疏水管 的英文怎麼說

中文拼音 [shūshuǐguǎn]
疏水管 英文
drain pipe
  • : Ⅰ動詞1 (疏通) dredge (a river etc )2 (疏忽) neglect 3 (分散; 使從密變稀) disperse; scatte...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 水管 : waterpipe; water carrier; aqueduct; water conduit; water pipe; syphon; siphon (消防) 水管車 hos...
  1. Abstract : considering the stochastic characteristic of main hydrogeologic parameters in yuanbaoshan open coal pit, a groundwater stochastic management model for optimal drainage borehole design is established. the result of the modeling shows the effect of stochastic characteristics of hydrogeologic parameters on the result of management modeling. it was found that the higher the parameters uncertainty and the management reliability level, the worse the management result

    文摘:從影響元寶山露天礦地下乾的主要文地質參數隨機性特徵分析入手,建立並求解了元寶山露天礦干工程優化設計的隨機地下理模型,揭示了文地質參數隨機性對理模型結果的影響,認為參數的隨機性越大,理結果越壞;置信平越高,理結果越壞,且滲透系數和邊界條件對理結果影響最大。
  2. The cuticles of most vascular plants are covered with a thin layer of largely hydrophobic constituents.

    大部分維囊植物的角質層都被有薄薄一層很的成分。
  3. Steam trap flow direction in accordance with that of the pipe line

    閥的流向要與路流向一致。
  4. Note : the elevated tank, rotameter, water drain apparatus, technological valve and pipeline are settled by customers themselves

    注:其中高位槽轉子流量計器工藝閥門道由用戶自理。
  5. The drain is blocked and needs unplugging

    堵塞了,得通一下
  6. The gas field in pemfc means the gas distribution in gas source, gas inlet tube ( scale of m ), gas - blower, gas manifold ( scale of cm ), channel ( scale of mm ), diffusion layer ( scale of um ), hydrophobic layer and catalyst layer ( scale of nm ). the aim of changing the scales is to make oxygen reach reaction area as evenly as possible

    Pemfc的氣場指在氣源、進氣(分米級) 、風機、進氣箱(厘米級) 、流道(毫米級) 、擴散層(微米級) 、層(亞微米級) 、催化層(納米級)中的氣體分佈,每一級尺度的變化是為了氣體的進一步均勻化。
  7. Do not jump blindly down the building, use ladders, balcony, or ( water holes ) to escape

    千萬不要盲目跳樓,可利用散樓梯、陽臺、落等逃生自救。
  8. The supply system was destroyed during the war, mainly due to human negligence. the allegation that the japanese military government deliberately destroyed the system was incorrect. only minor parts of the reservoirs and catchment areas were bombed. damage to the urban water supply infrastructure was mainly related to ancillaries, such as small diameter water pipes, with many water meters and public standpipes destroyed or stolen

    整體來說,供系統在戰時的損毀大多來自人為忽,日軍並未肆意破壞自來系統,因此只有少部份塘與集區受炮火波及;至於城內的供設備,主要是配套設施如輸及供配件的損毀,其中表、公共龍頭等被盜竊的情況較嚴重。
  9. The problems needing attention in the design and construction of directly buried steam pipeline are analyzed in terms of insulation construction, moisture removal pipe, steam trap well, fixing support, pipeline welding and selection of pipeline material, and the relevant solutions are put forward

    摘要從保溫結構、排潮井、固定節、道焊接、道材料選擇等方面,分析了在直埋蒸汽道設計與施工中應注意的問題,提出了解決方法。
  10. When the discharge volume is near the maximumdischarge volume of the trap, it issuggested that fhe sixe of the water discharge pipeline should be as large as possible

    當排量接近閥的最大排量時,建議盡可能擴大排線的尺寸。
  11. Super - hydrophobicity of post - like aligned carbon nanotube films

    柱狀結構陣列碳納米膜的超性研究
  12. The requirements for supervision of recovery of condensate from steam heating system and technique of automatic steam traps

    蒸汽供熱系統凝結回收及蒸汽閥技術理要求
  13. The requirements for supervision of recovery of conde nsate from steam heating system and technique of auto matic steam traps

    蒸汽供熱系統凝結回收及蒸汽閥技術理要求
  14. Clear pipe line with pressurized steam before installation steam trap

    安裝閥之前應用帶壓蒸汽吹掃道。
  15. T he land area planned for nanxiang high - tech park is 12000 mu. today, its infrastructure construction has been completed. water, gas and poewer supply, drainage system, and telecommunication network have all been installed. roads have been constructed and opened to traffic. around the park there are 7 banks, 6 supermarkets, 8 colleges and schools

    南翔園區總體規劃土地面積約12000畝, 「七通一平」基礎設施一步到位:給道接通、雨排放通、污納入市政網、煤氣道聯通、電力系統、電信網路順通、 「四縱四橫」道路平坦暢通。
  16. A new method which carried out the self - assembly of drug - loading nanoparticles and stent by comprehensively applying the micro - forces such as dielectrophoretic force, capillary force, and hydrophobic force is put forward, and the self - assembly process schematic drawing is given

    同時提出綜合應用介電泳動、毛細作用和組件的性等微觀作用力,實現載藥納米顆粒與血支架自組裝的方法,並給出了自組裝的實現工藝圖。
  17. Standard specification for steam traps and drains

    蒸汽閥和排
  18. Specification for steam traps and drains

    閥和排的規范
  19. Through static emulating calculation of the high - pressure heater, the influence of high - pressure heater leakage upon its operation paeameters, such as outlet temperature of the feed - water, pressure loss of the steam extraction pipeline, and temperature of the drain, has been analysed

    摘要通過對高壓加熱器的靜態模擬計算,分析了高壓加熱器?漏對其運行參數,如給出口溫度、抽汽道壓損、溫度的影響。
  20. According to the main cause of the heat loss in the course of conveying and applying steam, the steam - piping system of southwest jiaotong university has been rebuilt by designing and installing pipe rightly, optimizing the heat - insulating material and its thickness, reasonably selecting drainage valve and reasonably reclaiming condensate, the steam exploitation efficiency has been improved

    根據蒸汽輸送、使用過程中熱損失的主要原因,利用道的正確設計與安裝、優化的保溫材料和厚度、閥的合理選擇及冷凝的合理回收改造西南交大熱力網,提高了蒸汽的利用效率。
分享友人