立澆 的英文怎麼說

中文拼音 [jiāo]
立澆 英文
upright casting
  • : 動1 (站) stand; remain in an erect position 2 (使豎立; 使物件的上端向上) erect; stand; set up...
  • : 澆名詞(姓氏) a surname
  1. Square slabs were cut from cubes cast with various aggregate sizes.

    從具有不同骨料粒度的注塊中切出方形板塊。
  2. The englishman, whose right eye was nearly closed, took his corner where he was liberally drenched with water and, when the bell went, came on gamey and brimful of pluck, confident of knocking out the fistic eblanite in jigtime

    那個英國人的右眼幾乎給揍瞎了。他回到自己那個角落,被以大量冷水。鈴一響,他就又鬥志昂揚渾身是膽地上場了,充滿了即擊倒那個埃布拉尼297拳手的信心。
  3. Paper tree efflorescence : two slips hand over to stand mutually, sprinkling some water for it, will open a beautiful flower after a while, be like an a multicolored small ice frostwork

    紙樹開花:兩個紙片相交站,給它點水,過一會兒就會開出漂亮的花,像一個個五彩的小冰霜花
  4. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元化發展戰略,集團公司的業務范圍除水電工程總承包外,還將業務擴展到各類土木工程、市政工程、海事工程的設計、施工、機械設備和金屬結構製造安裝等,核心競爭力進一步得到擴展和增強,形成了年完成土石方開挖15000萬方米、混凝土注1500萬方米、發電機組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合施工能力。
  5. Construction of cast - in - place box beam of dongshengbei interchange bridge

    東勝北互通交匝道橋現箱梁施工
  6. Our leading products are : ball mill, superfine agitating mill, vacuum plaster agitator, slip agitator, pressure - glazing tank, shower - dedust glazing booth, vibration sieve, leakage tester for water - closet, blast heater, rapid dispersion machine, magnetic separator, base - wipe machine, electric diaphragm pump and the vertical casting unit for medium and top grade of one - piece water - closet and close - coupled water closet, wash basin, pedestal, low level cistern and sink

    公司主導產品有球磨機、超細攪拌磨、真空石膏攪拌機、泥釉漿攪拌機、釉漿壓力罐、水浴噴釉廚、旋振篩、座便器漏水檢驗機、熱風爐、座便器彎管施釉機、高速分散機、磁選機、擦坯機、電動隔膜泵及生產中高檔衛生潔具的洗面器、分體座便、聯體座便、面具柱、低水箱洗滌槽等立澆成型機。
  7. In this paper, the software for the die casting technology parameters design is built based on the optimization of the die casting system matching, and is used for the design of the die casting technology parameters, such as the cross section area of the internal sprue, the fill speed and the fill time etc

    文章基於壓鑄系統匹配優化的思想,建壓鑄工藝設計軟體,使用軟體進行內道截面積、充填速度和充填時間等壓鑄工藝參數的設計。
  8. The site concrete pump is designed for a delivery rate of 87 m3 / h and maximum pumping pressure of 100 bar

    "現混凝土泵設計的輸送速度為87方米/小時,最大泵送壓力為100巴。
  9. The calculation model about the runner system of the downsprue of metal - powder injection molding ( mim ) and the finite element analysis of injection parts molding have been established. the analogue analysis of the molding process of metal - powder injection molding has been made and draw some correlative conclusion

    基於連續介質理論和有限元理論,建了金屬粉末注射成形注系統的流道和注射件成形有限元分析計算模型,並對金屬粉末注射成形過程進行了模擬分析,得出了相關的結論。
  10. The research showed that basin is the more important feeding resource than runner in runner type gating system in lost wax casting. therefore, on the basis of the basin as feeding resource, runner and ingate as feeding channel, a new design method for runner type pouring and feeding system in investment casting was developed. the corresponding feeding mathematical pattern and allowable total weight listed for casting cluster with different basin were established after analyzing the practical feeding of basin and the calculating process for design was described in detail

    在熔模鑄造橫道型注系統中,口杯是比橫道更為重要的補縮源,因此在足於口杯為補縮源、橫道和內道為注補縮通道的基礎上,開發了適用於熔模鑄造橫道型注補縮系統設計的新設計方法,在詳細分析了口杯的實際補縮情況后,建了相應的數學補縮模式和不同口杯的鑄件組許用鑄件總質量表,並具體介紹了設計計算過程。
  11. Based on the cause analysis for failure of water stop of tunnel ' s cast in site circular construction joint from theoretical and constructional point of view as well as the working mechanism of expansive water stop proposed in terms of width of construction joint, the relation between width of circular construction joint and water pressure resistance of water stop is established and its model test carried out

    首先從理論和施工角度分析了隧道現環向施工縫止水條的失效原因,然後從施工縫張開度的角度提出了膨脹止水條止水的原理,在此基礎上建了施工縫張開度與止水條抗水壓力之間的關系,並進行了模型試驗。
  12. Step irons with upstand for staggered manhole steps - part 2 : step irons to be set into prefabricated concrete units

    人孔直錯列階梯腳扣.第2部分:入混凝土預製件的階
  13. Step irons with upstand for staggered manhole steps - part 1 : step irons to be fitted in masonry or set into concrete

