砌石壩 的英文怎麼說

中文拼音 [dàn]
砌石壩 英文
stone masonry dam
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 石壩 : boulder dam
  1. Riprap protection for dam slope on the upstream of daguangba earth dam

    梅村水庫防滲加固設計
  2. Application of the dam with laid dry block stone casing

    棘洪灘圍護坡塌陷原因分析及處理
  3. The cement grouting applied in seepage control and stabilization of cement - rubble stone dam in jinjiang reservoir

    水泥灌漿在錦江水庫漿砌石壩防滲加固中的應用
  4. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用及磚成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。
  5. Analysis of the surrounding dam dry - laid stone slope revetment damage of a yellow river diversion reservoir at early period of water storing

    引黃平原水庫蓄水初期圍護坡破壞調查與原因分析
  6. The substitution method of testing the apparent density of the dam body of grouted rubble gravity dams

    漿重力體容重測試的參考求法
  7. Dam body stress computation and analysis of high stone masonry arch dam of jinggangchong reservoir

    井岡沖高體應力計算分析
  8. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯墻的結構與支護研究;特大型水輪發電機組的科學研究。
  9. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯墻的結構與支護研究;特大型水輪發電機組的科學研究。
  10. On principal points in construction technique of concrete - rubble gravity dam

    淺談砼重力施工技術要點
  11. By combining the design of cast asphalt concrete core earth - rock dam of nierji hydroelectric projects, an optimize study on the structural types and construction technology of cast asphalt concrete core are carried out in the article. the main contents of the study are summed up as follows : at present, the main and auxiliary core structures are widely adopted in the design of the cast asphalt concrete core earth - rock dam in the state, i. e. the main core to be asphalt concrete and auxiliary core of asphalt mortar masonry

    本文結合尼爾基水利樞紐工程的澆築式瀝青混凝土心墻土的設計,對澆築式瀝青混凝土心墻的結構型式和施工技術進行優化研究,主要研究內容歸納如下:目前我國在澆築式瀝青混凝土心墻土設計中,心墻的型式多採用主、副墻結構,即主墻為瀝青混凝土,副墻為瀝青砂漿體。
分享友人