現場勘察 的英文怎麼說

中文拼音 [xiànchǎngkānchá]
現場勘察 英文
in-situ inspection
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : Ⅰ動詞(仔細看; 調查) examine; observe; look into; scrutinize Ⅱ名詞(姓氏) a surname
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  1. Once the scene was assessed the ale personnel then established the triage area with assistance of the command post

    一旦后,執法人員緊接著在指揮所的協助下搭建傷檢分類區。
  2. Geotechnical investigation and testing - field testing - part 11 : flat dilatometer test iso ts 22476 - 11 : 2005 ; german version cen iso ts 22476 - 11 : 2005

    土工和檢測.檢測.第11部分:扁平膨脹儀試驗
  3. After certain on - site investigation and inspection, the guangdong provincial department of foreign trade and economic cooperation shall hand out its decision upon seeking advice from local examination and inspection authorities

    廣東省對外貿易經濟合作廳經現場勘察、審核,徵求駐省檢查檢驗單位意見后,提出審批意見。
  4. Did not rush into the staging area. the scene was first assessed

    沒有倉促地進入準備待命區。首先被過。
  5. As to planar visco - elastic prediction of settlement, this paper fixes on range of the back - calculation parameters range, analyzes back - calculation parameters which are indispensably in the course of anti - analysis. since it is difficult to acquire the optimization result in simultaneous back - calculation, this paper puts forward a calculation method which combined with investigation data and field experiment data to minimize the parameters to get optimization

    ( 2 )針對二維粘彈性沉降預測,確定了模型反演參數的取值范圍,對于多層軟土地基變量同時反演很難獲得最優解的問題,提出結合工程實驗以減少參數的方法獲得最優解。
  6. The department can really realize one - stop service on case reporting, emergency rescue, urgent repair, view of the scene, accident handling, evaluation and compensation adjustment, and following service. at present, the company has 1000 car policy - holders

    結合公司自身的實力,能有效的實施24小時汽車出險報案,汽車緊急救援、搶修、現場勘察、事故處理、評估理賠、跟蹤服務等系統,連同個人汽車消費貸款以及二手車交易信息真正實了一條龍服務。
  7. The author mainly discussed the importance and some special notes in the proof - text of groundwork with other confreres, enhanced the owners and interelated departments ' recognition of the proof - text of groundwork, through a case study in shenyang city of liaoning province in northeast china

    摘要針對目前地基驗槽工作存在的問題與不是,利用相關的技術規范並結合部分工程實例,探討分析地基驗槽工作的重點及地質異常的處理方法,歸納總結地基驗槽工作出問題的原因,重申地基驗槽工作的重要性,用以加強業主及相關部門對地基驗槽工作的重視。
  8. ( 3 ) by spot reconnaissances, according to the results of calculations and measures, the problem of vibration is solved by adding deflexed supporting and suspending nogs, making pipelines shunt - wound and without changing the previous design and collocation, which can also measure up nationally. to complete the improving program successfully, the improving project is demonstrated using ansys5. 6 limited - unit analyzing software, the results of it show that the project put forward can resolve the problem of transmitting steam pipelines

    通過現場勘察,根據計算和測量結果,決定在不改變導汽管原有設計和布置,同時又滿足國家標準的前提下,採用加裝偏轉支吊架、導汽管並聯的措施,通過改善導汽管剛度和改變管道固有特性的方法,對該機組四根導汽管振動問題進行了處理。
  9. General specification for lighting equipment in vehicle at traffic accident scene

    道路交通事故現場勘察車載照明設備通用技術條件
  10. Furthermore, the company provides investigation and design of installed fields according to different demands of customer

    從售前現場勘察地設計,配套方案的選購、到器材安裝,一切均以客戶的需求為主。
  11. After their on - sight visits, the evaluation commission met at the ioc headquarters in lausanne in order to produce a report based on their conclusions about the candidatures

    在他們現場勘察后,評估團會在國際奧委會總部洛桑集合,旨在根據他們關于侯選資格的結論擬出一份報道。
  12. This dissertation is subject to freeway. first part analyses the related law of accident and its factors via the basic work of the statistical analysis and site prospecting, preliminary establish study field and factors ? cluster

    本文以高速公路作為研究對象,首先經過現場勘察與統計分析的基礎性工作,分析高速公路交通事故及其影響因素的相關規律,初步確立研究范疇與重心。
  13. The main mission of simulation is to help trouble removal people reconnaissance field, calculate parameter and analyze causality fast. and with these, the reason for accident, the policy on how to avoid accident and minimize loss will be conclude

