無排水設施的 的英文怎麼說
中文拼音 [wúbèishuǐshèshīde]
無排水設施的
英文
undrained- 無 : 無Ⅰ動詞(沒有) not have; there is not; be without Ⅱ名詞1 (沒有) nothing; nil 2 (姓氏) a surn...
- 排 : 排構詞成分。
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 設 : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 的 : 4次方是 The fourth power of 2 is direction
- 排水 : drain off water; drain away water; dewatering
- 設施 : installation; facilities
-
Immovable obstructions is such as car path 、 cover of sewer and paving road, the player must life the ball and drop it within one club length without penalty, but not near the hole
無法移動之妨礙物,如:球車道、噴灌排水井蓋、路梯等設施,可以在不更靠近果嶺一方的一桿范圍之內拋球,不罰桿。To begin with, most of hong kong s sewage and wastewater ended up in the sea, but the bulk of it had received little or no treatment before discharge due to the lack of a developed sewer network and treatment facilities at that time. this led to rises in organic and inorganic pollutants, a reduction in the oxygen content of the water, and increased bacteria levels
城市的生活污水和工業廢水一般均排入大海,但由於當時污水系統及處理設施並不完善,大部分污水只經過初步處理或甚至未經處理便予以排放,導致海水中有機和無機污染物不斷增加,含氧量下降和細菌水平上升。To further minimise the problem caused by wastewater found in the communal drains, the drainage services department had installed a dry - weather flow interceptor in the section of the underground communal drainage system around the intersection of dundas street and portland street. during dry weather, the interceptor can intercept the wastewater discharged into the communal drainage system and divert it back to the communal sewerage system
為進一步減低流入公用排水渠的污水所造成的問題,渠務署亦已於登打士街和?蘭街交界的地下公用排水系統設置旱流污水截流設施,在無雨的時候將排放到公用排水系統中的污水引回公用污水系統。Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china
簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例As far as the lists of urban engineering layout are considered, city general planning, district planning and detailed local planning all include the related contents of city infrastructures planning. in the recent years, some cities have commenced to compile the special planning such as " city transportation planning ", " water drainage works planning ", etc., but considering the contents, deepness and expressional method they still should be ranked in general planning. they mainly control macroscopically and reveal the aspects of large - scale establishments, construction standards and framework
就市政工程規劃的序列而言,城市總體規劃、分區規劃、城市局部地區詳細規劃都包含了市政基礎設施規劃的有關內容,近年來,一些城市著手編制了諸如「城市道路交通規劃」 、 「排水工程規劃」等專業規劃,但其內容深度及表達形式仍屬總體規劃的序列,主要是對一些大型設施、建設標準、布局結構方面的宏觀控制和展現,其成果圖紙多為1 /萬以上比例,其內容深度難以直接作為設計和建設的依據,控制性詳細規劃或修建性詳細規劃層面的市政基礎設施規劃在內容深度上已具有了一定的可操作性,但其多為局部地段的規劃,無法保證市政設施整體性、系統性要求。分享友人