用螺栓固定的 的英文怎麼說

中文拼音 [yòngluóshuāndìngde]
用螺栓固定的 英文
bolted
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : 1. [動物學] (軟體動物) spiral shell; snail; conch 2. (螺旋形的指紋) whorl (in fingerprint)
  • : 名詞1. (可開關的機件) bolt; plug 2. (塞子) stopper; cork
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 4次方是 The fourth power of 2 is direction
  • 螺栓 : bolt; screw bolt; threaded bolt
  1. Ordinary bolt connecting bolts as a permanent use, when the design requirements or questions about its quality should be carried out when the smallest lag bolts kind complex load testing and the results were consistent with national standard 《 mechanical fasteners, bolts, screws and stud 》 ( gb3098 )

    普通作為永久性連接使時,當設計有要求或對其質量有疑義時,應進行實物最小拉力載荷復驗,其結果符合國家標準《堅件機械性能、釘和柱》 ( gb3098 )
  2. The rear axle is stationary, and is bolted rigidly to the main frame

    后軸是剛性在主機架上。
  3. Yet another new, patented benchmade exclusive, the bilt system ( bolted inline tang ) simplifies the fixed blade handle assembly process while at the same time strengthening the overall assembly itself

    另一種蝴蝶新高級專利,這種系統(後部有)是很簡單裝配刀柄,同時以加整個系統。
  4. In this test, a special bolt - jack is used to exent of prestressing force to brace angles as the whole structure is under dead - load. in this state brace angles withstand partly load before twice - load and the stress and strain of concrete are decreased. in this way the aim of removal of load and strengthening can be reached

    本試驗中採千斤頂在恆荷載水平下對混凝土柱角鋼撐桿施加預壓應力,使外包角鋼在二次受力前即分擔部分荷載,使混凝土應力水平和應變水平降低,達到卸載與加同步進行
  5. Vitreous enamel coatings for use on bolted steel panels - specification for coatings on bolted steel panels for use in agricultural slurry tanks

    鋼板瓷釉塗層.農業泥漿罐鋼板塗層規范
  6. This voltage transformer has three poles and the iron is made of sheet. the body is fixed on the box cover by clamping. there have the primary and secondary bushing also on the box cover

    本系列電壓互感器鐵心由條形矽片疊成,為三柱芯式,器身鐵夾件在箱蓋上,在箱蓋上裝有一次及二次套管等,油箱鋼板焊成,油箱壁下部裝有接地及放油塞,箱底有四個安裝孔。
  7. The anchor bolts and nuts must be processed and used as a whole set. the embedded anchor bolts for equipment foundation shall be installed and fixed with positioning forms

    地腳母必須配套加工,配合使。設備基礎預埋地腳位模板安裝
  8. The bracket and vertical column of cable tray will be installed by welding or expansion bolt of the basement. the welding place treatment will be done by painting

    橋架立柱、托臂等支架可與基礎預埋件焊接,也可採膨脹,對于現場焊接處一要做好防腐處理,通常由戶現場塗刷防腐漆。
  9. The relief valve cover shall be secured with stainless steel bolts and shall utilize a quarter - turn locking joint to capture the spring load of the relief valve

    安全閥閥蓋應該採不銹鋼,應該採四分之一轉鎖連接來所安全閥彈簧負載。
  10. Road vehicles. heads for spin - on fuel filters with horizontal flange for compression ignition engines. mounting and connecting dimensions

    道路車輛.壓燃內燃機帶水平法蘭用螺栓固定的燃油濾清器頭.安裝和連接尺寸
  11. In joist ' s temporary fixation, if temporary bolt and drill nail are used, amount of them should be calculated as flowed specification : the amount should be no less than 1 / 3 of all holes ; at least, two temporary bolts should be used ; amount of drill nail should be no more than 30 % of temporary bolts bolted ( grade a, grade b ) hole shouldn ' t be fixed with drill nail

    桁架臨時如需臨時和沖釘,則每個節點處應穿入數量必須由計算確,並應符合下列規:不得少於安裝孔總數1 / 3 ;至少應穿兩個臨時;沖釘穿入數量不宜多於臨時30 % ;擴鉆后( a級、 b級)孔不得使沖釘。
  12. The support pedestal shall be designed for anchor bolting to a concrete foundation and shall be of adequate strength and mass to support the combined weight of the pump / motor assembly and all forces imposed by the pump unit during operation

    支撐基座應該採在混凝土基座上,應該具有適當強度和質量,能夠支撐泵/電機總裝總重量,以及泵設備在運行過程中所產生所有壓力。
  13. Form ties bolt : 12 thin bolt use double nut for locking action, 16 wide bolt use 12 iron thread for locking to prevent release power after locking nut

    6對拉: 12細扣使母, 16粗扣鎖母緊12鐵線防止松動。
  14. Road vehicles. single fuel filters with horizontal flanges and centre bolt fixing for compression ignition engines. mounting and connecting dimensions

    道路車輛.壓燃內燃機和帶水平法蘭單極燃油濾清器.安裝和連接尺寸
  15. Separate bolted on cooling jackets or externally mounted cooling fluid piping are specifically prohibited

    特別要強調,禁止安裝採用螺栓固定的冷卻罩,或在外部安裝冷卻流體管道。
  16. Disc ? rugged disc is bolted and pinned to machined seating surface is mated to seat ring for positive shutoff

    閥瓣-堅閥瓣通過和銷釘在機加工閥座表面上,配置成對閥座環,有利於積極有效關閉。
  17. Railway fixed equipment. crimped or bolt crimped terminal material for electric traction lines

    鐵路設備.電力牽引線壓接或壓接裝置
  18. Transportation and handling of chemicals. road tankers. caps for valves fixed by pins or bolts

    化學製品運輸與裝卸.道路罐車.銷釘或閥門蓋
  19. Reinstall the handwheel in the correct orientation so that the original setting is indicated and secure with the retaining bolt

    按照正確方向重新安裝手輪,使得原先設置能夠顯示,並
  20. When this sprocket / bearing failed, the retaining plate and bolt with the safety lanyard failed also and this allowed the assembly to drop to the floor

    當這個部位鏈輪/軸承壞了時候,安全繩印版和也壞了導致整個印機掉在地上。
分享友人