security virtual thickness and virtual guide based on error, and accomplish the space restriction of robot running. via the structured laser sensor ’ s getting three - dimension information, the experiments achieve the modeling of sine welding seam part of sheet by using programming

    在立體視覺傳感系統獲得三維信息的基礎上,利用java3d建模技術,分別對工作臺、薄板正弦曲工件進行建模實驗,完成了虛擬環境中宏觀環境模型的建立,並根據誤差建立了安全虛擬厚度和虛擬向導,完成了對機器人運動的空間約束;通過結構光傳感器獲得三維信息,編程實現對薄板正弦曲模型的建立。
  7. Inductotherm group china - thermatool shanghai is a sister company of thermatool group, has more than 50 years experience in designing and manufacturing hf welders, seam annealers, tube / pipe inline bring / dull annealers ( stainless steel, carbon steel, etc. ), tube / pipe form mill and relevant spare parts. as the leading supplier of welders and seam annealers in the world, thermatool has provided wide range of welders and seam annealers to pipe and tube industries

    應達工業(上海)有限公司色瑪圖爾分公司和美國色瑪圖爾公司是姊妹公司,同屬美國應達工業集團,具有50多年專業生產製造高、中頻機,退火設備,管材(碳鋼、不銹鋼)在光亮/暗退火裝置,管成型機組及其附件的豐富經驗,為世界上眾多的行業提供了相應的專業化設備,同時也是世界上最大的高頻機和熱處理設備的製造商。
  8. Abstract : by a discussion on k value, the radiographic technology for thebutt welds in standard elliptic sealing heads consistent with current standards and regulations is presented

    文摘:圍繞k值展開討論,提出一種符合現行標準、規程要求的標準橢圓封頭拼接的射探傷工藝。
  9. 436 the welds passed the examination of radiographic test ( ultrasonic inspection, magnetic testing )

    通過射透視檢查(超聲波探傷、磁力探傷)合格。
  10. The variable polarity power supply circuit uses two stages full - bridge inverter, the former inverter is regarded as a constant - current source with fast dynamic response, and supplys energy for the second one, and the latter one is to produce variable polarity current excellently, and low - frequency pulse current by variable polarity power supply is used to reduce input energy and control the shape of weld bead while welding. a series of high - frequency pulse current is superposed on direct - current - electrode - negative ( dcen ) current through the high - frequency pulse power supply, which is used to compress the arc and improve process of crystallization

    其中變極性電源採用二次全橋逆變結構,一次逆變提供快速的響應速率並給二次逆變提供能量,二次逆變提供良好的變極性性能,使輸出能量最優化,並用其低頻電流特性減小電弧能量,控制成形;高頻脈沖電源提供的高頻電流疊加在反極性電流dcen上,利用電流的高頻特性壓縮電弧,改善金屬結晶過程。
  11. The results of the experiments show that the ti3al - tcll dual alloys, by vacuum - electron - beam weld, hot die forging and 680c / 12h, ac, heat treatments, have satisfied synthesis properties of intensity, plasticity, hardness. and also it is the feasiblie way. this will establish the supporting technology for the manufacture of the compress disk in the areoengine

    實驗結果表明,經真空電子束接ti _ 3al ? tc11雙合金經過熱模鍛造和680 12h , ac或815 1h + 700 8h , ac熱處理后,接區組織過渡均勻,可以使得處強度在室溫拉伸時高於ti _ 3al ,而在600拉伸時高於tc11合金,獲得強度、塑性、硬度均令人滿意的綜合性能,且是一條可行的工藝路
  12. Probe into ring - welding strengthening for gas transmission pipeline without interruption of gas flow

    關于輸氣管不停輸情況下環補強問題的探討
  13. The relations between the dummy stress amplitude and fatigue life can be easily developed. and then, the bhw - 35 steel fatigue design curve can be obtained according with asme criterion and bs5500 criterion. compared ~ vith the design curves provided by the asme and bs5500 criterion, the curve got in this paper provides reliable direction for the fatigue design of boiler drum, which used on the altering generating power plant set

    材料的虛擬應力幅與壽命關系,按照asme和bs5500規范的方法分析得到bhw ? 35鋼疲勞設計曲,並與asme和bs5500規范中的設計曲進行比較,為我國調峰機組410t / h鍋爐汽包疲勞設計提供可靠的實際依據。
  14. According to the engineering experiences obtained from the laying of a jointless track of high - speed communication line - line 3 in dalian city, this paper introduces in general the laying technology, particularly the long rail welding, the construction site welding, seamless track spreading and trak controller laying, and discusses problems often occuring in long rail wedling and seamless track laying

    摘要根據大連市快速軌道交通3號一次性鋪設碎石道床無路的工程實踐,介紹了長鋼軌基地接、單元軌節的工地接;無路鎖定和鋼軌伸縮調節器的鋪設等技術,並對長鋼軌接和無路鋪設中應注意的問題進行了探討。
  15. At least five ( 5 ) percent of the welds are 100 percent radiographed or ultrasonically examined

    至少5 %的進行100 %射透照或超聲檢測。
  16. At least five percent of the welds shall be 100 percent radiographed or ultrasonically examined

    至少5 %的進行100 %射透照或超聲檢測。
  17. The application is not pressure retaining welds for pressure vessels or heat exchangers, unless such welds are fully radiographed or ultrasonically tested

    此方法不能用於壓力容器或換熱器受壓部件的接,除非進行100 %射透照或超聲檢測。
  18. Specially suitable for zinc patching of weld seam in tube welding line, and capacitor spray

    本套設備適合於高頻管生產上進行的補鋅及電容噴塗。
  19. Minimal the tendency of microcracks can be obtained by improving the shape of weld pool and enhancing the welding energy input

    通過改善成形和提高能量有助於減小兩類熱影響區微裂紋傾向。
  20. Non - destructive testing of steel tubes - part 10 : radiographic testing of the weld seam of automatic fusion arc welded steel tubes for the detection of imperfections

    鋼管的無損檢驗.第10部分:檢測缺陷用自動電弧鋼管的x射照相檢驗
分享友人