相對下沉系數 的英文怎麼說

中文拼音 [xiāngduìxiàchénshǔ]
相對下沉系數 英文
coefficient of relative settlement
  • : 相Ⅰ名詞1 (相貌; 外貌) looks; appearance 2 (坐、立等的姿態) bearing; posture 3 [物理學] (相位...
  • : Ⅰ動詞1 (回答) answer; reply 2 (對待; 對付) treat; cope with; counter 3 (朝; 向; 面對) be tr...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : 數副詞(屢次) frequently; repeatedly
  • 相對 : 1. (面對面) opposite; face to face 2. (非絕對的) relative 3. (比較的) relatively; comparatively
  • 系數 : [數學] coefficient; ratio; modulus; quotient; factor
  1. According to the regional geology and the character of the lithofacies and well - logging facies, 4 kinds of sedimentary facies and 3 kinds of depositional system : marine system, delta system and fluvial system have been identified. the sedimentary facies of taiyuan formation is marine faceis, up to sanxi formation, the sedimentary facies is delta facies, the xiashihezi formation hel and he2 member are braided river facies, he3 member is meandering river facies. the mains types of sandstone of taiyuan formation are lithic quartzarenite and quartzarenite ; the mainly types of sandstone of sanxi formation and xiashihezi formation is litharenite

    通過20餘口井2000多米巖心的觀察和40幾口井的測井據解釋、比,在研究區目的層段識別出了12種基本巖和9種測井類型,在區域積背景和單井劃分的基礎上,根據巖和測井組合特徵,在太原組?石盒子組劃分出4種和若干積微,並進一步劃分為3類積體:濱淺海積體、三角洲積體和河流積體
  2. The influences of structure variables such as impeller types, baffle configurations, gas sparger, and operational variables such as gas rate, particle fraction on critical suspension speed of floating particle in an agitated vessel were investigated

    摘要探討了攪拌槳型、擋板和氣體分佈器等結構因素及氣體流量、顆粒質量分等工藝因素顆粒三臨界攪拌轉速的影響。
  3. 4. to promote the efficiency by build log facies computer analysis system to replace manual management. when applied the method in sebei area facies analysis has brought satisfactory result

    人工管理據效率低這一狀況,建立起一套測井管理及分析處理軟體統,通過澀北地區測井分析,取得了較好的效果。
  4. The model of variability of submergence depth is established based on the law of volume balance, and the changing trends of parameters like submergence depth etc are analyzed. according to the principle of supply and discharge balance, the method to predict oil yield is presented. subject to different objective functions, the corresponding optimum combinations of suction parameters are analyzed, and the importance of choosing objective function to optimum combination of suction parameters is emphasized

    本文研究了油井流入動態關,根據井筒內液量平衡原理,建立了沒度變化的學模型,分析了沒度等參變化規律;根據油井供、排平衡原則,得出了抽油泵排量穩定狀態產量預測的關;分析了不同目標函,油井抽汲參的組合效果,指出了目標函選取合理組合的重要性。
  5. Whereafter, based on the analysis on the flood influence for traffic lines, the research is centered on the following parts : firstly, the destroying modes, reasons and mechanism of flooded lines are discussed, and the frameworks and countermeasures of preventing and controlling hazards system are put forward ; secondly, the ways of region forecasting for the landslide are analyzed and the automation of landslide forecast for certain site through visual programming is realized. furthermore, the function of dynamic segmentation in arc view is made use of to realize the forecast result ' s visualization ; thirdly, the reasons and patterns of roadbed subsidence are discussed and the methods of forecasting subsidence based on the gm ( 1, 1 ) model are put forward. then the applications of the arcview software and its extended module on the study of roadbed subsidence are debates upon ; fourthly, an analysis on the sources of flood for traffic lines, which situate in the reservoir coverage area, is given

