管道的敷設 的英文怎麼說

中文拼音 [guǎndàodeshè]
管道的敷設 英文
laying of line
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ動詞1. (搽上; 塗上) apply 2. (鋪開; 擺開) spread; lay out 3. (夠; 足) be sufficient for Ⅱ名詞(姓氏) a surname
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. Besides serving as carriageways for vehicles and pedestrians, roads also accommodate various utility services, such as water and gas mains, sewers and electricity and telephone cables

    除了供車輛和行人使用外,本港路也了各種公用施,如水、煤氣喉、污水渠、電纜和電話線等。
  2. They are laying new sewers along the road.

    他們正在沿路排水
  3. Steam piping the design problem of the direct paving

    蒸汽直埋計問題
  4. Testing earth - moving machinery - method for the evaluation of lift capacity of pipelayers and wheel tractors or loaders equipped with side boom

    運土機械試驗.第6部分:側面帶起重吊桿機和輪式拖拉機或裝載機升降能力評定方法
  5. West pipeline crossing heihe river is the longest crossing project by a large excavation way and the method of laying both crude oil pipeline and products pipeline in a single trench

    摘要黑河是西部工程採用大開挖方式穿越距離最長河流,原油與成品油採用同溝方式穿越該河流。
  6. The modes selection of directly buried installation for hot - water heat - supply pipeline, the design and construction of directly buried installation with and without expansion joint and the quality assurance of prefabricated directly buried insulating pipe are discussed with a practical engineering example

    摘要結合工程實例,探討了熱水供熱直埋方式選擇,有補償和無補償直埋方式計與施工及預制直埋保溫質量保證。
  7. The directly buried installation has become the commend method for the district heating piping networks in china, and the designers in the field are in need of the consult date for the exoteric of probability and systemic introduce the design method for the directly buried heating pipe. so this report is try to carry the point

    直埋已成為我國區域供熱網推薦一種方式,該領域計人員迫切地需要一套理論聯系實際,較系統地介紹直埋熱力計方法參考資料,本論文編寫力求達到這一目
  8. Take the gelmud - lhasa product oil pipeline as an example, the authors study and discuss some technical problems about pipeline construction in the permafrost region, including pipe laying methods to be selected, cathodic protection technology, weather and environment variation along pipeline route and environment control of pipeline route

    以格拉輸油為例,探討了凍土地區工程可選擇方式、油氣電保護技術、氣候和環境變化對影響以及沿線環境理等方面問題。
  9. The main contents are as follows : firstly, the distinguishing feature of earth pressure in different lying way and the main calculation methods of the vertical earth pressure are analyzed and compared, the defect and applying limitation of earth calculation formula are pointed out. based on the elastic theory, formula to calculate vertical earth pressure on general trenching conduit is derived

    其主要內容包括以下幾個方面: 1 、對不同方式地下埋受力特點進行了分析,在此基礎上,介紹了上埋式垂直土壓力幾種主要計算公式,指出了各種公式局限性及其適用范圍,並以彈性理論為基礎推導了一般溝埋式垂直土壓力近似計算公式。
  10. The synthetic operation of engineering pipelines of a residential area is to collect designed and existing information of each kind of engineering pipelines in the layout space of the residential area, to analyze and investigate the information, to find out and solve the conflict in the constructing process of the engineering pipelines, to synthetically arrange the plane and vertical location of the engineering pipelines, to provide the foundation for the engineering pipelines " designing, construction and management the leading content of this dissertation is how to make use of the vertical space under roads in the residential area and rationally locate every underground engineering pipelines

    小區工程線綜合就是搜集包括現狀小區規劃范圍內各項線工程規劃計資料,加以分析研究、綜合安排,發現並解決工程線在規劃計中矛盾,合理地安排各平面位置和豎向高度,為各工程計、施工和理提供依據。由於架空方式很難保持環境完整和美觀,有礙小區進一步發展,且存在諸多不安全隱患,正被逐步替代,因而,如何利用小區路下豎向空間,合理置各專業埋地線,成為本文研究主要方向。
  11. The company has been undertaking projects such as power delivery and distribution system for alternating currents of 110 kv and below, smart architecture system, channel and optical cable laying project for communication system, computer network system, and cable television network,

    公司一直從事110kv及以下送變電和配電系統工程、建築智能化系統工程及通訊系統和光纜工程、計算機網路系統工程、有線電視網路、機電安裝與城市路照明等工程。
  12. Earth - moving machinery - safety - requirements for pipelayers

    土方機械.安全性.要求
  13. In order to improve efficiency and save energy obviously, the text analyses the problems existing in the design of providing heat through pipes in cities, such as the disposal of pipes, burying and lay directly, heat expiation of pipes, hydraulic balance and so on

    摘要通過分析城市集中供熱計中存在問題,對網布置、直埋,供熱熱補償以及水力平衡等進行了分類探討,以最大限度地提高效率節約能量。
  14. After a discussion of the heat transfer condition of the chilled water pipe which is installed in tunnel, the relation between the temperature of the chilled water and its transportation distance, the author holds that a central refrigeration system shall be adopted, and the loses of chilled water temperature in a long transportation distance could be overlooked on the condition that the pipe is heat insulated

    摘要分析了冷凍水沿地鐵區間隧時與周圍環境換熱狀況;認為採用集中供冷方式,在隔熱情況下可不?慮冷凍水因長距離輸送而引起溫升損失。
  15. Magnesium silicate temperature preservation dope is kind of ropypaste, it features with well spread, small shringking after dry, the temperacially used in the temperature reservation project fo abnormity equipment andunderground pipes

    硅酸鹽(鎂)保溫材料為稠膏體,塗性好,乾燥收縮小,使用溫度范圍寬,防水效果好,適用性強,特別適合二異形備和地下保溫。
  16. Responsibilities of the branch also include providing advice on regulatory accounting to the telecommunications authority, monitoring the performance of public telecommunications operators, investigating industry complaints regarding public telecommunications services, facilitating public mobile network operators access to land to place radiocommunications installations and coordinating the laying of ducts for telecommunications in public roads

    其他職責還包括就電訊規計帳向電訊理局局長提供意見、監察公共電訊服務營辦商表現、調查有關公共電訊服務業界投訴、協助公共流動網路營辦商進入土地置無線電通訊裝置、以及協調在公用電訊電纜工程。
  17. At the environmental temperature of - 30 ~ + 60, both the mechanical and electrical properties of the cable remain unchanged

    主要用於,也可用於架空,在- 30 + 60環境溫度條件下,電纜機械和電氣性能均保持不變。
  18. Furthermore the attentions related to the layout and material selection of pipelines of drinking water, hot water, drainage, rainwater and condensing water of air conditioning for residential houses design are apart indica - ted

    分別闡述了住宅建築給排水計中,給水、熱水、排水、雨水、空調凝結水管道的敷設要求及材質選擇。
  19. The city was even equipped with a drainage system, for a great many clay pipes were found beneath the narrow streets

    這座城市甚至還過排水系統,因為在窄窄底下發現了許多陶土製
  20. At the same time, constrained by geologic condition and engineering practice, many pipelines have been buried in soft soil

    同時,受地理條件和工程實際限制,許多在軟土地基中。
分享友人