現場配料 的英文怎麼說

中文拼音 [xiànchǎngpèiliào]
現場配料 英文
field mix
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  • 配料 : charge mixture; batching; burdening; ingredient; furnish; dosage; [冶金學] burden
  1. Supply mode : supplied by powder and liquid materials. the customers can confect to use on spot

    供貨方式:由粉狀與流體兩種材供應,用戶製使用。
  2. Based on in - situ investigation and laboratory experiments, the article analyzed in detail the factors which affect the transportation and strength characteristics of gangue cemented tailing grain fillings such as powder coal, water - reducer, mortar density and grain size distribution

    摘要以調查和室內實驗為基礎,從粉煤灰、減水劑、漿體濃度、粒級級等方面,對煤矸石作為膠結充填骨的管道輸送特性和強度特性進行了詳細的分析。
  3. On the field construction of storage tank, the hoisting structure of electric block, by means of mechanics analysis and computation, can determine the amount which the electric block requires, the size of its side column and central column and its connecting forms, thus eventually reasonably allocating construction tools and decreasing the consumption of assistant materials only when the construction security is guaranteed

    摘要儲罐施工中,電動葫蘆提升結構可通過力學分析、計算,確定所需電動葫蘆的數目、提升組合結構中邊柱和中心柱的規格尺寸及其連接形式,達到在保障施工安全的前提下合理置施工機具、減少輔助材消耗的目的。
  4. X - ray diffraction spectrum, empa methods and several tests including mechanical properties, electrochemistry, corrosion wear, on - site plate hanging, the microstructure of steel has been observed and analyzed, performance has been studied, and corrosion - abrasion, fragility mechanism, and microalloy application in ferritic stainless steel have been explored comprehensively. the test results of electrochemistry, corrosion wear and on - site plate hanging have been analyzed. the analytical result shows that crsomo has enough corrosion resistance in phosphoric acid slurry because it has high chromium and low carbon

    通過實驗室的電化學試驗、腐蝕磨損試驗和磷肥廠的掛片試驗結果分析,表明: cr30mo鐵素體不銹鋼高鉻低碳的合,保證其在磷酸漿中具有足夠的耐蝕性: cr30mo中( fe , cr ) _ 23c _ 6 、 ( fe , cr ) _ 7c _ 3 、 mo _ 2c 、等碳化物硬質點從基體的彌散沉澱析出可提高鋼的硬度和耐磨性,使得鋼在磷酸漿中具有良好的耐磨蝕效果。
  5. Road construction and maintenance equipment. on - site calibration and verification of the settings of the continuous dosing apparatus of material production plants. part 5 : dry bulk weighing dosing machine. substance weighing test

    道路建設及維護設備.材生產廠連續製設備的校正及檢驗.第5部分:干重計量機.材重量試驗
  6. For initial use of the product, trial - mixing shall be made with reference to local raw materials, such as m5 dosage 0. 12 - 0. 13

    初用本品,應視當地原材后採用,如m5摻量0 . 12 - 0 . 13分別試,採用與施工攪拌速度相同的攪拌機(單軸攪拌機或人工)拌合的砂漿中取出。
  7. Different hopper and collecting units are available for beside - machine crushing and recycling

    根據不同的喂方式斗及集裝置,實機邊回收。
  8. Content of asphalt, aggregate gradation, marshall stability, ratio of bitumen to aggregate and spalling adhesiveness are expatiated in terms of the stability of modified asphalt mixture at high temperature for ji - mu highway measured on the spot, and the rutting damage and control measures are also analysed

    摘要根據雞牡公路工程實踐,通過試驗段割條測試改性瀝青混合高溫穩定性,闡述了瀝青含量、礦、馬歇爾穩定度、油石比、礦粘附性等,對車轍產生的危害,以及控制措施。
  9. Research staff, persons in charge of pilot production, test, quality assurance and registration, heads of the organizations, keepers of the apis, samples, original records, files and credence, and finance staff should be on the inspection site and support the inspectors

    藥品研製過程所涉及的各試驗項目研究人員、樣品試制、檢驗、質量保證負責人、藥品注冊負責人、機構負責人、相關的原材、樣品、各類原始記錄、檔案資、票證憑據等的保管人員、財務人員在核查過程中應在崗,並按照核查人員的要求合核查工作。
  10. Application of can field bus in nuclear scale automatic ingredient system

    總線在核子秤系統中應用
  11. And then through paving test road in xinxiang, the paper studied on test methods of measuring early strength additives content and gradation of lime fly stabilized aggregate, these methods are benefit to control of construction quality