    人孔直錯列階梯腳扣.第1部分:砌墻或灌混凝土階梯
  14. Therefore, it is necessary to get temperature mode and its effect on the stress and the line deformation in one region of our country by theories and experiments. it can be used in the bridge design, which makes a reasonable time to construct, sprinkle concrete and control appropriate temperature on key constructing processes

    因此,有必要通過實驗和理論等研究工作,得到合適於我國或某一地區的大跨度pc連續梁橋的溫度場分佈規律及其溫度效應,可以用於指導設計,確定施工模及混凝土注的合理時機,對關鍵的施工工序進行適當的溫度控制。
  15. ( 2 ) aiming at the bigger irrigation quota of fall irrigation system and the complicacy of the salt movement in soil, the paper applies reservoir leaching model bring forwarded by w. h. van der molen to hetao irrigation district located in aridity area, and establishes salt leaching simulational model under the fall irrigation system. through calculating, the feasible fall irrigation quota is 100 - 120m2 / 667m2 in light salinization soil, and the feasible fall irrigation quota is 120 - 150 m2 / 667m2 in mild salinization soil. the model is reasonable and exact, and it can be researched deep

    ( 2 )針對在秋灌溉制度中秋定額較大,土壤中鹽分運移規律復雜的特點,利用w ? h ? vandermolen提出的水庫沖洗模型,建了地處乾旱地區的河套灌區區域內的秋制度鹽分淋洗模擬模型。經計算在輕度鹽漬化土壤中秋的灌溉定額以100 120m ~ 3 667m ~ 2為宜;中度鹽漬化土壤秋的灌溉定額以120 150m ~ 3 667m ~ 2為宜,模型合理可靠,準確可行,可進一步向縱深方向進行研究。
  16. 733 bell telephone stations owned and connected. basic trunking principles established for large exchanges. bank terminals molded in plaster of paris

    已經擁有676 , 733部貝爾用戶電話。建基本中繼原則用於大規模電話交換。機架終端採用熟石膏鑄。
  17. According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis

    根據掛籃前端牽索錨固點處的變形協調條件建了掛籃上混凝土築過程中牽索索力的增加量,並推導了掛籃上混凝土築過程中的各主要工況下掛籃前端標高的計算公式,對文暉大橋掛籃上混凝土築過程中的牽索索力和掛籃前端標高進行了細致地控制,確保了混凝土築的順利進行,為整個主梁線形和索力的雙控打下了良好的基礎。
  18. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed. the material and structure form of support frame are discussed. the design of support frame uses the method of limited state, and also it analyses the integer stability, part stability, and single stability, and then proposes the load analysis of multi - level support frame

    首先,針對轉換層梁模體系及支撐架施工,重點分析了轉換層結構現混凝土對模板側壓力值及模板對拉螺桿的計算;討論了轉換層支撐體系的形式及構造,詳細論述了基於極限狀態設計的支撐架計算方法,包括縱橫向水平桿的強度驗算、桿的整體穩定性、局部穩定性、單肢桿件穩定性等驗算,並提出了多層支撐架的施工荷載計算方法。
  19. At the finishing of this paper, the effective identification of designing factors is done and the setting elevation and the cable tension force in next stage are forecasted according to the situation of finished beams. through the forecasting, the constructing state is in coincidence with the designing state. during the bridge construction process, the value of designing parameters are made close to the construction state by means of data collections, optimal controls and detailed analysis of different reasons that caused errors

    最後,根據施工的實際狀態對設計參數進行了有效的識別,並利用灰色理論與預測控制相結合的方法,根據已梁段的實際狀況對下一施工梁段的模標高和斜拉索張拉索力進行預測,使施工過程中的受力狀態與已確定的合理施工狀態達到一致。
  20. Facing to the reduction of the water diversion from the yellow river for hetao irrigation district inner mongolia autonomy, and giving attentin to agriculture production and improvement of salinization, this paper researches optimization model of district water - saving irrigation water management. the paper also quests for the optimization model of crop irrigation system and the optimization irrigation strategy aiming at the short of water for agriculture. in order to save water and use water high efficiently, this paper researches the change regulation of irrigation system of spring - wheat that is the important crop in the irrigation districted establishes the multidimensional dynamic model of irrigation rules of spring - wheat. lt also makes the simulation model of salt leaching of fall irrigation rules during non - growing period, and sorts the elements influencing water - saving of irrigation system

    在內蒙古河套灌區的引黃水量減少又要兼顧灌區的農業生產和土壤鹽漬化向良性發展的形勢之下,本文針對灌區內區域灌溉水管理的現狀,對灌區內區域節水灌溉水管理優化模型進行了研究。研究針對農業水資源短缺的現狀,在節水灌溉條件下,對作物的灌溉制度進行優化模型探索,尋求最優灌溉策略。全文圍繞節水與高效用水,綜合應用了系統分析、灌溉排水及節水灌溉的原理和知識,研究了灌域內主要作物春小麥的灌溉制度的變化規律,建了春小麥灌水制度的多維動態優化模型;建了非生育期的秋制度的鹽分淋洗模擬模型;對節水灌溉水管理的影響因素的重要性進行了排序研究。
分享友人