無載位置 的英文怎麼說

中文拼音 [zǎiwèizhì]
無載位置 英文
no-load position
  • : 無Ⅰ動詞(沒有) not have; there is not; be without Ⅱ名詞1 (沒有) nothing; nil 2 (姓氏) a surn...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  1. Because uav is smaller and lighter than normal plane, the miniature aerial rs system is easily effected by wind, its " stabilities of position and stance are not good. because the load of uav is so finite, the large professional aerial photogrammetry camera can not be installed

    微型人機遙感由於受到人機平臺體積小、重量輕、任務荷有限等因素的制約,在飛行作業中傳感器和姿態受氣流影響大、穩定性差,而且目前是非專業攝影機成像,這些都大大增加了其影像幾何糾正處理的復雜性。
  2. In the positioning servo - system, which generally is configured by the d. c. pulse width modulator ( pwm ) velocity governing system and position servo - loop, the parameter perturbance of pwm velocity loop really exist by reason of such as the load behavior ; power voltage supply ; operating setting value, etc. 1, 2 , and it cannot be ignored. by using the identification technique to form the mathematical model of the system, authors have confirmed the facts. therefore, to design the discrete sliding mode controller ( dsmc ) of the positioning servo - system, the perturbed parameters value bounds of the pwm velocity loop, which is as the controlled plant of position servo - loop, should be accounted. consequently, the design principle of dsmc for accounting system with parameter perturbance is proposed by the authors. the proposed method can ensure the stability of system with parameter perturbance and the behavior of non - overshoot, fast precise positioning. in order to reveal the effects of the design method, the comparative research work is done by the authors. also, it has been tested in an industrial experiment, the results proved it is satisfactory

    由直流脈寬調速系統( pwm )和環構成的定系統中,速度環的參數隨負特性;電網電壓;給定工況而攝動是不容忽視的.作者通過系統辨識建模也證實了這一事實1 , 2 .因此在設計環的離散滑模控制時,必須針對速度環(即環的控制對象)的參數攝動范圍採用「對象參數攝動離散滑模控制器的設計方法」 ,以確保系統在參數攝動時的穩定性和快速、超調、準確定的優良動態品質.為剖析該設計方法的控制效果,本文作了對比性研究,並將該設計方法用於工業試驗中,取得了滿意的結果
  3. Problems occured in the anchoring of overhung tourist hall on top of the tv tower and tower drum due to construction mistakes. it was introduced in this paper that two non - binding prestressed girder beams are respectively set in corresponding locations as the anchor beam of overhung radial support beam of tourist hall, thus the integrity of the tower drum and transmission of the load were guaranteed

    由於施工失誤,作為電視塔頂的外懸游覽廳和塔筒間的錨固發生了問題,本文介紹了採用在相應兩根粘結預應力大樑分別作為游覽廳屋面和樓面徑向懸挑支承梁的錨固梁,確保了它和塔筒的整體性和荷的傳遞。
  4. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  5. Compared with currently fire control system, apsse has such characteristic as : highly precision, complex construction, high technique, etc. so this thesis expatiated in detail on the measuring theory of apsse, emphases on the discussion of system error and random error of apsse, deduced the three axis error of apsse usign the coordination transformation methods, provided the applying base for the measuring error equation of apsse. in this paper, we emphases on expatiating the basic theory of usign space coordination transformation in the measuring error equation of apsse

    因此,論文採用了空間坐標變換方法分析機光電跟蹤測量設備在對目標進行測量、定時空間坐標轉換關系,推導出從中心地平坐標繫到目標坐標系的變換矩陣,在此基礎上首先建立機光電跟蹤測量設備的測量誤差的傳遞方程和機光電跟蹤測量設備的含有測量誤差的傳遞方程,為利用蒙特卡洛法分析機光電跟蹤測量設備的測量誤差奠定了理論基礎。
  6. Code that is position independent can be loaded more quickly than code that is position dependent, if the image cannot be loaded at its preferred address, because relative addresses in position independent code are not patched if the image is loaded at an address other than its preferred address

    如果映像法在其首選地址加,由於在首選地址之外的其他地址加映像時,與關的代碼中的相對地址不需要進行修正,所以與關的代碼比相關代碼加得更快。
  7. In order to ensure the whole system operate economically, power department equip transformer with onload tap changer and shunt capacitors for most distribution substations, according to the operating condition, adjusting the position of transformer taps and capacitors can control the variation of voltage and reactive power exchanger of distribution substations and power system in certain extent