    其主要任務是輔助事故處理人員快速、高質量地進行現場勘察、參數計算和因果分析,進而研究事故發生的原因,探求避免事故、減少損失的策略。
  14. How to distinguish the sliding zone from a loess landslip relied on the technician ' s experience in - site. 4 typical loess landslides located in jingyang county along jinghe river, named dongfeng landslip, shutangwang landslip, xiuchidu landslip and taiping landslip were studied through in - situ measurement and sample tests to identify the sliding zone

    摘要以陜西徑陽縣徑河沿岸4個典型黃土滑坡為研究對象,通過現場勘察和采樣試驗,探尋滑帶土的物理特性和結構特徵差異,以期在實踐中為確定滑動面位置提供可靠依據。
  15. Based on in - situ investigation, indoors soil tests, data process and calculation analysis for chunhua reservoir, this article acquires the distributing regulation and physical & mechanical properties for each layer soil below the dam base, and further determines typical model cross sections for static & dynamic stress deformation analysis

    本文根據對純化水庫進行的現場勘察、室內土工試驗、室內資料處理、計算、分析獲得了壩基以下各土層的分佈規律及物理、力學性質指標,進而確定靜、動應力變形分析的典型斷面。
  16. Finally, along with the market competition becoming more and more global and impetuous, and our government pays more attentions to normalize market, durative development, draw new laws and rules constantly, these large and middle scale companies can but survive and develop with project management, which is a powerful weapon dealing with complicated and changeful circumstance

    最後分析了隨著市競爭的全球化和激烈化,以及我國著眼于規范市和可持續發展,新的法律、規則的不斷出,大中型設計單位的生存與發展將離不開項目管理這一應對復雜多變環境的有力武器。
  17. Royal sunalliance shanghai claims staff loss adjuster appointed should have the opportunity to visit the scene of incident and inspect the loss or damage before any repairs or alterations are effected

    幫助並允許本公司理賠人員或本公司指定的保險公估人員在任何修繕措施實施前進入相關區域事故
  18. The company serves content around project early days, metaphase, later period each phase, cover earth to build, each major such as adornment, installation, municipal, gardens, traffic, irrigation works ; especially : service of representative of invite public bidding permeates reconnaissance, design, inspect manage, construction, equipment, material, purchase wait for each domain ; cost seeks advice use current the most advanced tsinghua si weier is three - dimensional system of software calculating an amount, control to the project executes the spot to be mirrorred in real time and undertaking cost dogs ; the adroitness in project management uses fidic term and conditions of contract, the mature construction on international project management pattern introduces in management of domestic construction project ; company of software of subordinate path be in harmony is with advanced science and technology rely on, foot of client of prep close behind leads the market, dedicated the development at project software, apply with promotion

    公司服務內容圍繞工程建設前期、中期、後期各階段,涵蓋土建、裝飾、安裝、市政、園林、交通、水利等各專業;特別是:招標代理服務滲透到、設計、監理、施工、設備、材料、采購等各領域;造價咨詢採用當前最先進的清華斯維爾三維算量軟體系統,對工程實行實時反映並進行造價跟蹤控制;項目管理中熟練運用fidic合同條件,將國際上成熟的建設項目管理模式引入到國內建設項目管理中;下屬道融軟體公司以先進科技為依託,緊隨客戶步調引領市,專注于工程建設軟體的開發、運用與推廣。
  19. Geotechnical investigation and testing - field testing - part 10 : weight sounding test iso ts 22476 - 10 : 2005 ; german version cen iso ts 22476 - 10 : 2005

    土工和檢測.檢測.第10部分:重力探測試驗
  20. Based on the investigation of resident houses in taishun which was destroyed by shanxi reservoir earthquake and the site inspection of the destruction of building near epicenter, it is pointed out that the reason for severe seismic damage is that masonry - concrete structures built in recent years did not obey the rule of the code for seismic design of buildings [ 1 ], which mainly contains three aspects, first, the construction of wall was not consistent with the code, second, the design of structure was not reasonable, last, the site selection of base foundation was not good enough

    摘要通過對今年2月4日2月16日文成、泰順發生的珊溪水庫一系列地震中受災的民房破壞調查(現場勘察地震給震中附近的建築造成的破壞) ,筆者指出這次系列地震震害較重的主要原因是:近年農村新建的磚混結構沒有按《建築抗震設計規范》建設,主要有三個方面:其一,墻體違反規范施工;其二,結構設計不合理;其三,地基基礎選址不恰當。
分享友人