砂巖柱 的英文怎麼說

中文拼音 [shāyánzhù]
砂巖柱 英文
sandstone cylinder
  • : 名詞(沙子) sand; grit
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  1. The factory undertakes the composing of the following business mainly : white marbl carved stone crouches the lion, the sleeping white marbl carved stone lion leak from the lion, white marbl carved stone, white marbl kylin, white marbl mythical wild animal ( pixiu ), white marbl dragon and phenix lamp pole, white marbl ornamental column, the cattle opening up virgin soil, white marbl figure of the buddha, the top of a pillar stone, white marbl fairy maiden, white marbl personage, white marbl carved stone elephant ( figure in stone ), white marbl dolmen, white marbl shi ting, stone bridge, white marbl stele, white marbl check dragon post, white marbl balustrade, granite dysmorphism, stone strip, flat piece of stone, foundation stone, door block, jade article treating, emboss, ornamental column, dragon post, lettering, silica sand, white marbl woollen cloth, ancient times build gardens ( breast board, platform ming dynasty, artificial stone with textures cut with an axe, rockery design, flowerpot, eroded limestone, mechanism cobblestone, mushroom stone etc. ), rockery fountain, nursery stock flowers and plants etc. paper of, saying that the stone table, stone bench, stone light, board carve characters on a seal, the column, vase post, window cover with, the door pocket, geomantic omen ball wait, and managing

    本廠主要承做以下業務:漢白玉石雕蹲獅、漢白玉石雕走獅、漢白玉石雕臥獅、漢白玉麒麟、漢白玉貔貅(皮休) 、漢白玉龍鳳燈、漢白玉華表、拓荒牛、漢白玉佛像、頂石、漢白玉仙女、漢白玉人物、漢白玉石雕大象(石像) 、漢白玉石牌坊、漢白玉石亭、石橋、漢白玉石碑、漢白玉盤龍、漢白玉欄桿、花崗異形、石條、石板、漢白玉奠基石、門墩、玉器加工、浮雕、華表、龍、刻字、硅、漢白玉毛料、古建園林(欄板、臺明、剁斧石、板道、石桌、石凳、石燈、牌匾刻字、圓、花瓶、窗套、門套、風水球等,並經營假山石、花盆、太湖石、機制鵝卵石、蘑菇石等) 、假山噴泉、苗木花卉等。
  2. These sandstone - and - conglomerate sea stacks were spared during the glacial sweep of the last ice age, but bear the effects of centuries of tidal erosion

    這些和聚成球形的海蝕是在最後冰河時代延伸冰期剩下的,而且承受了數世紀海潮腐蝕的效果。
  3. In sichuan red basin, excavating cuttings in gently inclined red beds composed of sandstone and mudstone intercalations, mudstone would be indented inward by weathering, and result in a niche on the slope surface. slope, and the bearing force of the support structure must computed in design. in this paper, the overlying sandstone bed is regarded as cantiever beam, and a calculation method for the bearing force is developed, a calculation example is also given

    分析了四川盆地緩傾角紅層地質結構特徵,將下覆泥風化形成凹腔后的視為懸臂梁,提出了一種計算泥風化凹進極限深度及在設計支撐時計算支護力的計算方法,並給出一個計算示例。
  4. On the basis of analyzing the rock mechanics, the bit working circumstance and property in the bottom hole of 6000m deep well, and making use of the former equipment such as a derrick, platforms etc, the paper demonstrates that the research and design of the mechanical device have been established including the high pressure simulating well bore, the high pressure connector between the static well bore and the rotating drill pipe, the high pressure simulating system of circulating fluid and the high pressure desander etc. the produce, control and dynamic analysis of the bottom hole four - dimensional pressure ( over burden, confined, pore and column pressure ) have been studied

    本文在對井底石的受力狀態以及鉆頭的工作環境和特性加以分析的基礎上,藉助原有的井架、平臺等設備,研究設計了模擬6000米井底壓力壞境的高壓模擬井筒、鉆高壓轉聯器、鉆井液高壓模擬系統以及高壓除器等機械裝置,並研究了井底四維模擬壓力(上覆壓、圍壓、孔隙壓和液壓)的產生、控制及其控制的建模與模擬,從而實現井深至6000米的四維井底壓力環境的模擬。
分享友人