    接著,論文探討了山區交通線路災害的特點、分類、時間和空間分佈規律以及災害的防治原則和策等;然後,以洪水災害交通線路的毀壞為主線,重點研究和分析了以幾個問題:第一,探討了洪水交通線路的破壞方式,水毀原因以及水毀機理,並提出了交通線路水毀防禦統框架和策;第二,分析了雨季邊坡塌方災害的區段預測方法;通過可視化編程,編制了雨季邊坡塌方災害的工點預報程序,並結合arcview實現了預測結果的可視化;第三,路基陷原因和模式進行了分析,並提出利用gm ( 1 , 1 )模型路基陷區進行分析和預測,最後論述了arcview軟體及其擴展模塊在陷區研究分析中的應用;第四,汛期庫區線路災害的原因進行了分析,並探討了利用量化理論路基防護工程抗洪能力進行預測的意義;第五,提出從風險的角度交通線路的防災減災進行管理,風險估計的關問題進行了論述,並探討了交通線路水害危險區段的劃分問題。
  6. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地連續墻與樁在豎向荷載作用的工作性能有似性,將適用於樁基的poulos彈性理論引入連續墻的降計算中;清華大學水利水電工程濮家騮、于玉貞根據三軸試驗結果確定混凝土的參,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力值來判斷塑性混凝土防滲墻的安全程度。
  7. Then, taking into account the effect of the compression of the approach roadway and the differential slope of the bridge slab, the author analyzes the dynamic response of man - vehicle - road system when the vehicle approaches and leaves the bridge by means of laplace transform, the curve of man ' s acceleration versus time, the vertical force between the vehicle and road versus time, the man ' s maximum transient vibration value and the maximum force between the vehicle and road are got, and the program about the calculating progress above are edited. based on the analysis above, the influence on the maximum transient vibration value of some parameters about the vehicle and road such as the movement direction and speed and weight of the vehicle, the differential slope of the bridge slab and the length of the approach slab, are studied, and some conclusion are given

    分上橋和橋兩種情況,考慮車路耦合和橋面降坡差的影響,車輛通過設和不設搭板的路橋過渡段時「人?車?路」統的互作用用拉普拉斯變換法進行了動力響應分析,得到了人的加速度及路面車的垂直作用力隨時間的變化曲線、人的加速度最大瞬態振動值和路面車的最大作用力,分析了車輛的行進方向、速度和載重,橋面降坡差和搭板長度等車和路各參計算結果的影響,並編制了應的計算程序。
  8. In general, the upward amplitude curve " curvature is larger, and it changes quicker. on the contrary, the downward is smaller and slower ; because the flare force contains the square of the wave elevation velocity, it results in an difference between the flare force frequence and the associated moving frequence ; the flare force decreases the downward amplitude of heaving oscillations ; the speed of ship has an ignorant effect on the peak values of three calculated values, but there is an obvious effect on the oscillating frequence ; the wave amplitude has an effect on the ship motion, and there is an linear relation between the oscillating amplitude and the wave amplitude on the whole. by the way, there are some experiences and lessons according to the progress calculation : before the calculation of the ship motion, we should checkout the balance in a calm water firstly, namely, the whole displace of ship and the longitudinal position of the center of gravity must be consistent with the draft in calm water, or else, the calculation may show the " floating " phenomenon ; the mixed language programming has a lot of virtues, but it exists a fatal limitation - the debug of dll