    與此同時通過修築試驗路,研究了摻加外摻劑二灰碎石混合中外摻劑含量的檢驗方法和二灰碎石混合的檢驗方法,這些方法對于施工質量控制具有實意義。
  12. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    公路沿線廣泛分佈有昔格達地層,昔格達地層能否用作高速公路路基填,國內沒有先例,本論文就是結合導師的科研項目,在非典期間,長達5個月的工作,完成了從試驗、施工工藝到路堤分層沉降監測等工作,是面對生產實際,認識昔格達地層的性質和其作為地基、路基和填應用中面臨的問題進行的研究。主要的研究內容有:對攀西地區地層巖性、構造等地質環境和昔格達地層的沉積歷史過程作了系統的分析,研究表明西攀高速公路主要受安寧河斷裂和昔格達斷裂影響,通過地區地震活動頻繁,差異沉降較大,對公路建設、安全運行和沿線構築物設計有較大影響;由於昔格達地層在有些路段作為地基、有些作為路基,對其基本性質進行了研究:包括天然密度、含水量、塑液限、顆粒級等指標的試驗研究。研究成果表明:昔格達地層為湖相沉積,主要為砂巖和泥巖,它以細粒組為主,同時粘粒的存在,使其具有一定粘性。
  13. Based on the micro - surfacing material control, the design of mixing ratio of thin paste, the cure of damage of road surface, and the quality control of construction press, etc, the keys of micro - surfacing construction quality control was introduced and it is suggested that the means of material mixing experiment should be standardized and improved continuously so as to meet the demands of on - spot material control and to establish an effective quality supervision system, by which the effect of the micro - surfacing practice can be ensured

    摘要從微表處的材控制、稀漿混合合比設計、原路面病害的處理、施工過程質量控制等方面介紹微表處施工質量控制要點,提出有必要不斷規范和完善混合的試驗方法,更好地適應施工控制的需要,並建立行之有效的質量監控體系,才能保證微表處的實施效果。
  14. They are not only nice to look at, but also with the strong points of high accuracy and few malfunctions, can be wildly used in the paint shop on spot

    它不但外形美觀,而且具有高精度故障率低的優點。能廣泛應用於塗專賣店的色。
  15. Rigid polyurethane and polyisocyanurate foam when dispensed or sprayed on a construction site - specification for dispensed foam for thermal insulation or buoyancy applications

    施工製與噴塗用硬聚氨酯和聚異三聚氰脲酸酯泡沫塑.第2部分:絕熱或彈性製泡沫塑的規范
  16. In transferring proprietary know - how, the licensor should provide the licensee with the relevant design blueprints, the rules for the manufacturing processes, illustrated instructions, technical data, prescriptions, formulae, key equipment, models, samples, list of materials and materials specifications, operating instructions, detailed regulations on on - site operations, and the relevant information and data regarding technical demonstrations, on - site guidance, product quality control and inspection procedures, repair procedures and equipment, and other commercial information

    供方轉讓專有技術,應向受方提供有關的設計圖紙、工藝規程和示意圖、技術數據、方、公式、關鍵設備、模型、樣品、材清單和說明書、操作方法說明、工作細則、技術示範、指導、產品質量控制和檢測方法、維修的方法和設備以及有關的商業情報等資
  17. Road construction and maintenance equipment. on - site calibration and verification of the settings of the continuous dosing apparatus of material production plants. part 2 : aggregate weighing dosing machine

    道路建設及維修設備.材生產廠連續製設備的校正及檢驗.第2部分:總重量計量機
  18. Road construction and maintenance equipment. on - site calibration and verification of the settings of the continuous dosing apparatus of material production plants. part 3 : aggregate volumetrique dosing machine

    道路建設及維護設備.材生產廠連續製設備的校正及檢驗.第3部分:體積計量機
  19. Road construction and maintenance equipment. on - site calibration and verification of the settings of the continuous dosing apparatus of material production plants. part 4 : dry bulk weighing dosing machine. belt sampling test

    道路建設及維護設備.材生產廠連續製設備的校正及檢驗.第4部分:干重計量機.傳動帶抽樣試驗
  20. Well designed shape 、 reliable sensitive 、 easy and for operation 、 widely applied to al kinds of industrial weighing

    美觀大方、精確可靠、易於操作、廣泛用於各種工業稱重、生產現場配料和包裝等。
分享友人