相交坡度 的英文怎麼說

中文拼音 [xiāngjiāo]
相交坡度 英文
intersection grade
  • : 相Ⅰ名詞1 (相貌; 外貌) looks; appearance 2 (坐、立等的姿態) bearing; posture 3 [物理學] (相位...
  • : Ⅰ動詞1 (把事物轉移給有關方面) hand over; give up; deliver 2 (到某一時辰或季節) reach (a cert...
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 相交 : 1 (相交叉) intersect: ab與cd兩直線相交於e點。 the lines ab and cd intersect at e ; the line ab ...
  • 坡度 : falling gradient; slope; inclination; declivity; pitch; batter
  1. Whereafter, based on the analysis on the flood influence for traffic lines, the research is centered on the following parts : firstly, the destroying modes, reasons and mechanism of flooded lines are discussed, and the frameworks and countermeasures of preventing and controlling hazards system are put forward ; secondly, the ways of region forecasting for the landslide are analyzed and the automation of landslide forecast for certain site through visual programming is realized. furthermore, the function of dynamic segmentation in arc view is made use of to realize the forecast result ' s visualization ; thirdly, the reasons and patterns of roadbed subsidence are discussed and the methods of forecasting subsidence based on the gm ( 1, 1 ) model are put forward. then the applications of the arcview software and its extended module on the study of roadbed subsidence are debates upon ; fourthly, an analysis on the sources of flood for traffic lines, which situate in the reservoir coverage area, is given

    接著,論文探討了山區通線路災害的特點、分類、時間和空間分佈規律以及災害的防治原則和對策等;然後,以洪水災害對通線路的毀壞為主線,重點研究和分析了以下幾個問題:第一,探討了洪水對通線路的破壞方式,水毀原因以及水毀機理,並提出了通線路水毀防禦系統框架和對策;第二,分析了雨季邊塌方災害的區段預測方法;通過可視化編程,編制了雨季邊塌方災害的工點預報程序,並結合arcview實現了預測結果的可視化;第三,對路基沉陷原因和模式進行了分析,並提出利用gm ( 1 , 1 )模型對路基沉陷區進行分析和預測,最後論述了arcview軟體及其擴展模塊在沉陷區研究分析中的應用;第四,對汛期庫區線路災害的原因進行了分析,並探討了利用數量化理論對路基防護工程抗洪能力進行預測的意義;第五,提出從風險的角通線路的防災減災進行管理,對風險估計的關問題進行了論述,並探討了通線路水害危險區段的劃分問題。
  2. The result shows that the train passing capacity is closely linked with the train meeting place relative to the tunnel and that the train passing capacity decreases as the tunnel lengths and slops increase

    對計算結果的分析表明,隧道的列車通過能力與列車的會地點息息關,而且隨著隧道長的增大逐漸變小。
  3. Bearing capacity and displacement are two main problems in the application of geotechnical engineering. based on a series of pull - out tests using three kinds of paper and a sort of window screening as geogrid, twenty - seven in limit and several in working - stress geogrid - reinforced slope model tests designed through orthogonal principle have been conducted to have obtained the relationship between the bearing capacity and four factors ( i. e. reinforcement, angle of reinforced slope, the designed - length of reinforcement and the distance between layers of reinforcement ). the law of slope lateral ( horizontal ) displacement versus to the height of slope vary with external - load was derived from the model test data, and the main factor affecting the lateral and vertical displacement of geogrid - reinforced slope was obtained through analysis

    承載力(強)和變形是巖土工程應用領域的兩大主要問題,本文以紙和窗紗布模擬加筋土邊的土工格柵,在一系列拉拔試驗的基礎上,以正設計理論分別安排27個極限應力狀態和若干個工作應力狀態加筋土邊模型試驗,並以模型試驗獲得的數據為依據,採用誤差、極差及回歸分析方法,探討了加筋土邊承載力與筋類、筋長、層間距、角4因素的關關系,獲得了在外荷載作用下加筋土邊的側向位移隨高的變化規律(並進行了定性解釋)和頂的豎向位移特性,並分析其主要控制因素。
分享友人