    為確保整個系統運行經濟性,降低網損,電力部門在大多數變電站配了有調壓變壓器和並聯補償電容器組,根據運行情況適當調節變壓器分接頭的和投切並聯補償電容器組,可以降低電壓變化和變電站與系統的功交換控制在一定的范圍內,確保供電質量和電網運行的經濟性。
  8. There are two different constitution forms for the square tubes with ribs in the test specimens, one consists of two welded channels with stiffening lips ( channel tubes ), stiffening lips ( angle tubes )

    根據肋、單向設斜肋和雙向設斜肋3種截面形式、 2種截面尺寸的18個薄壁鋼管混凝土軸壓短柱試驗結果,比較和分析了各試件的試驗現象、破壞模式及荷移曲線等。
  9. The structure bearing capacity of the hierarchy scaffold may cause certain difference by shifting its joint positions, altering its scaffold layers and choosing erect modes of whether false sway rods are used or how many ones are used

    還原翻譯:系統鷹架的結構承力因不同架設會出現一定差異,如接頭的改變、鷹架層數的更改和架設方式的選擇,架設方式指有假設斜桿和幾根斜桿。
  10. This paper mainly discusses a control method of substation voltage and reactive power. in order to get suitable decision for one day 24 hours tap - transformer ' s step switch and shunt capacitor switch, an approach of substation voltage and reactive power control on the basis of the combination of artificial neural network ( ann ) reactive power forecasting and evolutionary programming optimal decision - making is put forward

    論文主要研究變電站的電壓/功控制決策問題,為了確定一天24小時內合適的有調壓變壓器分接頭和並聯電容器投切狀態,提出一種基於人工神經網路的功負荷預測和進化規劃優化決策相結合的變電站電壓和功的綜合控制決策。
  11. The multi - purpose tester developed here is aim at testing the mechanics performance of the brittle material, which bases on modular design thought, it contains several modules as the machinery load component, platform of supporting, the function modules and the software system, they can be combined in different function modules to satisfies the need of different application situation. the tester can be used to measure not only general material properties such as elastic modulus, ultimate strain, strength, hardness and toughness, fatigue properties but also various special properties such as the local strength, and surface residual stress at the different location of the brittle component with non - destructive methods. thus the security and reliability of the brittle component can be evaluated and predicted

    本文基於模塊化設計思想,研製了一臺專門針對脆性材料力學性能測試的多功能脆性材料試驗儀,其主要包括機械加模塊、支撐平臺、功能模塊、測控系統、軟體系統等模塊,通過對這些模塊的不同組合可實現不同的功能及滿足不同應用場合要求;系統除了具有測試脆性材料的彈性模量、極限應變、強度、硬度、韌性等常規性能外,還具有損測試玻璃構件不同的局部強度和表面預應力,進而對玻璃構件的安全可靠性和壽命進行預測等功能。
  12. We can ' t give exact numbers for weapons dimensions, as it ' s clearly depending on the type of s / s and the hardpoint location

    我們法在武器尺寸上給出一個確定的數字,因為這取決于飛船/空間站的類型和掛點的
  13. In modem war, a precise orientation and emendation system applied to artillery spying is needed, existing orientation and emendation system usually computes position of object according uav ( unmanned air vehicle ) ' s position and pose and the pose of vidicon on uav, but orientation is n ' t enough precise

    現代戰爭中需要高精度的炮兵偵察定校射系統,然而現有的定校射系統通常是根據人機的、姿態信息和機攝像機的姿態信息來估計目標區域的,定精度不高。
  14. The traditional static location area scheme used in the location updating procedure of mobile communications has many problems, such as lack of flexibility, ms oscillating between la borders, focused signaling load on border cells, etc. in this paper we present a new adaptive location updating scheme, which can solve the above problems, and can change easily to other la schemes. the scheme uses multi - level las, selected according to single ms s mobility and call characteristics, to make the best tradeoff between wireless signaling cost of location updating and paging

    在移動通信的更新過程中,傳統的靜態區方案存在著缺乏變化的靈活性、邊界振蕩、信令負過于集中問題,本文提出了一種新的自適應更新方案,採用不同級別的區,區的選擇根據移動臺當時的移動和呼叫情況,按照使更新和尋呼的線信令總代價最小的原則確定.該方案可有效地解決靜態區的各種問題,並能方便地與其它區方案切換
  15. Only sufficient number of measured points is needed to satisfy the identification precision of to identify the ratio of the orthogonal polynomials, and there is no special limit on th positions of measuered points

    該方法只須獲取足夠的測量點的響應來識別分佈荷正交多項式的系數,滿足識別的精度要求,同時對測量點的特殊限制。
分享友人