砌石壩 的英文怎麼說
中文拼音 [qìdànbà]
砌石壩
英文
stone masonry dam-
Riprap protection for dam slope on the upstream of daguangba earth dam
梅村水庫砌石拱壩防滲加固設計Application of the dam with laid dry block stone casing
棘洪灘圍壩干砌石護坡塌陷原因分析及處理The cement grouting applied in seepage control and stabilization of cement - rubble stone dam in jinjiang reservoir
水泥灌漿在錦江水庫漿砌石壩防滲加固中的應用The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq
除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。Analysis of the surrounding dam dry - laid stone slope revetment damage of a yellow river diversion reservoir at early period of water storing
引黃平原水庫蓄水初期圍壩干砌石護坡破壞調查與原因分析The substitution method of testing the apparent density of the dam body of grouted rubble gravity dams
漿砌石重力壩壩體容重測試的參考求法Dam body stress computation and analysis of high stone masonry arch dam of jinggangchong reservoir
井岡沖高砌石拱壩壩體應力計算分析Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。On principal points in construction technique of concrete - rubble gravity dam
淺談砼砌石重力壩施工技術要點By combining the design of cast asphalt concrete core earth - rock dam of nierji hydroelectric projects, an optimize study on the structural types and construction technology of cast asphalt concrete core are carried out in the article. the main contents of the study are summed up as follows : at present, the main and auxiliary core structures are widely adopted in the design of the cast asphalt concrete core earth - rock dam in the state, i. e. the main core to be asphalt concrete and auxiliary core of asphalt mortar masonry
本文結合尼爾基水利樞紐工程的澆築式瀝青混凝土心墻土石壩的設計,對澆築式瀝青混凝土心墻的結構型式和施工技術進行優化研究,主要研究內容歸納如下:目前我國在澆築式瀝青混凝土心墻土石壩設計中,心墻的型式多採用主、副墻結構,即主墻為瀝青混凝土,副墻為瀝青砂漿砌體。分享友人