    研究表明:在某些頻率范圍內關水動力基本不隨吃水變化,只有超過某一頻率后水動力的值才會出現差異;在橫搖方向,水動力並沒有隨著吃水的變化發生規則變化,而是出現了波動現象;近船首剖面的水動力計算表明,水動力的波動非常大,並遠遠偏離了平均位置的水動力值,值的變化速率也不盡同,總的看來,上振幅曲線曲率較大,變化較快,振幅曲線曲率較小,變化較慢;外飄力和波面運動的速度的平方項有關,導致其振動頻率和應運動方向的頻率不同;外飄力使升運動的幅值減小;船速三個計算量的峰值影響甚微,但振動頻率有明顯影響;波幅船舶運動的影響是明顯的,船舶運動的幅值基本上和波幅成線性關
  9. The thesis introduces the biot ' s three - dimension consolidation theory based on absolute linear - elastic theory ; the thesis designs the pit dewatering scheme of hand - dug piles support of shenyang subway ' s shenyang station construction ; the thesis uses finite element program to simulate the influence on around environments caused by pit dewatering, and finds the change laws of earth mass inner stress and the effect parameters on the surface deformation on the basis of reasonable hypothesis and the analysis of ground water exploitation progress. combined with stochastic medium theory, the thesis introduces dewatering subsidence coefficient, sets up the predicting model of the surface deformation caused by dewatering, and develops the computing program ; by application of program on a single well of underwater exploitation, it is proved that the program is feasible, so the prediction of the surface deformation caused by underwater exploitation is realized

    本文介紹了基於線彈性本構關的biot理論;設計了擬建沈陽地鐵沈陽站點人工挖孔樁支護施工的基坑降水方案;利用有限元程序,模擬了基坑降水周圍環境的影響;在合理假設的基礎上,分析了地水開采過程中,地層應力的變化規律,找到了影響地面變形的參;與隨機介質理論結合,通過引入采水建立了地水開采引起地面變形的預計計算模型,並編制了電算化程序;通過某單井開采實例驗證了該方法的可行性,實現了地水開采引起地面變形的預計。
  10. In order to otain high quality zno thin films, we, for the first time, employ the plasma enhanced chemical vapor deposition ( pecvd ) to prepare high quality zno thin film at low temperature using a zinc organic source ( zn ( c2h5 ) 2 ) and carbon dioxide ( co2 ) gas mixtures. the effects of the growing condiction and the native oxide layer of si substrate on the quality of zno thin films was studied in detail. to prepare p - zno and overcome the dufficulty of reverse due to the interaction between the n atomic, we obtain high qulaity p - zno by a easy way of thermal zn3n2

    為了在低溫制備高質量的氧化鋅薄膜,我們採用金屬有機源和二氧化碳氣源,首次利用等離子體增強化學氣積的技術在低溫制備了高質量的氧化鋅薄膜,統地研究了生長條件以及襯底表面氧化層薄膜質量的影響,確定了生長高質量氧化鋅薄膜的優化條件;為獲得p - zno材料,克服在zno中摻n雜質間互作用影響摻雜效率不易獲得p - zno的困難,我們通過熱氧化zn3n2的方法制備了p - zno ,獲得了一列研究結果: 1 、詳細研究了氣體流速比,襯底溫度和射頻功率實驗參氧化鋅薄膜特性的影響。
  11. ( 3 ) based on the working performance and mutual influence of the system of pcc pile - soil - cushion, pcc pile composite foundation is discussed in elastic method. a new calculation method of composite modulus of the pcc pile composite foundation is developed. furthermore, pile - soil stress ratio and settlement can be derived from the proposed method in this paper

    ( 3 )基於pcc樁?土?墊層所組成的一個工作體,綜合考慮各部分的工作特性及互影響,pcc樁進行整體分析,建立樁體平衡方程,考慮pcc樁在褥墊層及臥層中的上、刺入量復合模量的影響,並通過迭代的方法最後確定樁體模量發揮,提出了一種求解pcc樁復合地基模量的計算方法,進而得到pcc樁復合地基的降計算和樁土應力比公式。
  12. With the help of settlement plate, the author conducts observation more than 2 years on highway embankment built on the yiluo river alluvial flat in henan province. as a result many of data have been obtained. through analysising and studying these data, the occurring process of settlement and rate of settlement of the alluvial flat soft clay base under embankment have been found

    本文以伊洛河河灘軟土為研究象,利用降板路堤荷載作用的軟土地基降進行了長達兩年多的觀測,獲得了大量的據,通過這些據的分析研究,推算出m _ s和固結參,並得到了河灘軟土地基固結降速率的變化規律。
分享友人